1
Kanpur Dehat
GVPR
20065049
ASAI
3
7
3311
2023
2038
2053
18-Jan-2024
03-Dec-2023
17-Apr-2024
18-Apr-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
2
Shahjahanpur
NCC Ltd.
20015926
Bajpur Kumarikha
1
1
1820
2022
2037
2052
31-Dec-2024
29-Jul-2024
28-Oct-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Bajpur Kumarikha scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Bajpur Kumarikha scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
3
Kanpur Dehat
GVPR
20065061
Balai Bujurg
1
2
2361
2023
2038
2053
18-Jan-2024
31-Dec-2023
09-Apr-2024
10-Apr-2024
Approved
TKC unable to submit the calibration certificate and other report for O&M and Some road restoration and Leakage found Grouting. Ref. SWSM/BLG/TPI/KD/O&M/2025-26/6657 DT.30.07.2025. we can go to O&M through conditional, TKC submit the require document within 15 day's and complete the Balance work.
Approved
All work of scheme found satisfactory
View
4
Shahjahanpur
NCC Ltd.
20019664
Bareng
1
1
2330
2022
2037
2052
20-Sep-2023
31-Dec-2024
30-Dec-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of BARENG scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Bareng scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
5
Kanpur Dehat
GVPR
20065111
Gaijumau
1
6
2957
2023
2038
2053
18-Jan-2024
16-Nov-2023
31-Mar-2024
01-Apr-2024
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
6
Etawah
Indian Hume Pipe
20026316
Ikaghara PWS
1
3
1900
2022
2037
2052
22-Sep-2023
26-Feb-2024
07-Jul-2024
08-Apr-2024
Approved
Dear Sir, the above data has been verified and forwarded to you for further action.
Approved
All work of scheme found satisfactory
View
7
Etawah
Indian Hume Pipe
20026098
Muraitha PWS
1
3
2200
2022
2037
2052
22-Sep-2023
25-Oct-2023
20-May-2023
21-May-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
8
Etawah
Indian Hume Pipe
20026330
Nagaria Bujurg PWS
1
2
1740
2022
2037
2052
22-Sep-2023
15-Dec-2023
16-Apr-2024
17-Apr-2024
Approved
Forwarded for further action.
Approved
All works are satisfactory.
View
9
Kanpur Dehat
GVPR
20053409
Nonari Bujurg
1
2
3842
2023
2038
2053
18-Nov-2023
24-Nov-2023
08-Apr-2024
09-Apr-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
10
Kanpur Dehat
GVPR
20053335
Paharipur
1
6
3833
2023
2038
2053
18-Nov-2023
16-Oct-2023
29-Feb-2024
01-Mar-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
11
Kanpur Dehat
GVPR
20025294
Sunasi
1
8
4981
2023
2038
2053
06-Sep-2023
02-Nov-2023
17-Mar-2024
18-Mar-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
12
Ambedkar Nagar
Vindhya-GAJA (JV)
20019804
Aama & Kardaspur
2
6
2230
2023
2038
2053
03-Aug-2023
20-Jul-2024
05-Dec-2024
06-Dec-2024
Approved
Checked and found ok
Approved
Scheme completed
View
13
Sultanpur
UNIVERSAL MEP
20066908
AARDIH & BAHALOLPUR GROUP OF GRAM PANCHAYAT WATER SUPPLY SCHEME
4
11
4450
2023
2038
2053
12-Jan-2024
12-Jan-2024
26-Nov-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
14
Meerut
Power Mech Projects Ltd
20016936
AASSAA
1
1
3815
2021
2037
2052
31-Dec-2024
05-Feb-2023
25-Jun-2023
17-Feb-2025
Approved
Recommended for Further Approval
Approved
approved
View
15
Bijnor
LC INFRA
20087642
Abdullapur Dahana water supply scheme
1
1
2850
2022
2037
2052
13-Mar-2023
15-Dec-2024
15-Dec-2024
16-Dec-2024
Approved
Every thing completed.
Approved
all document complete
View
16
Bijnor
LC INFRA
20011835
Abdulpur Munna Water Supply Scheme
1
1
2647
2022
2037
2052
09-Feb-2022
08-Aug-2024
08-Aug-2024
09-Aug-2024
Approved
Every thing completed.
Approved
all document complete
View
17
Farrukhabad
Vindhya-GAJA (JV)
20092689
ACHARIYA BAKARPUR MVS
3
5
2236
2023
2038
2053
31-Mar-2025
08-Oct-2024
01-Feb-2025
02-Feb-2025
Approved
OK
Approved
ok
View
18
Ambedkar Nagar
Vindhya-GAJA (JV)
20019914
Adhanpur
1
10
5390
2023
2038
2053
03-Aug-2023
20-Dec-2024
20-Mar-2025
21-Mar-2025
Approved
checked and found ok
Approved
Scheme completed
View
19
Kanpur Dehat
Indian Hume Pipe
20070121
afasariya
1
2
4255
2022
2037
2052
04-Mar-2023
31-Dec-2024
23-Jun-2023
24-Jun-2023
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
20
Ghaziabad
LC INFRA
20100525
AFJALNAGAR SITI VILLAGE WATER SUPPLY SCHEME
1
1
348
2022
2037
2052
25-May-2023
30-Sep-0202
01-Jan-2025
01-Mar-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
All work completed
View
21
Meerut
Power Mech Projects Ltd
20011230
AFZALPUR PAWATI
1
1
3482
2022
2037
2052
31-Dec-2024
07-May-2024
27-Sep-2024
14-Oct-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
22
Ayodhya
UNIVERSAL MEP
20098445
Agethua Gram Panchayat Water Supply Scheme
1
4
1460
2023
2038
2053
21-Jun-2024
12-Jun-2024
12-Jun-2024
01-Feb-2025
Approved
FOUND OK
Pending
View
23
Auraiya
Indian Hume Pipe
20014495
AGHARA PWS
2
6
3900
2022
2037
2052
08-May-2023
19-Dec-2022
25-Mar-2023
26-Mar-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
24
Kannauj
GVPR
20100926
AGOUS GRAMM PANCHAYAT WATER SUPPLY SCHEME
1
7
7444
2023
2038
2053
14-Nov-2024
16-Apr-2024
19-Jul-2024
20-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
25
Fatehpur
Power Mech Projects Ltd
20097449
AHINDA
1
2
1950
2023
2038
2053
18-Mar-2025
30-Jun-2025
07-Dec-2024
08-Dec-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of September(08.09.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
26
Meerut
Power Mech Projects Ltd
20076648
AHMADPUR URF DANDOOPUR
1
1
2334
2023
2038
2053
31-Dec-2024
13-Sep-2024
03-Feb-2025
04-Feb-2025
Approved
Recommended for further Approvals.
Approved
Approved
View
27
Meerut
Power Mech Projects Ltd
20010897
AHMADPURI URF AMANPURI
1
1
2364
2022
2037
2052
31-Dec-2024
11-Feb-2023
30-Jun-2023
31-Dec-2024
Approved
Recommended for further Approval
Approved
approved
View
28
Farrukhabad
Vindhya-GAJA (JV)
20091795
AHMILAPUR MVS
3
3
2767
2023
2038
2053
31-Mar-2025
01-Nov-2024
01-Nov-2024
12-May-2025
Approved
Ok..
Approved
OK
View
29
Ayodhya
UNIVERSAL MEP
20029752
AIHAR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
9
7150
2023
2038
2053
12-Oct-2023
18-Feb-2024
18-Feb-2024
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
30
Rampur
SPML Infra
8362298
AIMI W/S SCHEME
1
1
3160
2022
2037
2052
27-Mar-2023
23-Aug-2023
25-Nov-2023
26-Nov-2023
Approved
Approved
Pending
View
31
Ambedkar Nagar
Vindhya-GAJA (JV)
20026068
AINWA WATER SUPPLY SCHEME
1
3
3600
2023
2038
2053
28-Sep-2023
28-Sep-2024
18-Feb-2025
19-Feb-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme completed
View
32
Kannauj
GVPR
20077070
AIRHO GRAM PANCHAYAT WATER SUPPLY SCHEME
1
3
3409
2023
2038
2053
16-Aug-2024
31-Mar-2024
03-Jul-2024
04-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
33
Ayodhya
UNIVERSAL MEP
20058888
AITHER & KHAIRI WSS
4
9
3050
2023
2038
2053
19-Mar-2024
10-Jun-2024
10-Jun-2024
01-Feb-2025
Approved
FOUND OK
Pending
View
34
Bijnor
LC INFRA
20011272
Ajdev
1
1
1525
2022
2037
2052
10-Feb-2024
20-Dec-2024
18-Jun-2024
19-Jun-2024
Approved
Every thing completed.
Approved
Everything Complete.
View
35
Fatehpur
Power Mech Projects Ltd
20097720
AJDUPUR
3
4
2190
2023
2038
2058
15-May-2023
14-May-2024
13-Oct-2024
13-Jan-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of October(13.10.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
36
Auraiya
GVPR
20039031
Ajnapur pws
3
2
3391
2023
2038
2053
19-Nov-2022
18-Nov-2023
22-Dec-2023
01-Nov-2024
Approved
Forwarded for further action.
Approved
All work of scheme fond satisfactory.
View
37
Hardoi
NCC Ltd.
8362203
AKABARPUR PASNAMAU
1
3
2662
2022
2037
2052
05-Mar-2023
20-Apr-2023
19-Jul-2023
24-Dec-2024
Approved
ok
Approved
OK
View
38
Kanpur Dehat
Indian Hume Pipe
20012613
Akana
1
5
3580
2022
2037
2052
15-Sep-2021
31-Dec-2024
31-Mar-2024
01-Apr-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
39
Shravasti
Larsen & Toubro Ltd
20015328
AKARA PWS
1
2
1849
2022
2037
2052
30-Sep-2023
30-Jun-2023
30-Sep-2023
01-Oct-2023
Approved
ok
Pending
View
40
Bijnor
Vindhya-GAJA (JV)
20100227
AKBARPUR DEVDAS WALA WSS
2
2
1911
2023
2038
2053
06-Jul-2023
02-Jan-2025
02-Jul-2025
03-Jul-2025
Approved
Every thing complete.
Pending
View
41
Meerut
Power Mech Projects Ltd
20020275
AKBARPUR GARHI
1
1
3531
2022
2037
2052
04-Feb-2024
23-Oct-2024
24-Jul-2024
06-Apr-2025
Approved
Recommended for further Approval
Approved
approved
View
42
Meerut
Power Mech Projects Ltd
20025394
Akbarpur sadat
1
1
5052
2022
2037
2052
31-Dec-2024
25-Jan-2023
13-Jun-2023
10-Dec-2024
Approved
CHECKED AND VERIFIED....
Approved
approved
View
43
Bijnor
LC INFRA
20026241
Akbarpurasha Village Water Supply
1
1
4533
2022
2037
2052
18-Aug-2022
11-Jun-2024
11-Jun-2024
12-Jun-2024
Approved
Approve
Approved
Everything Complete.
View
44
Ayodhya
UNIVERSAL MEP
20030018
AKHTIYAR PUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
4
4370
2023
2038
2053
12-Oct-2023
03-Sep-2024
03-Sep-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
45
Meerut
Power Mech Projects Ltd
20074084
AKHTYARPUR
1
1
1989
2022
2037
2052
31-Dec-2024
05-May-2024
21-Sep-2024
01-Oct-2024
Approved
Recommended for further Approvals.
Approved
approved
View
46
Ambedkar Nagar
Vindhya-GAJA (JV)
20026106
AKTHARA NARAYANPUR WATER SUPPLY SCHEME
3
3
2630
2023
2038
2053
28-Sep-2023
28-Sep-2024
08-Feb-2025
09-Feb-2025
Approved
Checked and found ok
Approved
SCHEME COMPLETED
View
47
Ayodhya
VSA
20061731
AKVARA WSS
1
4
2450
2023
2038
2053
21-Feb-2024
30-Mar-2025
02-Aug-2025
14-Aug-2025
Approved
FOUND OK
Pending
View
48
Sultanpur
UNIVERSAL MEP
20071527
ALAHADADPUR&LAKHANPUR GROUP OF PANCHAYAT WATER SUPPLY SCHEME
2
5
4730
2023
2038
2053
22-Mar-2024
22-Mar-2024
02-Mar-2025
01-Apr-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
49
Meerut
Power Mech Projects Ltd
20031779
ALAMGIRPUR FARIDPUR & RAJPUR MOMIN
2
2
2398
2023
2038
2053
31-Dec-2024
22-Mar-2024
08-Aug-2024
02-Mar-2025
Approved
Recommended for Further Approval
Approved
approved
View
50
Meerut
Power Mech Projects Ltd
8362074
ALAMPUR BUZURG
1
1
2274
2022
2037
2052
07-Mar-2023
10-Dec-2022
28-Apr-2023
30-Jan-2025
Approved
Recommended for further Approval
Approved
approved
View
51
Mainpuri
NCC Ltd.
8361881
ALAMPUR DEHAT VILLAGE WATER SUPPLY SCHEME
1
2
5662
2022
2037
2052
17-Apr-2023
15-Apr-2023
15-Jul-2023
22-Nov-2024
Approved
Recommended for approval.
Approved
ok
View
52
Kanpur Dehat
GVPR
20077590
ALAMPUR KHERA
2
6
2403
2023
2038
2053
17-Feb-2024
22-Jul-2024
05-Dec-2024
06-Dec-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
53
Hardoi
NCC Ltd.
20011375
ALAPUR
1
1
1390
2022
2037
2052
26-Jul-2023
17-Jan-2023
16-Apr-2023
24-Dec-2024
Approved
ok
Approved
OK
View
54
Kanpur Dehat
Indian Hume Pipe
20012654
Alapur
1
2
2820
2022
2037
2052
12-Oct-2022
20-Dec-2022
31-Mar-2023
01-Apr-2023
Approved
Forward for further action pls
Approved
All work of scheme found satisfactory
View
55
Gautam Buddha Nagar
LC INFRA
20013513
ALAUDDINNPUR URF DUDHERA VILLAGE WATER SUPPLY SCHEME
1
1
1832
2022
2037
2052
07-Feb-2024
01-Nov-2024
01-Aug-2024
01-Nov-2024
Approved
Project certificate is verified
Pending
View
56
Ambedkar Nagar
Vindhya-GAJA (JV)
20026069
ALAWALPUR WATER SUPPLY SCHEME
1
6
2340
2023
2038
2053
28-Sep-2023
30-Jun-2024
30-Sep-2023
01-Oct-2024
Approved
Checked and found OK
Approved
Scheme completed
View
57
Bijnor
LC INFRA
20068069
ALEALIPUR WATER SUPPLY SCHEME
3
3
2180
2022
2037
2052
23-Jan-2023
16-May-2025
16-May-2025
17-May-2025
Approved
Every thing complete.
Approved
Every thing is Completed.
View
58
Kannauj
GVPR
20050191
ALHANAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
3
5
2688
2023
2038
2053
15-Jun-2024
16-Mar-2024
19-Jun-2024
20-Jun-2024
Approved
Forwarded for further action.
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
59
Bijnor
LC INFRA
20011662
Alipur Damodar Village Water Supply Scheme
2
2
2454
2022
2037
2052
10-Feb-2024
10-Dec-2023
08-Jun-2024
09-Jun-2024
Approved
Every thing completed.
Approved
Everything Completed
View
60
Meerut
Power Mech Projects Ltd
20058121
ALIPUR MORNA & GAJROLA
2
2
4940
2023
2038
2053
31-Dec-2024
16-Aug-2024
05-Jan-2025
06-Jan-2025
Approved
Recommended for further Approvals.
Approved
Approved
View
61
Auraiya
GVPR
20064155
Alipur PWS
2
5
4040
2023
2038
2053
06-Jan-2022
05-Dec-2024
04-Dec-2024
06-Dec-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
62
Kanpur Dehat
GVPR
20065029
ALIPUR RAMHAR
2
3
2980
2023
2038
2053
18-Jan-2024
20-Nov-2023
25-Feb-2024
26-Feb-2024
Approved
TKC unable to submit the calibration certificate and other report for O&M and some work pending ( Painting work {Pump House, Boundary wall & Gate}, Grouting. Ref. SWSM/BLG/TPI/KD/O&M/2025-26/6657 DT.30.07.2025. we can go to O&M through conditional, TKC submit the require document within 15 day's and complete the Balance work.
Approved
All work of scheme found satisfactory
View
63
Kanpur Dehat
GVPR
20069947
Aliyapur
1
1
1840
2023
2038
2053
17-Feb-2024
20-Nov-2023
25-Feb-2024
26-Feb-2024
Approved
Forward for necessary action
Approved
All work of scheme found satisfactory
View
64
Gautam Buddha Nagar
LC INFRA
20017811
ALLI AHAMADPUR URF GRAHI
1
1
1298
2022
2037
2052
07-Feb-2024
10-Jul-2025
10-Apr-2025
10-Jul-2025
Approved
Project certificate is verified
Pending
View
65
Fatehpur
Power Mech Projects Ltd
20095164
ALLIPUR
1
3
4630
2023
2038
2053
14-May-2024
30-Jun-2024
12-Jan-2024
12-Feb-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of September (19.09.2024).
Approved
Verified
View
66
Mau
GA INFRA-VPL
20102138
Allipur Water Supply Scheme
1
1
810
2023
2038
2053
20-Oct-2024
20-Oct-2024
20-Jan-2025
20-Jan-2025
Approved
Approved..
Approved
Approved
View
67
Bijnor
Vindhya-GAJA (JV)
20102309
AMANATPUR WSS
1
1
1831
2023
2038
2053
06-Jul-2023
09-Jul-2024
09-Jan-2025
10-Jan-2025
Approved
Every thing complete.
Approved
everything complete
View
68
Meerut
Power Mech Projects Ltd
20098079
AMANULLAPUR
1
1
2415
2023
2038
2053
31-Dec-2024
05-Sep-2024
24-Jan-2025
25-Jan-2025
Approved
Recommended for further Approvals.
Approved
Approved
View
69
Gautam Buddha Nagar
LC INFRA
20017813
AMANULLAPUR URF MAHARA
1
1
4770
2022
2037
2052
20-Mar-2023
30-Apr-2023
31-Oct-2024
01-Nov-2024
Approved
Project certificate is verified
Approved
Verified
View
70
Mau
LC INFRA
20080869
AMARHAT VILLAGE WATER SUPPLY SCHEME
1
4
2069
2022
2037
2052
12-Aug-2024
10-Mar-2024
14-Jun-2024
18-Dec-2024
Approved
All Documents verified & Checked
Approved
Approve for O&M
View
71
Meerut
Power Mech Projects Ltd
20011307
AMARPUR MAZRA KHANDAWLI
1
1
2760
2022
2037
2052
31-Dec-2024
28-Feb-2024
20-Mar-2023
10-Nov-2024
Approved
Recommended for further Approvals.
Approved
approved
View
72
Meerut
Power Mech Projects Ltd
20082551
AMARSINGHPUR DAYALPUR
2
2
4920
2023
2038
2053
31-Dec-2024
05-Jun-2024
23-Oct-2024
24-Oct-2024
Approved
Recommended for further Approvals.
Approved
approved
View
73
Sultanpur
UNIVERSAL MEP
20064942
AMATHA GRAM PANCHAYAT WATER SUPPLY
2
5
3450
2023
2038
2053
12-Jan-2024
12-Jan-2024
30-Mar-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
74
Ambedkar Nagar
Vindhya-GAJA (JV)
20026029
AMAULI MOHIDDINPUR WATER SUPPLY SCHEME
2
7
4910
2023
2038
2053
28-Sep-2024
12-Jun-2025
12-Jun-2025
13-Jun-2025
Approved
Scheme completed and ready for O&M
Approved
CHECKED AND FOUND OK
View
75
Kanpur Dehat
GVPR
20025235
AMAULI THAKURAN
2
4
3807
2023
2038
2053
26-Sep-2023
20-Nov-2023
05-Apr-2024
06-Apr-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
76
Fatehpur
Power Mech Projects Ltd
20097763
AMBI, HARI RAMPUR KAITHOLA
4
5
3840
2023
2038
2053
14-May-2024
30-Jun-2025
29-Apr-2025
30-Apr-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of January(30.01.2025) and Regular water supply is given to the consumers.
Approved
Verified
View
77
Hardoi
NCC Ltd.
20012430
Amethiya Msinha
2
5
2680
2022
2037
2052
26-Jul-2023
28-Jun-2023
27-Sep-2023
25-Dec-2024
Approved
ok
Approved
OK
View
78
Meerut
Power Mech Projects Ltd
20020200
AMHERA ADIPUR
1
1
6489
2022
2037
2052
31-Dec-2024
15-Sep-2024
01-Feb-2025
20-Jun-2025
Approved
Recommended for further Approvals.
Approved
approved
View
79
Hardoi
NCC Ltd.
20012379
AMIRATA BADARAIYA
5
9
4420
2022
2037
2052
14-Jun-2023
17-Jan-2023
16-Apr-2023
24-Dec-2024
Approved
ok
Approved
OK
View
80
Banda
NCC Ltd.
8134904
Amlikaur GOV and Tubewell Scheme 28 Nos.
202
202
959697
2023
2038
2053
08-Nov-2022
28-Feb-2025
28-Feb-2025
03-Mar-2025
Approved
Checked & OK
Approved
as per TPI recommendation forwarded
View
81
Ayodhya
UNIVERSAL MEP
20030445
AMRAIGAON GRAM PANCHAYAT WATER SUPPLY SCHEME
2
8
6230
2023
2038
2053
12-Oct-2023
31-Jul-2024
31-Jul-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
82
Meerut
Power Mech Projects Ltd
20020202
AMROLI URF BARAGOAN
1
1
4936
2023
2038
2053
31-Dec-2024
09-Dec-2023
26-Apr-2024
17-Feb-2025
Approved
Recommended for Further Approval
Approved
approved
View
83
Fatehpur
Power Mech Projects Ltd
20097498
AND MAW
1
1
1640
2023
2038
2053
20-Sep-2024
16-Feb-2025
15-Feb-2025
16-Feb-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of November (14.11.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
84
Meerut
Power Mech Projects Ltd
20031774
ANDAWALI & BEHTA
2
2
2256
2022
2037
2052
31-Dec-2024
16-Mar-2024
02-Aug-2024
26-Dec-2024
Approved
Recommended for further Approval
Approved
approved
View
85
Fatehpur
Power Mech Projects Ltd
20106718
ANDMAU GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
1750
2023
2033
2053
25-Sep-2024
30-Jun-2025
26-Jan-2025
27-Jan-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of October (27.10.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
86
Bijnor
LC INFRA
20038186
Anesnangli Gram Panchayat Water Supply
1
1
2371
2022
2037
2052
14-Nov-2022
30-Dec-2024
31-Mar-2025
01-Apr-2025
Approved
Every thing complete.
Approved
Every thing is Completed.
View
87
Kanpur Dehat
Indian Hume Pipe
20012981
Angadpur
2
3
2640
2022
2037
2052
05-Feb-2022
31-Dec-2024
31-Aug-2023
01-Sep-2023
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
88
Amethi
Vindhya-GAJA (JV)
20085692
ANI BAIJAL WATER SUPPLY SCHEME
1
5
3687
2023
2038
2053
29-Apr-2024
14-Aug-2024
15-Nov-2024
16-Feb-2025
Approved
Hardcopy submiited and all documents found okay..
Approved
Hardcopy submitted and found okay as per the submitted documents..
View
89
Shahjahanpur
NCC Ltd.
8361712
ANWAS DUGAIYA GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME
2
2
2420
2022
2037
2052
30-Sep-2023
31-Dec-2024
30-Dec-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Anwas Dugaiya scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Anwas Digaiya scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
90
Ambedkar Nagar
Vindhya-GAJA (JV)
20026109
AREEFPUR SARI WATER SUPPLY SCHEME
2
2
3150
2023
2038
2053
28-Sep-2023
14-Nov-2024
05-Dec-2024
06-Dec-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme completed
View
91
Amethi
Vindhya-GAJA (JV)
20085680
ARGWAN & SAKRAWA WATER SUPPLY SCHEME
4
8
4459
2023
2038
2053
28-Apr-2024
20-Jun-2024
20-Sep-2024
21-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents.
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance...
View
92
Kanpur Dehat
Indian Hume Pipe
20012955
Arhariyamau
2
2
2580
2022
2037
2052
05-Feb-2022
31-Dec-2023
31-Mar-2023
01-Apr-2023
Approved
Forward for further necessary action
Approved
All work of scheme found satisfactory
View
93
Kannauj
GVPR
20066523
ARIFPUR & SARAI BHAMAL GRAM PANCHAYAT WATER SUPPLY SCHEME
2
3
3135
2023
2038
2053
16-Aug-2024
10-Nov-2024
14-Feb-2025
15-Feb-2025
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
94
Mau
LC INFRA
8359725
ARIYASO VILLAGE RURAL WATER SUPPLY SCHEME
2
3
2301
2022
2037
2052
26-Aug-2023
10-Dec-2024
09-Dec-2024
10-Dec-2024
Approved
Approved
Approved
Approved.
View
95
Sultanpur
UNIVERSAL MEP
20092610
ARWAL& CHAK SHIVPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
2
5
5010
2023
2038
2053
12-Jan-2024
31-Dec-2024
01-Mar-2025
01-Apr-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
96
Etawah
Indian Hume Pipe
20024498
ASADPUR PWS
2
2
2900
2022
2037
2052
22-Sep-2023
19-Dec-2024
16-May-2024
17-May-2024
Approved
Forwarded to you for further action.
Approved
All work of scheme found satisfactory.
View
97
Kannauj
GVPR
20100936
ASAFPUR PATTI GRAMM PANCHAYAT WATER SUPPLY SCHEME
1
1
753
2023
2038
2053
14-Nov-2024
22-Mar-2024
24-Jun-2024
25-Jun-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
98
Kannauj
GVPR
20067304
ASALTABAD GRAM PANCHAYAT WATER SUPPLY SCHEME
1
12
6548
2023
2038
2053
08-Sep-2024
04-Apr-2024
07-Jul-2024
08-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
99
Meerut
Power Mech Projects Ltd
20058475
ASFABAD & SHAMASPUR
2
2
4439
2023
2038
2053
31-Dec-2024
06-Sep-2024
24-Oct-2025
10-Mar-2025
Approved
Recommended for further Approval
Approved
approved
View
100
Hardoi
NCC Ltd.
20012353
Asgarpur
2
4
2240
2022
2037
2052
26-Jul-2023
13-Dec-2023
14-Mar-2024
07-Dec-2024
Approved
ok
Approved
OK
View
101
Ambedkar Nagar
Vindhya-GAJA (JV)
20033756
ASHARFABAD WATER SUPPLY SCHEME
2
7
4220
2023
2038
2053
21-Oct-2023
30-Jun-2024
30-Sep-2024
01-Oct-2024
Approved
Checked and found OK
Approved
Scheme completed
View
102
Raebareli
NCC Ltd.
20064085
Ashrafabad WATER SUPPLY SCHEME
2
4
1410
2022
2037
2052
16-Sep-2024
21-Jul-2024
23-Jun-2024
21-Nov-2024
Approved
Ok
Approved
Ok
View
103
Amethi
Vindhya-GAJA (JV)
20066626
ASNI1 WATER SUPPLY SCHEME
1
3
2728
2023
2038
2053
06-Jan-2024
19-Jun-2024
19-Sep-2024
20-Dec-2024
Approved
All Document not provided by EPC hence returns to the EPC
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
View
104
Sultanpur
UNIVERSAL MEP
20066080
ASRAFPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
5
3040
2023
2038
2053
12-Jan-2024
12-Jan-2024
04-Dec-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
105
Ambedkar Nagar
Vindhya-GAJA (JV)
20041463
ASTABAD WSS
3
5
3890
2023
2038
2053
23-Nov-2023
23-Dec-2024
23-Dec-2024
24-Dec-2024
Approved
Scheme completed and ready for O&M
Approved
Scheme completed
View
106
Shahjahanpur
NCC Ltd.
20015760
Astoli
1
3
3390
2022
2037
2052
31-Aug-2023
31-Dec-2024
30-Nov-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Astoli scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Astoli scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
107
Sultanpur
UNIVERSAL MEP
20066093
ATAR SUMA KALAN GRAM PANCHAYAT WATER SUPPLY SCHEME
1
6
2725
2023
2038
2053
12-Jan-2024
12-Jan-2024
29-Jun-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
108
Meerut
Power Mech Projects Ltd
20076613
ATAULA
1
1
2550
2023
2038
2053
31-Dec-2024
10-Oct-2024
26-Feb-2025
27-Feb-2025
Approved
Recommended for further Approvals.
Approved
approved
View
109
Meerut
Power Mech Projects Ltd
8362367
ATERNA
1
1
3375
2022
2037
2052
31-Dec-2024
15-Mar-2023
01-Aug-2023
01-Nov-2024
Approved
Recommended for further Approval
Approved
approved
View
110
Kanpur Dehat
GVPR
20053176
ATIYA RAIPUR
1
2
2875
2023
2038
2053
18-Nov-2023
26-Dec-2023
10-May-2024
11-May-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
111
Hardoi
NCC Ltd.
20000036
ATWA ASIGAON 0111
1
6
5460
2022
2037
2052
29-Apr-2023
02-Oct-2023
01-Jan-2024
30-Nov-2024
Approved
ok
Approved
OK
View
112
Kanpur Dehat
Indian Hume Pipe
8362825
AUNDERI
1
1
3260
2022
2037
2052
15-Sep-2021
31-Dec-2024
30-Sep-2023
01-Oct-2023
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
113
Kanpur Dehat
GVPR
20053080
AURANGABAD DALCHAND
1
6
3055
2023
2038
2053
18-Nov-2023
15-Dec-2023
22-Mar-2024
23-Mar-2024
Approved
Forward for Further action
Approved
All work of scheme found satisfactory
View
114
Ghaziabad
LC INFRA
20017652
Aurangabad dateri PWS scheme
1
1
3251
2022
2037
2052
27-Mar-2022
31-Oct-2024
28-Feb-2025
01-Mar-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
all work has been completed
View
115
Kanpur Dehat
GVPR
20077371
AURANGABAD HEERAMANSHA ANANATPUR DHAUKAL
2
4
3381
2023
2038
2053
17-Feb-2024
28-Jan-2024
01-May-2024
02-May-2024
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
116
Gautam Buddha Nagar
LC INFRA
20035303
AURANGABAD URF HUMYAUNPUR WATER SUPPLY SCHEME
1
1
790
2022
2037
2052
20-Mar-2024
30-Jan-2024
30-Mar-2024
01-Apr-2024
Approved
Project certificate is verified.
Approved
Verified
View
117
Bijnor
LC INFRA
20051583
AURANGJEBPUR MAHMUD
3
3
6318
2022
2037
2052
18-Jan-2025
18-Jan-2025
18-Jan-2025
19-Jan-2025
Approved
Every thing completed.
Approved
Everything Completed
View
118
Auraiya
GVPR
20040135
Avavar
4
3
4933
2023
2038
2053
11-Dec-2023
25-Mar-2024
06-Aug-2023
11-Jan-2024
Approved
Forwarded for further action.
Pending
View
119
Bijnor
LC INFRA
20016840
AZAMABAD & NAIBPUR SADAT WATER SUPPLY SCHEME
2
2
1988
2022
2037
2052
02-Nov-2021
16-Dec-2024
16-Dec-2024
17-Dec-2024
Approved
Every thing complete.
Approved
Everything Completed.
View
120
Meerut
Power Mech Projects Ltd
20066830
AZAMPUR
1
1
2033
2023
2038
2053
31-Dec-2024
02-Jun-2024
19-Oct-2024
20-Oct-2024
Approved
Recommended for further Approvals.....................................
Approved
Approved
View
121
Sultanpur
UNIVERSAL MEP
20064718
BABHANGOAN GRAM PANCHAYAT WATER SUPPLY SCHEME
1
3
2740
2023
2038
2053
12-Jan-2024
12-Jan-2024
12-Feb-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
122
Ayodhya
UNIVERSAL MEP
20030285
BABHANIYAVAN GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
2130
2023
2038
2053
12-Oct-2023
16-Feb-2024
16-Feb-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
123
Auraiya
GVPR
20091181
Babina sukhchainpur PWS
2
2
1704
2023
2038
2053
06-Jan-2022
06-Jul-2024
06-Jun-2024
07-Jun-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
124
Amethi
Vindhya-GAJA (JV)
20066413
babu pur Sharia water supply Scheme
1
5
3301
2023
2038
2053
06-Jan-2024
12-Nov-2024
12-Feb-2025
13-May-2025
Approved
All Document not provided by EPC hence returns to the EPC
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
View
125
Kanpur Dehat
GVPR
20065041
BACHEET BHARTHU
1
1
2633
2023
2038
2053
18-Jan-2024
27-Jul-2023
12-Dec-2023
13-Dec-2023
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
126
Jhansi
NCC Ltd.
8009988
Bacholi Bauzurg GOV
37
7596
80591
2023
2038
2053
30-Jun-2022
30-Aug-2023
20-Jan-2025
21-Jan-2025
Approved
checked
Approved
checked
View
127
Amethi
Vindhya-GAJA (JV)
20065721
BADAGAON WATER SUPPLY SCHEME
1
5
4132
2023
2038
2053
09-Jan-2023
04-Jun-2024
04-Sep-2024
05-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents.
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance..
View
128
Amethi
Vindhya-GAJA (JV)
20066484
BADALGARH & BAKHTWARNAGAR WATER SUPPLY SCHEME
1
8
3510
2023
2038
2053
06-Jan-2024
14-May-2024
13-Sep-2024
14-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents.
Approved
Hardcopy submitted and found okay as per the submitted documents..
View
129
Siddharth Nagar
Megha
20021817
BADEHAR GRANT
1
2
2227
2022
2037
2052
31-Dec-2025
02-Apr-2025
15-Jan-2025
12-Apr-2025
Approved
All documents verified and found as per guideline of SWSM. Sending for further process
Pending
View
130
Sultanpur
UNIVERSAL MEP
20066301
BADHANPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
2
7
2436
2023
2038
2053
12-Jan-2024
12-Jan-2024
28-Jun-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
131
Auraiya
GVPR
20025452
BADIN PWS
3
8
5430
2023
2038
2053
01-Jun-2024
29-Nov-2023
12-Oct-2023
30-Nov-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
132
Etawah
Indian Hume Pipe
20024485
Badri Pooth PWS
2
4
3330
2022
2037
2052
22-Sep-2023
15-Mar-2024
21-Jun-2024
22-Jun-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
133
Auraiya
GVPR
20065263
Badshahpur chhonk PWS
2
6
2640
2023
2038
2053
01-Jun-2022
24-Aug-2024
07-Jul-2024
25-Aug-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
134
Auraiya
GVPR
20088695
Badua Maharaj pur bhadursingh, Phaphund dehat PWS
1
3
3254
2023
2033
2053
06-Jan-2022
26-Jan-2025
25-Jan-2025
27-Jan-2025
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
135
Meerut
Power Mech Projects Ltd
20066756
BAFAR
1
1
2881
2023
2038
2053
31-Dec-2024
20-Jul-2024
06-Dec-2024
07-Dec-2024
Approved
Recommended for further Approvals
Approved
approved
View
136
Bijnor
LC INFRA
20017058
Bahadarpur Sharfuddin Husain Water Supply
1
1
3393
2022
2037
2052
02-Nov-2023
12-Sep-2024
12-Mar-2025
13-Mar-2025
Approved
Every thing complete
Approved
Every thing complete
View
137
Kanpur Dehat
GVPR
20053135
Bahadurpur
1
7
2679
2023
2038
2053
18-Nov-2023
15-Jan-2024
30-May-2024
31-May-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
138
Meerut
Power Mech Projects Ltd
20098085
BAHADURPUR
1
1
3229
2023
2038
2053
11-Jun-2025
15-Jun-2024
01-Nov-2024
02-Nov-2024
Approved
Recommended for further Approvals.
Pending
View
139
Meerut
Power Mech Projects Ltd
8362075
BAHADURPUR
1
1
3080
2022
2037
2052
31-Dec-2024
30-Jan-2023
18-Jun-2023
19-Dec-2024
Approved
Recommended for further Approval
Approved
approved
View
140
Auraiya
GVPR
20025226
Bahadurpur Inguthiya
1
3
3024
2023
2038
2053
06-Jan-2022
08-Sep-2023
13-May-2023
28-Jun-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
141
Kannauj
GVPR
20077131
BAHADURPUR MAJHGAWAN GRAM PANCHAYAT WATER SUPPLY SCHEME
1
6
4590
2023
2038
2053
08-Sep-2024
22-Apr-2024
26-Jul-2024
27-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
142
Auraiya
GVPR
20025453
BAHDHMAU
1
1
3047
2023
2038
2053
06-Jan-2022
31-Dec-2024
24-Nov-2023
10-Jan-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
143
Kannauj
GVPR
20090084
BAHERA GRAM PANCHAYAT WATER SUPPLY SCHEME
1
5
1514
2023
2038
2053
08-Sep-2024
16-Jan-2025
17-Apr-2025
18-Apr-2025
Approved
Forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
144
Kannauj
GVPR
20077121
BAHISHAR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
6
4309
2023
2038
2053
08-Sep-2024
04-Apr-2024
07-Jul-2024
08-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
145
Ambedkar Nagar
Vindhya-GAJA (JV)
20026118
BAHLOLPUR WATER SUPPLY SCHEME
2
4
2790
2023
2038
2053
29-Sep-2022
28-Sep-2023
23-Mar-2025
24-Mar-2025
Approved
checked and verified
Approved
Scheme completed
View
146
Meerut
Power Mech Projects Ltd
20020833
BAHRALA & IKLAUTA
2
2
3080
2022
2037
2052
04-Feb-2024
24-Dec-2023
12-May-2024
06-Apr-2025
Approved
Recommended for further Approval
Approved
approved
View
147
Ayodhya
UNIVERSAL MEP
20059079
BAIDRAPUR WSS
3
9
3110
2023
2038
2053
19-Mar-2024
23-Aug-2024
23-Aug-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
148
Balrampur
Larsen & Toubro Ltd
8361251
Baijpur
2
3
2802
2022
2037
2052
29-Jun-2023
30-May-2024
30-Aug-2024
30-Aug-2024
Approved
OK
Pending
Reject due to incomplete data
View
149
Ambedkar Nagar
Welspun Kaveri Infraprojects JV
20009905
BAIJUPUR
1
8
2080
2022
2037
2052
11-Apr-2023
08-Apr-2025
08-Apr-2025
02-Jul-2025
Approved
SCHEME COMPLETED
Approved
BAIJPUR SCHEME COMPLETED
View
150
Farrukhabad
Vindhya-GAJA (JV)
20092448
BAIRAMPUR MVS
2
2
1755
2023
2038
2053
31-Mar-2025
20-Apr-2024
01-Aug-2024
12-May-2025
Approved
All the parameters of scheme verified can take in O&M
Approved
ok
View
151
Kanpur Dehat
Indian Hume Pipe
20034277
BAIRI DARIYON
1
4
3170
2022
2037
2052
24-Nov-2022
23-Nov-2023
31-Mar-2023
01-Apr-2023
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
152
Kanpur Dehat
GVPR
20025219
Bairisal
1
3
4740
2023
2038
2053
26-Sep-2023
10-Nov-2023
17-Feb-2024
18-Feb-2024
Approved
TKC unable to submit the calibration certificate and other report for O&M . Ref. SWSM/BLG/TPI/KD/NS/2025-26/6653 DT.18.07.2025. we can go to O&M through conditional, TKC submit the require document within 15 day's
Approved
All work of scheme found satisfactory
View
153
Amethi
Gayatri Projects LTD
20072844
BAISARA WATER SUPPLY SCHEME
2
13
2938
2022
2037
2052
13-Mar-2025
07-Sep-2024
05-Dec-2024
10-Mar-2025
Approved
Hardcopy submiited and all documents found okay..
Pending
View
154
Meerut
Power Mech Projects Ltd
20023019
BAJAUT PWS
1
1
2395
2022
2037
2052
31-Dec-2024
25-May-2024
13-Oct-2024
14-Oct-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
155
Farrukhabad
Vindhya-GAJA (JV)
20093035
BAJHERA MALIK PATTI SVS
1
2
1390
2023
2038
2053
30-May-2025
31-Mar-2025
31-Mar-2025
01-Apr-2025
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
156
Bijnor
LC INFRA
8361058
BAJIDPUR VILLAGE WATER SCHEME
1
2
1981
2022
2037
2052
29-Sep-2023
12-Dec-2023
10-Jun-2024
11-Jun-2024
Approved
Every thing completed.
Approved
All document complete
View
157
Azamgarh
LC INFRA
20101554
Bakashpur Rural Water Supply Scheme
2
4
3959
2023
2038
2053
10-Aug-2023
11-Jan-2024
11-Apr-2024
12-Apr-2024
Approved
Ok
Approved
OK
View
158
Sultanpur
UNIVERSAL MEP
20064752
BALAPASHCHIM GRAM PANCHAYAT WATER SUPPLY SCHEME
1
7
4660
2023
2038
2053
12-Jan-2024
12-Jan-2024
12-Feb-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
159
Gautam Buddha Nagar
LC INFRA
8389568
BALLABH NAGAR URF KARROL BANGAR GRAM PANCHAYAT WATER SUPPLY
1
1
2023
2022
2037
2052
07-Feb-2024
10-Nov-2024
10-Sep-2024
10-Nov-2024
Approved
Project certificate is verified
Pending
View
160
Bijnor
LC INFRA
20095825
BAMNOLI VILLAGE WSS
2
2
3531
2022
2037
2052
13-Apr-2023
20-Feb-2025
20-Feb-2025
21-Feb-2025
Approved
Every thing complete.
Approved
All document complete
View
161
Shahjahanpur
NCC Ltd.
20016412
BAMRAULI
1
2
1640
2022
2037
2052
31-Jul-2023
31-Dec-2024
30-Oct-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Bamrauli scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Bamrauli scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
162
Kanpur Dehat
GVPR
20077609
banaralipur & swarooppur
2
2
4551
2023
2038
2053
17-Feb-2024
25-Feb-2024
25-May-2024
26-May-2024
Approved
Forward for Necessary action
Approved
All work of scheme found satisfactory
View
163
Ghaziabad
LC INFRA
20094886
BANDIPUR VILLAGE WATER SUPPLY SCHEME
1
1
2058
2022
2037
2052
01-Oct-2024
30-Nov-2024
31-Mar-2025
01-Apr-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
Approved
View
164
Amethi
Vindhya-GAJA (JV)
20098342
BANDOIYA Water Supply Scheme
1
2
1498
2023
2038
2053
04-Jul-2024
26-Jun-2024
26-Sep-2024
27-Dec-2024
Approved
All Document not provided by EPC hence returns to the EPC
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
View
165
Ayodhya
UNIVERSAL MEP
20058408
Bangaona And Firozpur pawaran WSS
2
2
4390
2023
2038
2053
22-Jan-2024
09-May-2024
09-May-2024
01-Feb-2025
Approved
FOUND OK
Pending
View
166
Amethi
Gayatri Projects LTD
20085728
BANHAPUR WATER SUPPLY SCHEME
2
4
2431
2023
2038
2052
22-Sep-2024
07-Jun-2024
10-Sep-2024
21-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance
View
167
Bahraich
PNC-SPML-JV
20017926
BANIA HARI CHITTAURA PWS
1
6
3610
2022
2037
2052
31-Dec-2025
16-Oct-2025
16-Oct-2025
17-Oct-2025
Approved
scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/11/0064 kindly complete it.
Approved
Scheme Completed
View
168
Kanpur Dehat
GVPR
20077456
BANIPARA DAGRAHA
2
4
3696
2023
2038
2053
17-Feb-2024
22-Dec-2023
06-May-2024
07-May-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
169
Mau
LC INFRA
8375486
BANIYAPAR GRAM PANCHAYAT RURAL WATER SUPPLY SCHEME
2
4
2500
2022
2037
2052
02-May-2023
06-Jul-2023
07-Jun-2024
26-Nov-2024
Approved
All Documents verified & Checked
Approved
Approved
View
170
Ayodhya
UNIVERSAL MEP
20030438
BANMAU & MIRMAU GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME
2
5
5710
2023
2038
2053
12-Oct-2023
15-Mar-2024
15-Mar-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
171
Kannauj
GVPR
20067615
BANPUR RUDAULI NARAYANPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
2278
2023
2038
2053
16-Aug-2024
14-Mar-2024
14-Jun-2024
15-Jun-2024
Approved
Forwarded for further action.
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
172
Sultanpur
UNIVERSAL MEP
20066527
BANSI & UTARDAHA GRAM PANCHAYAT WATER SUPPLY SCHEME
2
3
4900
2023
2038
2053
12-Jan-2024
12-Jan-2024
21-Jan-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
173
Lakhimpur Kheri
NCC Ltd.
8360567
Banstali
1
6
2211
2022
2037
2052
09-Apr-2023
04-Feb-2023
20-May-2023
20-Nov-2024
Approved
Approved as per check list
Approved
Found Ok
View
174
Hardoi
NCC Ltd.
20008678
Banta Kamalpur
1
1
2160
2022
2037
2052
05-Mar-2023
01-Dec-2022
01-Mar-2023
25-Dec-2024
Approved
ok
Approved
OK
View
175
Meerut
Power Mech Projects Ltd
20092218
BAPARSA
1
1
3105
2022
2037
2052
31-Dec-2024
14-Aug-2024
02-Jan-2025
03-Jan-2025
Approved
Recommended for further Approvals.
Approved
approved
View
176
Meerut
Power Mech Projects Ltd
20067091
BAPARSI
1
1
4118
2022
2037
2052
31-Dec-2024
01-Aug-2024
20-Dec-2024
21-Dec-2024
Approved
Recommended for further Approvals.......................
Approved
APPROVED
View
177
Kanpur Dehat
GVPR
20077333
Baragaon & khalakpur
3
6
4328
2023
2038
2053
17-Feb-2024
14-Nov-2023
29-Mar-2024
30-Mar-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
178
Kanpur Dehat
GVPR
20065069
BARAGAON BHIKKI
2
4
3204
2023
2038
2053
18-Jan-2024
12-Oct-2023
29-Mar-2024
30-Mar-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
179
Fatehpur
Power Mech Projects Ltd
20095835
BARAHATA
1
2
2210
2023
2038
2053
15-May-2023
30-Jun-2025
12-Dec-2024
13-Mar-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of December (12.12.2024)
Approved
Verified
View
180
Ayodhya
UNIVERSAL MEP
20059048
BARAI KALA & SIWAR WSS
2
5
4690
2023
2038
2053
19-Mar-2024
14-Jan-2025
14-Jan-2025
01-Feb-2025
Approved
FOUND OK
Pending
View
181
Fatehpur
Power Mech Projects Ltd
20097775
BARAICHA
2
2
2360
2023
2038
2058
14-Aug-2023
30-Jun-2025
04-Dec-2024
05-Dec-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of September (05.09.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
182
Fatehpur
Power Mech Projects Ltd
20102049
BARAICHI
1
1
1950
2023
2038
2053
20-Sep-2024
19-Mar-2025
18-Mar-2025
19-Mar-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of December (19.12.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
183
Kannauj
GVPR
20036218
BARAMAU BANGER PEYJAL YOJNA
1
5
3422
2023
2038
2053
13-May-2024
22-Apr-2024
26-Jul-2024
27-Jul-2024
Approved
forwarded for further action
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
184
Bijnor
LC INFRA
8388820
BARAMJITPUR CHANDA GRAMPANCHAYAT WATER SUPPLY SCHEME
2
2
2478
2022
2037
2052
29-Sep-2021
10-Jun-2024
08-Jun-2024
09-Jun-2024
Approved
every thing completed
Approved
every thing completed
View
185
Fatehpur
Power Mech Projects Ltd
20097451
BARANPUR
1
1
2360
2023
2038
2053
20-Sep-2024
19-Jan-2025
18-Jan-2025
19-Jan-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of October (17.10.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
186
Kanpur Dehat
GVPR
20095626
Barar
2
2
1730
2023
2038
2053
30-Nov-2023
02-Jan-2024
03-Apr-2024
04-Apr-2024
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
187
Fatehpur
Power Mech Projects Ltd
20097777
BARAR,GAZIPUR
3
17
4970
2023
2038
2053
14-May-2024
30-Jun-2025
12-Sep-2024
12-Oct-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of September (10.09.2024)
Approved
Verified
View
188
Auraiya
GVPR
20099164
Barau PWS
1
2
1448
2023
2038
2053
21-Jun-2024
06-Apr-2024
19-Feb-2024
07-Apr-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
189
Ayodhya
UNIVERSAL MEP
20031481
BARAULI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
3
2950
2023
2038
2053
12-Oct-2023
26-Oct-2023
26-Oct-2023
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
190
Kannauj
GVPR
20098265
BARAULI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
7
3935
2023
2038
2053
14-Nov-2024
22-Apr-2024
26-Jul-2024
27-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
191
Ayodhya
UNIVERSAL MEP
20030453
BARELA GRAM PANCHAYAT WATER SUPPLY SCHEME
2
6
3550
2023
2038
2053
12-Oct-2023
08-Mar-2024
08-Mar-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
192
Kanpur Dehat
VSA
20094193
Bargawan
1
1
1691
2023
2038
2023
30-Apr-2023
31-Dec-2023
07-May-2024
08-May-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
193
Meerut
Power Mech Projects Ltd
8362768
BARHANPUR
1
1
2192
2022
2037
2052
31-Dec-2024
27-Feb-2024
20-Mar-2023
07-Oct-2024
Approved
Recommended for further Approvals.
Approved
approved
View
194
Hardoi
NCC Ltd.
20011901
BARI
5
5
2780
2022
2037
2052
14-Jun-2023
25-Dec-2022
01-Apr-2023
30-Nov-2024
Approved
ok
Approved
OK
View
195
Kannauj
GVPR
20050543
BARIA MAU GRAM PANCHAYAT WATER SUPPLY SCHEME
1
4
2434
2023
2038
2053
15-Jun-2024
16-Apr-2024
19-Jul-2024
20-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
196
Shahjahanpur
NCC Ltd.
20013439
Barilalpur water supply scheme
3
4
2970
2022
2037
2052
30-Sep-2023
31-Dec-2024
26-Oct-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Barilalpur scheme have been checked and verified. The submitted records are recommended and forwarded for further
Approved
All information on the portal for the completion certificate of Barilalpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
197
Auraiya
GVPR
20089651
Barkasi PWS
1
1
2526
2023
2038
2053
06-Jan-2022
05-Mar-2024
26-Nov-2023
11-Jan-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
198
Bijnor
Vindhya-GAJA (JV)
20053412
Barkatpur Water supply scheme
1
1
3903
2023
2038
2053
06-Jul-2023
02-Apr-2024
05-Oct-2024
06-Oct-2024
Approved
Every thing complete.
Approved
Everything Complete
View
199
Bijnor
LC INFRA
20019385
Barkhrabad Urf Khatai Water Supply
1
1
2059
2022
2037
2052
09-Feb-2024
06-Apr-2024
14-Oct-2024
15-Oct-2024
Approved
Every thing completed.
Approved
complete
View
200
Fatehpur
Power Mech Projects Ltd
20097505
BAROUN
1
1
2860
2023
2038
2053
25-Sep-0024
30-Jun-0025
23-Feb-2024
24-Apr-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of January (23.01.2024)
Approved
Verified
View
201
Kanpur Dehat
GVPR
20025211
BARRA THARRA
2
4
3941
2023
2038
2053
26-Sep-2023
01-Nov-2023
17-Mar-2024
18-Mar-2024
Approved
Forward for necessary action pls.
Approved
All work of scheme found satisfactory
View
202
Ayodhya
UNIVERSAL MEP
20031498
BARTARA & MOHAMMADPUR DAUDPUR GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME
3
6
4000
2023
2038
2053
12-Oct-2023
19-Oct-2023
19-Oct-2023
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
203
Kannauj
GVPR
20067597
BARUASABAL PUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
6
5427
2023
2038
2053
16-Aug-2024
16-Apr-2024
19-Jul-2024
20-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
204
Jhansi
Unipro
8135681
Barwar GOV
58
37
88387
2023
2038
2053
04-Nov-2022
31-Jul-2024
29-Dec-2024
30-Dec-2024
Approved
checked
Approved
checked
View
205
Ambedkar Nagar
Vindhya-GAJA (JV)
20041590
BASAHIYA
3
16
3780
2023
2038
2053
23-Nov-2023
24-Dec-2024
28-Mar-2025
29-Mar-2025
Approved
Checked and found ok
Approved
CHECKED AND FOUND OK
View
206
Amethi
Vindhya-GAJA (JV)
20085694
BASAIKPUR WATER SUPPLY SCHEME
1
6
2135
2023
2038
2053
29-Apr-2024
05-Nov-2024
05-Feb-2025
06-May-2025
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance
View
207
Bijnor
LC INFRA
8361017
BASANTPUR VILLAGE WATER SCHEME
1
1
4356
2022
2037
2052
30-Sep-2023
27-Feb-2024
26-Aug-2024
27-Aug-2024
Approved
Every thing completed.
Approved
Everything Complete.
View
208
Ambedkar Nagar
Vindhya-GAJA (JV)
20035108
BASIA WSS
2
6
3680
2023
2038
2053
21-Nov-2023
14-Aug-2024
02-Dec-2024
03-Dec-2024
Approved
checked and found ok
Approved
SCHEME COMPLETED
View
209
Ambedkar Nagar
Vindhya-GAJA (JV)
20081358
BASOHARI WSS
3
7
2824
2023
2038
2053
09-Mar-2024
19-Nov-2024
20-Mar-2025
21-Mar-2025
Approved
checked and found ok
Approved
Scheme completed
View
210
Meerut
Power Mech Projects Ltd
20010927
BASTORA NORANG
2
2
3022
2022
2037
2052
31-Dec-2024
25-Sep-2024
14-Feb-2025
15-Feb-2025
Approved
Recommended for further Approvals.
Pending
View
211
Meerut
Power Mech Projects Ltd
20074091
BATJEORA
1
1
2743
2022
2037
2052
31-Dec-2024
05-Jun-2024
22-Oct-2024
23-Oct-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
212
Shahjahanpur
NCC Ltd.
20084141
BAURI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
7
5910
2022
2037
2052
31-Aug-2024
31-Dec-2024
30-Nov-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Bauri scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Bauri scheme has been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
213
Kannauj
GVPR
20036243
BAUTHAM GRAMIN PEYJAL YOJNA
1
5
3988
2023
2038
2053
13-May-2024
10-Apr-2024
13-Jul-2024
14-Jul-2024
Approved
FORWARDED FOR FURTHER ACTION.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
214
Etawah
Indian Hume Pipe
20015033
Beedhupura
4
6
2350
2022
2037
2052
08-May-2023
11-Aug-2023
31-Mar-2024
01-Apr-2024
Approved
All work has been completed as per approved departmental design and drawing. No any leakage or pressure drop found during the final inspection. Water supply is continue from last 1 year.
Approved
All work of scheme found satisfactory
View
215
Farrukhabad
Vindhya-GAJA (JV)
20074527
BEEGHAMAU MVS
3
5
4265
2023
2038
2053
30-May-2025
25-May-2024
25-May-2024
26-May-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
216
Farrukhabad
Vindhya-GAJA (JV)
20092383
BEG & HUSAINPUR BANGER MVS
5
5
3446
2023
2038
2053
31-Mar-2025
08-Oct-2024
01-Feb-2025
02-Feb-2025
Approved
All the parameters of scheme verified can take in O&M
Approved
ok
View
217
Bijnor
LC INFRA
8360405
BEGAMPUR SHADI GRAMPANCHAYAT WATER SUPPLY SCHEME
1
1
5526
2022
2037
2052
29-Sep-2024
10-Dec-2023
08-Jun-2024
09-Jun-2024
Approved
Every thing complete.
Approved
All document checked.
View
218
Kannauj
GVPR
20067688
BEHARAPUR GAISAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
2
8
3024
2023
2038
2053
16-Aug-2024
09-Jun-2024
10-Jun-2024
11-Jun-2024
Approved
Forwarded for further action.
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
219
Meerut
Power Mech Projects Ltd
20037256
BEHJADKA
2
2
4172
2022
2037
2052
31-Dec-2024
20-Sep-2024
04-Feb-2025
21-Apr-2025
Approved
Recommended for further Approval
Approved
approved
View
220
Kannauj
GVPR
20077084
BEHTA GRAM PANCHAYAT WATER SUPPLY SCHEME
2
2
2912
2023
2038
2053
08-Sep-2024
22-Apr-2024
26-Jul-2024
27-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
221
Amethi
Vindhya-GAJA (JV)
20085686
BEHTA MURTAJAPUR WATER SUPPLY SCHEME
3
5
2777
2023
2038
2053
29-Apr-2024
25-May-2024
26-Sep-2024
05-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents.
Approved
Hardcopy submitted and found okay as per the submitted documents..
View
222
Auraiya
GVPR
20093723
Belpur bela PWS
2
1
1853
2023
2038
2053
06-Jan-2022
10-Aug-2024
09-Aug-2024
10-Aug-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
223
Bijnor
LC INFRA
20026238
Berkhera-Niyamtabad_Rananangla Village Water Supply
3
3
1838
2022
2037
2052
09-Feb-2022
05-Jun-2024
05-Jun-2024
06-Jun-2024
Approved
Every thing completed
Approved
EVERY THING COMPLETED
View
224
Ayodhya
UNIVERSAL MEP
20058331
Betauli WSS
2
2
2240
2023
2038
2053
12-Oct-2023
20-Jun-2024
20-May-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
225
Ambedkar Nagar
Vindhya-GAJA (JV)
20098231
BHABHAURA Water Supply Scheme
4
10
4390
2023
2038
2053
09-Mar-2023
21-Apr-2024
15-May-2025
16-May-2025
Approved
CHECKED AND FOUND OK
Approved
Scheme completed
View
226
Fatehpur
Power Mech Projects Ltd
20097721
BHADAUHA ,CHANDPUR
1
3
4010
2023
2033
2053
14-May-2024
30-Jun-2025
04-Dec-2024
05-Dec-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of September (05.09.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
227
Ghaziabad
LC INFRA
8389818
BHADAULA VILLAGE WATER SUPPLY SCHEME
1
1
2193
2022
2037
2052
27-Mar-2022
31-Oct-2024
28-Feb-2025
01-Mar-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
all work has been completed
View
228
Ghaziabad
LC INFRA
20024681
BHADAULI PWS SCHEME
1
1
2522
2022
2037
2052
27-Mar-2022
31-Oct-2024
28-Feb-2025
01-Mar-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
all work has been completed
View
229
Meerut
Power Mech Projects Ltd
20020211
BHADAURA
1
1
3723
2022
2037
2052
31-Dec-2024
10-Jul-2024
26-Nov-2024
28-Nov-2024
Approved
Recommended for further Approvals.
Approved
approved
View
230
Auraiya
GVPR
20099294
Bhadaura PWS
2
5
300
2023
2038
2053
01-Jun-2022
19-Jun-2025
18-Mar-2025
18-Jun-2025
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
231
Auraiya
Indian Hume Pipe
20014518
bhadaurpur sahar pws
2
4
2200
2022
2037
2052
08-May-2023
21-Aug-2023
04-Feb-2024
05-Feb-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
232
Kanpur Dehat
GVPR
20025218
BHADHAWAL
2
1
3159
2023
2038
2053
26-Sep-2023
21-Nov-2023
19-Mar-2024
20-Mar-2024
Approved
Forward for further necessary action
Approved
All work of scheme found satisfactory
View
233
Kannauj
GVPR
20067605
BHADOUSI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
3145
2023
2038
2053
16-Aug-2024
22-Apr-2024
26-Jul-2024
27-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
234
Auraiya
GVPR
20065627
Bhadsiya & bamrauliya
1
6
3254
2023
2038
2053
06-Jan-2022
12-Sep-2024
11-Sep-2024
13-Sep-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
235
Ambedkar Nagar
Vindhya-GAJA (JV)
20047607
BHADYA Water Supply Scheme
5
5
3220
2023
2038
2053
25-Nov-2023
31-Dec-2024
16-May-2025
17-May-2025
Approved
Checked and Found Ok
Approved
Scheme completed
View
236
Ambedkar Nagar
Vindhya-GAJA (JV)
20047223
BHAGAUTI PUR Water Supply Scheme
2
10
3306
2023
2038
2053
23-Nov-2023
09-Jan-2025
09-Jan-2025
10-Jan-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme completed
View
237
Auraiya
Indian Hume Pipe
8361896
BHAGAUTIPUR
1
1
1960
2022
2037
2052
08-May-2023
25-Apr-2023
29-Sep-2023
30-Sep-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
238
Meerut
Power Mech Projects Ltd
20067135
BHAGWANPUR
1
1
2736
2023
2038
2053
31-Dec-2024
03-Jun-2024
23-Oct-2024
24-Oct-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
239
Kannauj
GVPR
20050192
BHAGWANTPUR & PRANPUR PULYRA GRAM PANCHAYAT WATER SUPPLY SCHEME
2
7
4643
2023
2038
2053
15-Jun-2024
16-Mar-2024
19-Jun-2024
20-Jun-2024
Approved
Forwarded for further action.
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
240
Kanpur Dehat
Indian Hume Pipe
20048682
Bhairon Shahjahanpur
3
3
3030
2022
2037
2052
24-Nov-2022
31-Dec-2024
31-Mar-2024
01-Apr-2024
Approved
Forward for necessary action pls.
Approved
All work of scheme found satisfactory
View
241
Ayodhya
UNIVERSAL MEP
20030057
BHAISAULI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
10
5470
2023
2038
2053
12-Oct-2023
25-Nov-2024
25-Nov-2024
01-Feb-2025
Approved
FOUND OK
Pending
View
242
Kanpur Dehat
Indian Hume Pipe
20034282
BHAISAYNA
1
6
5000
2022
2037
2052
23-Nov-2023
31-Dec-2024
30-Jun-2023
01-Jul-2023
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
243
Meerut
Power Mech Projects Ltd
20011233
BHALSONA
1
1
2714
2022
2037
2052
31-Dec-2024
12-Dec-2022
02-May-2023
07-Oct-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
244
Kannauj
GVPR
20036145
BHANWAR GARH GRAMIN PEYJAL YOJNA
2
4
2657
2023
2038
2053
13-May-2024
21-Jan-2025
23-Apr-2025
24-Apr-2025
Approved
forwarded for further action
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
245
Kanpur Dehat
GVPR
20053362
Bhanwarpur
1
3
2963
2023
2038
2053
18-Nov-2023
30-Nov-2023
27-Mar-2024
28-Mar-2024
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
246
Etawah
Indian Hume Pipe
20026313
Bharaipur PWS
1
4
2715
2022
2037
2052
22-Sep-2023
20-Feb-2024
21-May-2024
22-May-2024
Approved
Forwarded for further action.
Approved
All works are satisfactory.
View
247
Kanpur Dehat
GVPR
20065072
BHARAMAU
3
6
2699
2023
2038
2053
18-Jan-2024
01-Jan-2024
10-Apr-2024
11-Apr-2024
Approved
TKC unable to submit the calibration certificate and other report for O&M, Our letter No.SWSM/BLG/TPI/KD/O&M/2025-26/6655 dt.29/07/2028. we can go to O&M through conditional, TKC submit the require document within 15 day's.
Approved
All work of scheme found satisfactory
View
248
Kanpur Dehat
Indian Hume Pipe
20034285
BHARATPUR PIYASI
1
6
2990
2022
2037
2052
24-Nov-2022
31-Dec-2024
30-Jun-2023
01-Jul-2023
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
249
Bijnor
LC INFRA
20019390
Bhareka Water Supply
3
3
2481
2022
2037
2052
10-Feb-2024
11-Dec-2023
10-Jun-2024
11-Jun-2024
Approved
Every thing complete.
Approved
All Documents checked and verified
View
250
Shahjahanpur
NCC Ltd.
8362049
BHARTAPUR GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME
2
2
2269
2022
2037
2052
24-Dec-2023
31-Dec-2024
24-Mar-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Bhartapur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Bhartapur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
251
Siddharth Nagar
Megha
20023350
BHASAULA GP WSS
2
1
1415
2022
2037
2052
12-Mar-2025
08-Oct-2025
08-Oct-2025
08-Dec-2025
Approved
All documents verified and found as per guideline of SWSM. Sending for further process
Pending
View
252
Ambedkar Nagar
Vindhya-GAJA (JV)
20019933
Bhasra
1
2
2490
2023
2038
2053
03-Aug-2023
25-Sep-2024
27-Dec-2024
28-Dec-2024
Approved
Checked and found ok
Approved
Scheme completed
View
253
Amethi
Vindhya-GAJA (JV)
20085677
BHATGAWAN WATER SUPPLY SCHEME
2
9
5311
2023
2038
2053
29-Apr-2024
17-Dec-2024
17-Mar-2025
18-Jun-2025
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
254
Sultanpur
UNIVERSAL MEP
20091256
BHATI & SANICHARA GRAM PANCHAYAT WATER SUPPLY SCHEME
2
13
5880
2023
2038
2053
22-Mar-2024
31-Dec-2024
31-Jan-2025
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
255
Mau
LC INFRA
20045020
BHATIKALA WATER SUPPLY SCHEME
2
12
2889
2022
2037
2052
14-Mar-2023
14-Jan-2025
14-Jan-2025
15-Jan-2025
Approved
Approved.
Approved
Approved.
View
256
Shahjahanpur
NCC Ltd.
8388655
BHATIURA
3
3
2830
2022
2037
2052
30-Aug-2023
31-Dec-2024
30-Nov-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Bhatiura scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Bhatiura scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
257
Sultanpur
UNIVERSAL MEP
20066542
BHATTHI JARAULI & PAIGAPUR GROUP OF GRAM PANCHAYAT WATER SUPPLY SCHEME
3
3
5430
2023
2038
2053
12-Jan-2024
31-Dec-2024
16-Jan-2025
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
258
Kanpur Dehat
GVPR
20053104
Bhaura
1
2
3000
2023
2038
2053
18-Nov-2023
04-Nov-2023
19-Mar-2024
20-Mar-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
259
Kannauj
GVPR
20036642
BHAURAJPUR & JAGDISHPUR GRAMIN PEYJAL YOJNA
3
10
5101
2023
2038
2053
13-May-2024
25-Mar-2024
27-Jun-2024
28-Jun-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
260
Amethi
Gayatri Projects LTD
20100938
BHAVALPUR & AMBARPUR WATER SUPPLY SCHEME
3
16
4698
2022
2037
2053
25-Jun-2025
02-Sep-2024
05-Dec-2024
15-Mar-2025
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance...
View
261
Sultanpur
UNIVERSAL MEP
20066798
BHAVANIGARH & HASAI MUKUNDPUR GRAM PANCHYAT WATER SUPPLY SCHEME
2
12
2965
2023
2038
2053
12-Jan-2024
14-Jan-2024
21-Nov-2024
01-Dec-2024
Approved
All uploaded documents checked and found as per requirements. This is sending for further process.
Approved
All uploaded documents have been checked and verified as per requirements
View
262
Shahjahanpur
NCC Ltd.
20084093
BHAWALKHERA GRAM PANCHAYAT VILLAGE WATER SUPPLY SCHEME
1
1
2260
2022
2037
2052
31-Dec-2024
20-Aug-2024
19-Nov-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Bhawalkhera scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Bhawalkhera scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
263
Sultanpur
UNIVERSAL MEP
20066947
BHEEKHARPUR & ETWA MALNA GRAM PANCHAYAT WATER SUPPLY SCHEME
4
12
2990
2023
2038
2053
12-Jan-2024
31-Dec-2024
04-Jul-2024
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
264
Kanpur Dehat
GVPR
20099403
Bhikhdev
1
4
3973
2023
2038
2053
15-Apr-2024
25-Nov-2023
09-Apr-2024
10-Apr-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
265
Ambedkar Nagar
Vindhya-GAJA (JV)
20019774
Bhikhpur Khurd
3
13
6270
2023
2038
2053
03-Aug-2023
14-Aug-2024
02-Dec-2024
03-Dec-2024
Approved
checked and verified and found OK
Approved
Scheme completed
View
266
Ayodhya
UNIVERSAL MEP
20058531
Bhitaura WSS
1
2
2520
2023
2038
2053
12-Oct-2023
20-May-2024
20-May-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
267
Hardoi
NCC Ltd.
20000031
BHITI NEWADA
1
3
2040
2022
2037
2052
29-Apr-2023
25-Mar-2023
24-Jun-2023
24-Dec-2024
Approved
ok
Approved
OK
View
268
Kannauj
GVPR
20050528
BHOJPUR NIGOH GRAM PANCHAYAT WATER SUPPLY SCHEME
1
4
2219
2023
2038
2053
15-Jun-2024
28-Mar-2024
30-Jun-2024
01-Jul-2024
Approved
FORWARDED FOR FURTHER ACTION
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
269
Bareilly
NCC Ltd.
20015418
BHOJPUR water supply scheme
1
1
2130
2022
2037
2052
20-Jul-2023
08-Apr-2024
08-Jul-2023
25-Oct-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Bhojpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Pending
View
270
Meerut
Power Mech Projects Ltd
20010918
BHOLA
1
1
6162
2022
2037
2052
31-Dec-2024
18-Jun-2024
05-Nov-2024
06-Nov-2024
Approved
Recommended for further Approval
Approved
Approved
View
271
Auraiya
GVPR
20084715
Bhontapur & kunwardeopur & dhanaupur PWS
4
8
3965
2023
2038
2053
06-Jan-2022
31-Dec-2024
13-May-2024
15-May-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
272
Auraiya
GVPR
20099283
Bhorajpur pws
1
1
488
2023
2038
2053
06-Jan-2022
29-Sep-2024
28-Sep-2024
30-Sep-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
273
Hardoi
NCC Ltd.
20011908
BHORAPUR
4
5
2450
2022
2037
2052
14-Jun-2023
20-May-2023
24-Aug-2023
13-Dec-2024
Approved
ok
Approved
OK
View
274
Ambedkar Nagar
Vindhya-GAJA (JV)
20026078
BHUJAGI WATER SUPPLY SCHEME
1
5
4290
2023
2038
2053
28-Sep-2023
25-Jul-2025
14-Oct-2025
15-Oct-2025
Approved
Checked and found ok
Approved
Scheme Completed
View
275
Mau
GA INFRA-VPL
20101186
BHULAIDEEH GRAM PANCHAYAT WATER SUPPLY SCHEME
3
5
1680
2023
2038
2053
18-Oct-2024
18-Oct-2024
19-Jan-2025
20-Jan-2025
Approved
Approved.
Approved
Approved
View
276
Farrukhabad
Vindhya-GAJA (JV)
20092455
BHULANPUR CHIRPURA MVS
2
5
1996
2023
2038
2053
31-Mar-2025
26-Dec-2024
09-Apr-2025
10-Apr-2025
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
277
Sambhal
SPML Infra
20070418
Bhura Begampur W/S Scheme
1
1
1630
2022
2037
2052
03-Aug-2024
14-Jun-2024
14-Sep-2024
15-Sep-2024
Approved
Trial Run Successfully Completed on 14-12-24
Approved
Approved
View
278
Kanpur Dehat
Indian Hume Pipe
20096865
Bibapur
2
3
1845
2022
2037
2052
04-Mar-2023
31-Dec-2024
05-Dec-2023
06-Dec-2023
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
279
Sultanpur
UNIVERSAL MEP
20077646
BIBIGANJ & KHAICHILAKALA GRAM PANCHAYAT WATER SUPPLY SCHEME
4
8
5560
2023
2038
2053
12-Jan-2024
12-Jan-2024
30-Mar-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
280
Auraiya
GVPR
20084716
Bibipur PWS
4
4
3159
2023
2038
2053
31-Dec-2024
25-Jan-2024
24-Jan-2024
25-Jan-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
281
Farrukhabad
GVPR
20018313
BIBIPUR W/S Scheme
1
2
1805
2022
2037
2052
08-Mar-2023
27-Jun-2024
27-Jun-2024
28-Jul-2025
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
282
Azamgarh
LC INFRA
20101579
BIBIPUR WATER SUPPLY SCHEME
3
7
2946
2023
2038
2053
10-Aug-2023
05-Jan-2024
09-Apr-2024
10-Apr-2024
Approved
OK
Approved
OK
View
283
Muzaffarnagar
JMC - Lakshmi (JV)
20018283
BIBIPUR WSS
1
1
1920
2022
2037
2052
15-Aug-2023
03-May-2025
05-Sep-2025
06-Sep-2025
Approved
The details given by the contractor are correct at the time of approval.
Pending
View
284
Ayodhya
UNIVERSAL MEP
20031490
BIHARA GRAM PANCHAYAT WATER SUPPLY SCHEME
1
6
4020
2023
2038
2053
12-Oct-2023
30-Nov-2023
30-Nov-2023
01-Feb-2025
Approved
FOUND OK
Pending
View
285
Shahjahanpur
NCC Ltd.
20018011
Biharipur
2
2
1908
2022
2037
2052
31-Jul-2023
31-Dec-2024
30-Oct-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Biharipur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Biharipur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
286
Auraiya
GVPR
20091073
Bijhalpur PWS
1
2
1775
2023
2038
2053
01-Jun-2022
29-May-2024
25-May-2024
30-May-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
287
Meerut
Power Mech Projects Ltd
8362351
BIJOLI
1
1
6873
2022
2037
2052
31-Dec-2024
16-Sep-2024
02-Feb-2025
03-Feb-2025
Approved
Recommended for further Approvals.
Approved
APPROVED
View
288
Amethi
Vindhya-GAJA (JV)
20070881
BIKHANPUR WATER SUPPLY SCHEME
1
6
2031
2023
2038
2053
23-Mar-2024
19-Jun-2024
19-Sep-2024
20-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
289
Kanpur Dehat
Indian Hume Pipe
20034287
BILSARAYAN
1
2
2630
2022
2037
2052
24-Nov-2022
23-Nov-2023
31-Jan-2024
01-Feb-2024
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
290
Kanpur Dehat
Indian Hume Pipe
20025553
Bilti
1
2
2250
2022
2037
2052
25-Aug-2022
24-Aug-2023
30-Apr-2023
01-May-2023
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
291
Sultanpur
UNIVERSAL MEP
20066283
BINGI GRAM PANCHAYAT WATER SUPPLY SCHEME
2
11
2810
2023
2038
2053
12-Jan-2024
31-Dec-2024
30-Jan-2025
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
292
Kannauj
GVPR
20066409
BINORARAMPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
9
4615
2023
2038
2053
06-Aug-2024
07-Apr-2024
11-Jul-2024
12-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
293
Shahjahanpur
NCC Ltd.
20015536
Birahampur Jhajharia Banda
1
1
2640
2022
2037
2052
31-Aug-2023
31-Dec-2024
30-Nov-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Birhampur Jhajharia scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Birahampur Jhajharia scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
294
Bahraich
PNC-SPML-JV
20099238
BIRAHIMDIHA TEJWAPUR RF PWS
1
8
2370
2022
2037
2052
31-Dec-2025
13-Oct-2025
13-Oct-2025
14-Oct-2025
Approved
Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/10/0144, kindly complete it.
Pending
View
295
Muzaffarnagar
Gayatri Projects LTD
20058590
BIRALASI WATER SUPPLY SCHEME
1
2
6793
2022
2037
2052
16-Sep-2022
07-Oct-2024
08-Oct-2024
09-Oct-2024
Approved
The details given by the contractor are correct at the time of approval.
Pending
View
296
Ayodhya
VSA
20096861
BIRAULI & ITUNJA WSS
2
2
3650
2023
2038
2053
22-May-2024
08-Oct-2024
08-Oct-2024
17-Jun-2025
Approved
FOUND OK
Pending
View
297
Ayodhya
UNIVERSAL MEP
20030511
BIRHARA GRAM PANCHAYAT WATER SUPPLY SCHEME
2
6
2670
2023
2038
2053
12-Oct-2023
01-Dec-2023
01-Dec-2023
30-Nov-2024
Approved
FOUND OK
Pending
View
298
Kannauj
GVPR
20067626
BIRPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
5
3049
2023
2038
2053
16-Aug-2024
03-May-2024
07-Aug-2024
08-Aug-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
299
Azamgarh
LC INFRA
20024753
Bisauli Rural Water Supply Scheme
1
7
3480
2022
2037
2052
10-Aug-2023
17-Jan-2024
17-Apr-2024
18-Apr-2024
Approved
ok
Approved
OK
View
300
Kanpur Dehat
GVPR
20065092
Bisoha
1
4
3398
2023
2038
2053
18-Jan-2024
08-Aug-2023
12-Nov-2023
13-Nov-2023
Approved
TKC unable to submit the calibration certificate and other report for O&M and some work pending (Road restoration, MDPE Pipe Open & Grouting. Ref. SWSM/BLG/TPI/KD/O&M/2025-26/6657 DT.30.07.2025. we can go to O&M through conditional, TKC submit the require document within 15 day's and complete the Balance work.
Approved
All work of scheme found satisfactory
View
301
Ambedkar Nagar
Vindhya-GAJA (JV)
20067161
BISUNPUR BAJDAHA Water Supply Scheme
5
9
4220
2023
2038
2053
21-Feb-2023
21-Feb-2024
28-Apr-2025
29-Apr-2025
Approved
CHECK AND FOUND OK
Approved
Scheme completed
View
302
Azamgarh
LC INFRA
20058024
Bithalpur WATER SUPPLY SCHEME
4
7
3371
2023
2038
2053
09-May-2024
21-Jul-2024
20-Oct-2024
21-Oct-2024
Approved
OK
Approved
OK
View
303
Sultanpur
UNIVERSAL MEP
20066826
BRAHIMPUR & SARIYA MAFI GRAM PANCHAYAT WATER SUPPLY SCHEME
2
6
4153
2023
2038
2053
12-Jan-2024
12-Jan-2024
04-Mar-2025
05-Mar-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
304
Meerut
Power Mech Projects Ltd
20077321
BUBAKPUR
1
1
1629
2022
2037
2052
31-Dec-2024
25-Jun-2024
11-Nov-2024
12-Nov-2024
Approved
CHECKED AND VERIFIED....
Approved
approved
View
305
Bijnor
LC INFRA
8360406
BUDGARI GRAMPANCHAYAT WATER SUPPLY SCHEME
1
1
3112
2022
2037
2052
02-Nov-2023
10-Dec-2023
08-Jun-2024
09-Jun-2024
Approved
Every thing completed.
Approved
Everything Complete
View
306
Ambedkar Nagar
Vindhya-GAJA (JV)
20067349
BUDHANPUR Water Supply Scheme
1
2
2140
2023
2038
2052
08-Mar-2024
12-Jan-2025
12-Jan-2025
13-Jan-2025
Approved
Checked and Verified
Approved
Scheme completed
View
307
Bijnor
LC INFRA
20026176
Budhpur Nainsingh Village Water Supply
3
3
2899
2022
2037
2052
18-Aug-2024
18-Apr-2024
24-Jul-2024
25-Jul-2024
Approved
every thing completed.
Approved
Everything Completed
View
308
Kannauj
GVPR
20098274
BUNDHA NAGARIYA GRAM PANCHAYAT WATER SUPPLY SCHEME
5
6
2282
2023
2038
2053
14-Nov-2024
02-Aug-2024
26-Jul-2024
27-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
309
Jhansi
NCC Ltd.
8010048
Burhpura GOV
59
21965
171000
2023
2038
2053
30-Jun-2022
30-Aug-2023
21-Apr-2025
22-Apr-2025
Approved
checked and forwarded
Approved
approved
View
310
Shahjahanpur
NCC Ltd.
20014889
CHAHARPUR Madnapur W/s
2
3
2460
2022
2037
2052
30-Sep-2024
31-Dec-2024
30-Dec-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Chaharpur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Chaharpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
311
Ayodhya
VSA
20091374
CHAITAWA WSS
1
9
3350
2023
2038
2053
20-Mar-2024
28-Oct-2024
28-Oct-2024
16-Jan-2025
Approved
FOUND OK
Pending
View
312
Fatehpur
Power Mech Projects Ltd
20097779
CHAK SHAHPIRPUR
2
3
2450
2023
2038
2053
14-May-2024
30-Jun-2025
12-Jul-2024
12-Aug-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of September (08.09.2024)
Approved
Verified
View
313
Gautam Buddha Nagar
LC INFRA
8389564
Chaksenpur Urf Dhanibas Water Supply Scheme
1
1
2339
2022
2037
2052
20-Mar-2023
30-Apr-2023
31-Oct-2024
01-Nov-2024
Approved
Project certificate is verified
Approved
Verified
View
314
Azamgarh
LC INFRA
20014621
CHANDA BHARI WATER SUPPLY SCHEME
1
7
3697
2022
2037
2052
10-Aug-2023
25-Dec-2023
29-Mar-2024
30-Mar-2024
Approved
OK
Approved
OK
View
315
Amethi
Vindhya-GAJA (JV)
20085683
CHANDAIPUR WATER SUPPLY SCHEME
2
7
2835
2023
2038
2053
29-Apr-2024
18-Jun-2024
18-Sep-2024
19-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
316
Ambedkar Nagar
Vindhya-GAJA (JV)
20019794
Chandapur
1
12
4680
2023
2038
2053
03-Aug-2023
02-Sep-2024
19-Mar-2025
20-Mar-2025
Approved
Checked and Verified
Approved
Scheme completed
View
317
Bijnor
LC INFRA
20011741
Chandat TurakVillage Water Supply Scheme
5
5
4464
2021
2037
2052
10-Feb-2024
12-Dec-2024
10-Jun-2024
11-Jun-2024
Approved
Every thing complete.
Approved
Every thing is completed.
View
318
Jaunpur
AFCONS
20050630
CHANDAUKI WATER SUPPLY SCHEME
2
9
3250
2023
2038
2053
31-Dec-2024
04-May-2024
10-Mar-2025
11-Mar-2025
Approved
Ok
Approved
approved
View
319
Ayodhya
UNIVERSAL MEP
20058259
Chandaura WSS
2
7
3840
2023
2038
2053
22-Jan-2024
18-May-2024
18-May-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
320
Kannauj
GVPR
20066504
CHANDIAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
8
3965
2023
2038
2053
16-Aug-2024
31-Mar-2024
07-Mar-2024
07-Apr-2024
Approved
FORWARDED FOR FURTHER ACTION
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
321
Meerut
Power Mech Projects Ltd
20020216
CHANDLAWAR URF MAHALWALA
1
1
4999
2022
2037
2052
31-Dec-2024
20-Jan-2024
07-Jun-2024
03-Nov-2024
Approved
CHECKED AND VERIFIED....
Approved
approved
View
322
Ambedkar Nagar
Vindhya-GAJA (JV)
20056458
CHANDPUR BHATPURA Water Supply Scheme
1
6
2520
2023
2038
2053
27-Dec-2022
26-Dec-2023
25-Mar-2025
26-Mar-2025
Approved
checked and verified
Approved
Scheme completed
View
323
Etawah
Indian Hume Pipe
20026426
Chandpura PWS
2
3
3339
2022
2037
2052
22-Sep-2023
21-Sep-2024
23-Dec-2024
24-Dec-2024
Approved
Dear Sir, the above data has been verified and forwarded to you for further action.
Approved
All work of scheme found satisfactory
View
324
Ayodhya
UNIVERSAL MEP
20031487
CHANDRAMAU MANGA GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
3090
2023
2038
2053
12-Oct-2023
05-Oct-2023
05-Oct-2023
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
325
Auraiya
GVPR
20084723
Chapauli PWS
1
2
2112
2023
2038
2053
01-Jun-2024
12-Aug-2024
01-Mar-2025
02-Mar-2025
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
326
Hardoi
NCC Ltd.
20000040
CHATHIYA DHAFRAPUR
2
4
2030
2022
2037
2052
29-Apr-2023
01-Jun-2023
01-Sep-2023
17-Dec-2024
Approved
ok
Approved
OK
View
327
Bahraich
PNC-SPML-JV
8375767
CHATTARPUR MAHASI PWS
1
5
4422
2022
2037
2052
31-Dec-2025
18-Sep-2025
18-Sep-2025
19-Sep-2025
Approved
Scheme send to O&M, but rectify all issues identify by TPI with in 15 days.
Approved
Scheme completed.
View
328
Ambedkar Nagar
Vindhya-GAJA (JV)
20041701
CHATURI PATTI WSS
2
3
3930
2023
2038
2053
23-Nov-2023
14-Jul-2024
02-Dec-2024
03-Dec-2024
Approved
Checked and found OK
Approved
SCHEME COMPLETED
View
329
Farrukhabad
Vindhya-GAJA (JV)
20097825
CHAUKI MOHAMMAD PUR SVS
1
1
2608
2023
2038
2053
30-May-2025
03-Feb-2024
18-May-2024
19-May-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
330
Bijnor
Vindhya-GAJA (JV)
20067422
Chaukpuri water supply scheme
1
1
2842
2022
2037
2052
06-Jul-2023
28-Nov-2023
04-Jun-2024
05-Jun-2024
Approved
every thing completed
Approved
Everything Completed
View
331
Gautam Buddha Nagar
LC INFRA
20094784
CHAUNA VILLAGE WATER SUPPLY SCHEME
1
1
2860
2022
2036
2052
20-Mar-2024
30-Jan-2024
30-Mar-2024
01-Apr-2024
Approved
Project certificate is verified.
Approved
Verified
View
332
Bahraich
PNC-SPML-JV
6993692
Chetra SVS solar
1
7
3390
2022
2037
2052
30-Jun-2025
01-May-2024
01-May-2024
02-May-2024
Approved
OK
Approved
Scheme send to O&M, but rectify all issues identify by TPI with in 15 days.
View
333
Meerut
Power Mech Projects Ltd
20012907
CHHATRI
1
1
2046
2022
2037
2052
31-Dec-2024
04-Mar-2024
20-Mar-2024
08-Oct-2024
Approved
Recommended for further Approvals.
Approved
approved
View
334
Gautam Buddha Nagar
LC INFRA
8389553
CHHAYANSA GRAM PANCHAYAT WATER SUPPLY SCHEME
2
2
3593
2022
2037
2052
20-Mar-2024
30-Jan-2024
30-Mar-2024
01-Apr-2024
Approved
Project certificate is verified.
Approved
Verified
View
335
Shahjahanpur
NCC Ltd.
8362287
CHHIDKURI GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME
1
6
2790
2022
2037
2052
19-Sep-2023
31-Dec-2024
30-Dec-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Chidkuri scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Chhidkuri scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
336
Fatehpur
Power Mech Projects Ltd
20100812
Chhitampur
1
3
3190
2023
2038
2053
20-Sep-2024
06-Oct-2024
06-Oct-2024
07-Oct-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of July (7.07.2024) and Regular water supply is given to the consumers.
Approved
Verify
View
337
Ambedkar Nagar
Vindhya-GAJA (JV)
20083841
CHHITUNI WSS
1
8
2190
2023
2038
2053
26-Dec-2023
20-May-2025
19-May-2025
20-May-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme Completed
View
338
Shahjahanpur
NCC Ltd.
20015653
chikatiya
2
2
2270
2022
2037
2052
30-Sep-2023
31-Dec-2023
30-Dec-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Chikatiya scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Chikatiya scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
339
Auraiya
GVPR
20094349
CHIKTA PWS
1
2
1975
2023
2038
2053
06-Jan-2022
31-Dec-2024
19-Feb-2024
07-Apr-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
340
Meerut
Power Mech Projects Ltd
8362365
CHINDAURI TAPPA LAWAR
1
1
4271
2022
2037
2052
31-Dec-2024
16-Sep-2024
02-Feb-2025
03-Feb-2025
Approved
Recommended for further Approvals.
Approved
APPROVED
View
341
Meerut
Power Mech Projects Ltd
20098174
CHINDORI KHAS-CHINDORI PATTI DALU
2
2
5287
2023
2038
2053
31-Dec-2024
26-Nov-2024
27-Aug-2024
28-Nov-2024
Approved
CHECKED AND VERIFIED....
Approved
approved
View
342
Mau
GA INFRA-VPL
20096162
CHISTIPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
4
1147
2023
2038
2053
20-Jan-2025
20-Jan-2025
19-Jan-2025
20-Jan-2025
Approved
APPROVED
Approved
APPROVED
View
343
Ambedkar Nagar
Welspun Kaveri Infraprojects JV
20035487
Chormara Kamalpur
6
12
4442
2022
2037
2052
17-Feb-2024
22-Apr-2024
09-Feb-2025
26-Feb-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme Completed
View
344
Gautam Buddha Nagar
LC INFRA
8361671
CHUHARPUR BANGAR VILLAGE WATER SUPPLY SCHEME
1
1
3690
2022
2037
2052
20-Mar-2023
31-Mar-2024
31-Oct-2024
01-Nov-2024
Approved
Project certificate is verified
Approved
Verified
View
345
Meerut
Power Mech Projects Ltd
20100948
DABATHUWA GARHI
1
1
1091
2023
2038
2053
31-Dec-2024
14-Sep-2024
31-Jan-2025
01-Feb-2025
Approved
Recommended for further Approvals.
Approved
approved
View
346
Meerut
Power Mech Projects Ltd
20058231
DADRI
1
1
5636
2022
2037
2052
31-Dec-2024
07-Aug-2024
24-Dec-2024
25-Dec-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
347
Ayodhya
UNIVERSAL MEP
20058061
DAFIYAPUR WSS
1
2
1700
2023
2038
2053
19-Mar-2024
05-Oct-2024
05-Oct-2024
01-Feb-2025
Approved
FOUND OK
Pending
View
348
Meerut
Power Mech Projects Ltd
20098083
DAHAR
1
1
4648
2023
2038
2053
31-Jan-2025
14-Aug-2024
31-Dec-2024
01-Jan-2025
Approved
Recommended for further Approvals
Approved
Approved
View
349
Hardoi
NCC Ltd.
20012365
DAHEE
1
4
3470
2022
2037
2052
26-Jul-2023
20-Aug-2023
22-Nov-2023
07-Dec-2024
Approved
ok
Approved
OK
View
350
Kanpur Dehat
GVPR
20053196
DAHELI
2
0
2597
2023
2038
2053
18-Nov-2023
10-Dec-2023
20-Mar-2024
21-Mar-2024
Approved
TKC unable to submit the calibration certificate and other report for O&M and some work pending (Road restoration & Grouting. Ref. SWSM/BLG/TPI/KD/O&M/2025-26/6657 DT.30.07.2025. we can go to O&M through conditional, TKC submit the require document within 15 day's and complete the Balance work.
Approved
All work of scheme found satisfactory
View
351
Kannauj
GVPR
20036649
DAHLEPUR BANGER & MAHAM BALIPUR GRAMIN PEYJAL YOJNA
2
3
2415
2023
2038
2053
13-May-2024
10-Apr-2024
13-Jul-2024
14-Jul-2024
Approved
forw.arded for further action
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
352
Auraiya
GVPR
20099290
Dahnanang PWS
1
3
3105
2023
2038
2053
21-Jun-2024
03-Nov-2024
02-Nov-2024
04-Nov-2024
Approved
Forwarded for further action.
Pending
View
353
Etawah
Indian Hume Pipe
20024531
Daipur PWS
1
2
1450
2022
2037
2052
22-Sep-2023
11-Oct-2023
11-Jan-2024
12-Jan-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory
View
354
Kanpur Dehat
GVPR
20077276
Dalikpur Maharajpur & Bhitargaon
2
4
2496
2023
2038
2053
17-Feb-2024
13-Nov-2023
28-Mar-2024
29-Mar-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
355
Auraiya
GVPR
20099288
Damarpur PWS
1
1
3024
2023
2038
2053
06-Jan-2022
08-Sep-2023
18-Jul-2024
20-Jul-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
356
Ambedkar Nagar
Vindhya-GAJA (JV)
20084934
DANDI MAHMOODPUR WSS
3
3
2450
2023
2038
2053
20-Feb-2024
27-Nov-2024
27-Feb-2025
28-Feb-2025
Approved
scheme checked and verified
Approved
DANDI MAHMOODPUR SCHEME COMPLETED
View
357
Rampur
SPML Infra
20072616
DANIYAPUR SHANKARPUR SV W/S SCHEME
1
1
1745
2022
2037
2052
03-Aug-2024
08-May-2024
08-Aug-2024
09-Aug-2024
Approved
All docs found in order
Pending
View
358
Amethi
Gayatri Projects LTD
20072845
Daranagar & Sewara GP water supply scheme
2
7
4800
2022
2037
2052
10-Aug-2024
14-Jun-2024
14-Sep-2024
15-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents.
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance...
View
359
Bijnor
LC INFRA
20011551
Darbar Water Supply Scheme
1
1
2661
2022
2037
2052
09-Feb-2022
12-Feb-2024
21-Aug-2024
22-Aug-2024
Approved
Every thing completed.
Approved
Everything Completed
View
360
Bijnor
LC INFRA
20013992
DARBARA WATER SUPPLY SCHEME
1
2
2927
2022
2037
2052
10-Feb-2024
27-Feb-2024
26-Aug-2024
27-Aug-2024
Approved
Every thing complete
Approved
All Documents checked and verified.
View
361
Mau
LC INFRA
20064258
Dariyabad Village Water Supply Scheme
1
3
1671
2022
2037
2052
27-Jul-2024
20-Apr-2025
02-Apr-2025
03-Apr-2025
Approved
Approved
Approved
Approved.
View
362
Kanpur Dehat
GVPR
20069899
dashahara sujanpur
1
4
4201
2023
2038
2053
17-Mar-2024
19-Dec-2023
03-May-2024
04-May-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
363
Auraiya
GVPR
20091074
Daspur PWS
1
2
2530
2023
2038
2053
01-Jun-2022
24-Feb-2024
07-Mar-2024
25-Apr-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
364
Ayodhya
UNIVERSAL MEP
20058382
DASRATH MAU WSS
2
2
2790
2023
2038
2053
21-Jun-2024
01-Jan-2024
22-Mar-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
365
Azamgarh
LC INFRA
20101583
DASU PATTI WATER SUPPLY SCHEME
4
7
3274
2023
2038
2053
31-May-2023
14-Oct-2023
31-Jan-2024
01-Feb-2024
Approved
OK
Approved
OK
View
366
Ambedkar Nagar
Vindhya-GAJA (JV)
20019823
Daudpur
1
7
4470
2023
2038
2053
03-Aug-2023
23-Dec-2024
04-Apr-2025
05-Apr-2025
Approved
Checked and found ok
Approved
CHECKED AND FOUND OK
View
367
Kanpur Dehat
Indian Hume Pipe
20016926
Daulatpur
1
1
3140
2022
2037
2052
05-Feb-2022
04-Feb-2023
30-Apr-2023
01-May-2023
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
368
Shahjahanpur
NCC Ltd.
20084102
DAULATPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
2210
2022
2037
2052
31-Dec-2024
29-Aug-2024
28-Nov-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Daulatpur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Daulatpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
369
Sultanpur
UNIVERSAL MEP
20097011
DAUNO AND JAGDISHPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
3
5
2600
2023
2038
2053
10-May-2024
31-Dec-2024
31-Jan-2025
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
370
Ambedkar Nagar
Vindhya-GAJA (JV)
20068240
DAYAMPUR WSS
2
2
3200
2023
2038
2053
19-Feb-2024
28-Jul-2024
19-Mar-2025
20-Mar-2025
Approved
Checked and found ok
Approved
Scheme completed
View
371
Kannauj
GVPR
20067638
DEBIPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
2
3
1078
2023
2038
2053
16-Aug-2024
07-Apr-2024
11-Jul-2024
12-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
372
Kannauj
GVPR
20077117
DEDAURA KHURD GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
2278
2023
2038
2053
08-Sep-2024
20-Nov-2024
19-Feb-2025
20-Feb-2025
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
373
Bahraich
PNC-SPML-JV
20099558
DEEHA ASHOKA CHITTAURA RF MVS PWS
5
10
8330
2022
2037
2052
30-Jun-2025
25-Feb-2025
14-Nov-2023
25-Feb-2025
Approved
OK !
Approved
SCHEME COMPLETED
View
374
Lakhimpur Kheri
NCC Ltd.
8360568
Demouhra
1
4
3845
2022
2037
2052
09-Apr-2023
20-Jan-2023
19-Apr-2023
19-Nov-2024
Approved
Approved as per check list
Approved
Found ok
View
375
Kanpur Dehat
GVPR
20053230
Devgaon Chakkar Urf Nibhoo
1
2
2527
2023
2038
2053
18-Nov-2023
30-Nov-2023
23-Mar-2024
24-Mar-2024
Approved
Forward for further action pls
Approved
All work of scheme found satisfactory
View
376
Kanpur Dehat
GVPR
20077335
Devipur & Jugrajpur Shiwali
4
4
3963
2023
2038
2053
17-Feb-2024
10-Jan-2024
15-Apr-2024
16-Apr-2024
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
377
Ambedkar Nagar
Vindhya-GAJA (JV)
20067263
DEVRIYA BUJURG Water Supply Scheme
2
9
5350
2023
2038
2053
21-Feb-2024
31-Dec-2024
23-Jul-2025
24-Jul-2025
Approved
APPROVED
Pending
View
378
Fatehpur
Power Mech Projects Ltd
20097453
DEWARA
1
2
1310
2023
2038
2053
25-Sep-2024
30-Jun-2025
18-Dec-2024
19-Dec-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of September(19.09.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
379
Mau
LC INFRA
20064262
Dewariya Bujurg village water Supply Scheme
1
8
1433
2022
2037
2052
22-Mar-2025
16-Apr-2025
16-Apr-2025
17-Apr-2025
Approved
All mentioned details found ok.
Approved
Approved
View
380
Sultanpur
UNIVERSAL MEP
20064733
DHAHA FIROJPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
2180
2023
2038
2053
12-Jan-2024
12-Jan-2024
16-Jan-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
381
Auraiya
GVPR
20040118
Dhakhli pur PWS
1
5
2492
2023
2038
2053
06-Jan-2024
05-Mar-2024
17-Apr-2024
19-Apr-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
382
Shahjahanpur
NCC Ltd.
20019672
Dhakia Elaqua Parwaizpur
2
2
2140
2022
2037
2052
31-Dec-2024
12-Apr-2024
12-Jul-2024
16-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Dhakia Elaqua Parwaizpur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
As per SWSM letter no. 3331/SE/QAP/2023-24, dated- 26.10.2023. Instead of Single curved sheet TKC has used twins sheets During erection of Zi-Al Tanks, replace the same with in 15 days.
As per TKC undertaking letter no.NCC/DWSM/SHAHJAHANPUR /69/2025-26.TKC has assured the pendency of work will be completed by 15.09.25.
Approved
All information on the portal for the completion certificate of Dhakiya Elaqua Parwaizpurscheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
383
Auraiya
GVPR
20089668
Dhamseni PWS
1
2
1500
2023
2038
2053
06-Jan-2022
26-Jul-2024
25-Jul-2024
27-Jul-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
384
Sultanpur
Vindhya-GAJA (JV)
20051916
DHANECH & JAKHANI KALAN WATER SUPPLY SCHEME
6
21
3190
2023
2038
2053
03-Dec-2022
02-Dec-2023
28-Dec-2024
01-Aug-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
385
Meerut
Power Mech Projects Ltd
20078466
DHANPURA
1
1
1654
2023
2038
2053
31-Dec-2024
01-Jun-2024
21-Oct-2024
22-Oct-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
386
Shahjahanpur
NCC Ltd.
20014806
DHARAMPUR KANJA
1
2
2150
2022
2037
2052
24-Dec-2023
31-Dec-2024
24-Mar-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Dharampur Kanja scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Dharmpur Kanja scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
387
Fatehpur
Power Mech Projects Ltd
20097512
DHARAMPUR SATO
1
21
9380
2023
2038
2053
25-Oct-2024
05-Sep-2024
24-Jan-2025
25-Jan-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of October(25.10.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
388
Auraiya
Indian Hume Pipe
20014498
DHARKAN PWS
1
3
2200
2022
2037
2052
08-May-2023
25-Jun-2023
14-Oct-2023
15-Oct-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
389
Ambedkar Nagar
Vindhya-GAJA (JV)
20035121
DHARMA MUBARAK PATTI WSS
2
7
4750
2023
2038
2053
21-Oct-2023
20-Jun-2025
13-Oct-2025
14-Oct-2025
Approved
Checked and Found ok
Approved
CHECKED AND FOUND OK
View
390
Fatehpur
Power Mech Projects Ltd
20102035
DHARMGADPUR
1
1
1250
2023
2038
2053
20-Sep-2024
04-Sep-2024
04-Sep-2024
05-Sep-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of June (05.06.2024) and Regular water supply is given to the consumers.
Approved
Verify
View
391
Bijnor
LC INFRA
8360890
DHELA AHIR VILLAGE WATER SCHEME
2
2
4074
2022
2037
2052
29-Sep-2023
08-Dec-2023
06-Jun-2024
07-Jun-2024
Approved
Every thing complete.
Approved
Everything is Completed.
View
392
Meerut
Power Mech Projects Ltd
20031858
DHINDALA
1
1
2917
2023
2038
2053
31-Dec-2024
12-Mar-2024
29-Jul-2024
07-Oct-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
393
Auraiya
Indian Hume Pipe
20055688
Dhorera PWS
1
2
2150
2022
2037
2052
22-Sep-2023
25-Sep-2024
20-Dec-2025
03-Jan-2025
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
394
Hardoi
NCC Ltd.
20012540
DIGHIA
2
7
2290
2022
2037
2052
26-Jul-2023
23-Sep-2023
22-Dec-2023
25-Dec-2024
Approved
ok
Approved
OK
View
395
Ayodhya
UNIVERSAL MEP
20031497
DILWAL GRAM PANCHAYAT WATER SUPPLY SCHEME
2
4
3550
2023
2038
2053
12-Oct-2023
12-Mar-2024
12-Mar-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
396
Meerut
Power Mech Projects Ltd
20011064
DIMOLI
1
1
2543
2022
2037
2052
31-Dec-2024
05-Mar-2024
16-Jul-2023
29-Oct-2024
Approved
Recommended for further Approvals.
Approved
approved
View
397
Muzaffarnagar
Gayatri Projects LTD
20022067
Dinkarpur
1
1
3691
2022
2037
2053
16-Sep-2022
25-Sep-2023
25-Dec-2023
26-Dec-2023
Approved
The details given by the contractor are correct at the time of approval.
Approved
OK
View
398
Kannauj
GVPR
20077099
DISARAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
1718
2023
2038
2053
08-Sep-2024
13-Apr-2024
16-Jul-2024
17-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
399
Shahjahanpur
NCC Ltd.
20084152
DIURAS GRAM PANCHAYAT VILLAGE WATER SUPPLY SCHEME
1
1
3000
2022
2037
2052
31-Dec-2024
09-Mar-2023
06-Nov-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Diuras scheme have been checked and verified. The submitted records are recommended and forwarded for further.
As per SWSM letter no. 3331/SE/QAP/2023-24, dated- 26.10.2023. Instead of Single curved sheet TKC has used twins sheets During erection of Zi-Al Tanks, replace the same with in 15 days
Approved
All information on the portal for the completion certificate of Diuras scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
400
Auraiya
GVPR
20025455
DIVARI PWS
1
4
3049
2023
2038
2053
01-Jun-2022
09-Feb-2023
24-Jun-2023
09-Mar-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
401
Auraiya
GVPR
20088702
Dobaa Mafi PWS
1
9
6146
2023
2038
2053
01-Jun-2024
13-Apr-2024
25-Feb-2024
13-Apr-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
402
Ayodhya
UNIVERSAL MEP
20058272
Dooli Askaran WSS
2
9
3190
2023
2038
2053
22-Jan-2024
15-Jun-2024
15-Jun-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
403
Kanpur Dehat
GVPR
20086224
Duda Mahua
1
2
1210
2023
2038
2053
17-Feb-2024
01-Jan-2024
10-Apr-2024
11-Apr-2024
Approved
forward for further action
Approved
All work of scheme found satisfactory
View
404
Shahjahanpur
NCC Ltd.
20077474
DUDHAUNA WSS
1
3
2810
2022
2037
2052
20-Sep-2023
31-Dec-2024
30-Dec-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Dudhauna scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Dudhauna scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
405
Ambedkar Nagar
Vindhya-GAJA (JV)
20042858
DULHUPUR KALA WSS
1
5
4640
2023
2038
2053
23-Nov-2023
20-Jun-2025
14-Oct-2025
15-Oct-2025
Approved
Checked and found ok
Pending
View
406
Bijnor
LC INFRA
8388706
DULI CHANDPUR VILLAGE WATER SUPPLY SCHEME
1
1
2810
2022
2037
2052
23-Sep-2021
24-Oct-2024
25-Jan-2025
26-Jan-2025
Approved
Every thing complete.
Approved
Everything Completed.
View
407
Meerut
Power Mech Projects Ltd
20085472
DUNGAR RO
1
1
3100
2022
2037
2052
31-Dec-2024
10-Feb-2024
26-Jun-2024
10-Oct-2024
Approved
Recommended for further Approvals.
Approved
approved
View
408
Kanpur Dehat
GVPR
20077488
DURGA PURWA
2
3
2129
2023
2038
2053
17-Feb-2024
14-Nov-2023
29-Mar-2024
30-Mar-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
409
Meerut
Power Mech Projects Ltd
20098105
DURJANPUR
1
1
943
2022
2037
2052
31-Dec-2024
12-Apr-2024
30-Aug-2024
01-Jan-2025
Approved
Recommended for further Approval
Approved
approved
View
410
Ayodhya
UNIVERSAL MEP
20031482
DWARIKAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
4
2120
2023
2038
2053
12-Oct-2023
12-Dec-2023
12-Dec-2023
15-Nov-2024
Approved
FOUND OK
Pending
View
411
Fatehpur
Power Mech Projects Ltd
20097455
EKDALA
1
1
2572
2023
2038
2058
15-May-2023
30-Jun-2025
18-Dec-2024
19-Dec-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of September (19.09.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
412
Ambedkar Nagar
Vindhya-GAJA (JV)
20058784
EKDALLA, SABUKPUR WSS
2
8
6820
2023
2038
2053
26-Dec-2025
24-Jul-2025
09-Nov-2025
10-Nov-2025
Approved
Scheme completed and ready for O&M
Pending
View
413
Auraiya
GVPR
20089638
Ekgara bidhuna PWS
1
8
3718
2023
2038
2053
01-Jun-2024
08-Jul-2024
07-Jul-2024
09-Jul-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
414
Sultanpur
UNIVERSAL MEP
20066895
EKLAKHI & SEVKARI GRAM PANCHAYAT WATER SUPPLY SCHEME
5
14
4160
2023
2038
2053
12-Jan-2024
31-Dec-2024
10-Jan-2025
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
415
Shahjahanpur
NCC Ltd.
20015359
ENDEYPUR WSSS
3
3
2790
2022
2037
2052
13-Aug-2023
31-Dec-2024
30-Nov-2023
16-Nov-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of ENDEYPUR W/S scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Endeypur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
416
Kanpur Dehat
GVPR
20069958
enjua rampur
1
0
1846
2023
2038
2053
17-Feb-2024
19-Dec-2023
03-May-2024
04-May-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
417
Shahjahanpur
NCC Ltd.
20015311
ETAURA DADROL w/s
1
2
2140
2022
2037
2052
31-Aug-2023
31-Dec-2024
30-Nov-2023
16-Nov-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Etaura scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Etaura scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
418
Meerut
Power Mech Projects Ltd
20058352
FAIZABAD PACHGAON ,SALEH NAGAR & JOHRA
3
3
3886
2023
2038
2053
31-Dec-2024
12-Aug-2024
29-Dec-2024
31-Dec-2024
Approved
CHECKED AND VERIFIED....
Approved
approved
View
419
Auraiya
Indian Hume Pipe
20033764
Faizullapur PWS
3
3
2200
2022
2037
2052
22-Sep-2023
25-Jul-2023
16-Nov-2023
17-Nov-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
420
Meerut
Power Mech Projects Ltd
20013156
FAKARPUR KURI GANGHERI
3
3
4475
2022
2037
2052
31-Dec-2024
20-Dec-2022
10-May-2023
17-Feb-2025
Approved
Recommended for further Approval
Approved
approved
View
421
Auraiya
GVPR
20091173
Fareha PWS
1
3
1834
2023
2038
2053
01-Jun-2022
17-Oct-2024
16-Oct-2024
18-Oct-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
422
Bijnor
LC INFRA
20026179
Fatahpur Ahtmali Village Water Supply
5
5
2514
2022
2037
2052
18-Aug-2022
18-Sep-2024
19-Dec-2024
20-Dec-2024
Approved
Every thing complete.
Approved
Every thing is Completed.
View
423
Meerut
Power Mech Projects Ltd
20098984
FATEHPUR WATER SUPPLY SCHEME
1
1
597
2023
2038
2053
31-Dec-2024
06-May-2024
24-Sep-2024
17-Feb-2025
Approved
Recommended for further Approval
Approved
approved
View
424
Bijnor
LC INFRA
20011559
Fatehullahpur Dargoo Village Water Supply Scheme
2
2
2231
2022
2037
2052
10-Feb-2024
11-Dec-2023
10-Jun-2024
11-Jun-2024
Approved
Every thing complete.
Approved
Everything Complete.
View
425
Ambedkar Nagar
Vindhya-GAJA (JV)
20026122
FATTEPUR KAKARDILA WATER SUPPLY SCHEME
2
12
3310
2023
2038
2053
28-Sep-2023
12-Oct-2024
11-Jan-2025
12-Jan-2025
Approved
checked and verified
Approved
SCHEME COMPLETED
View
426
Kannauj
GVPR
20067643
FEEROJPUR TERAN GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
2508
2023
2038
2053
16-Aug-2024
20-Mar-2024
22-Jun-2024
23-Jun-2024
Approved
FORWARDED FOR FURTHER ACTION.
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance
View
427
Ayodhya
UNIVERSAL MEP
20030477
FIROZPUR MAKHDOOMI GRAM PANCHAYAT WATER SUPPLY SCHEME
2
17
8360
2023
2038
2053
12-Oct-2023
26-Dec-2023
26-Dec-2023
01-Feb-2025
Approved
FOUND OK
Pending
View
428
Auraiya
GVPR
20039829
Gadanpur &singlamau pws
3
4
3646
2033
2038
2053
06-Jan-2022
05-Jun-2024
04-Jun-2024
05-Jun-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
429
Kannauj
GVPR
20098277
GADANPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
3
4
2568
2023
2038
2053
14-Nov-2024
23-Jan-2025
23-Apr-2025
24-Apr-2025
Approved
forwarded for further action
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
430
Ayodhya
VSA
20061550
GADAULI WSS
2
7
3060
2023
2038
2053
20-Feb-2024
05-Jun-2024
05-Jun-2024
15-Dec-2024
Approved
Found OK
Approved
Found Correct
View
431
Ayodhya
UNIVERSAL MEP
20058492
Gaddopur & Jagdeshpur WSS
2
14
4460
2023
2038
2053
22-Jan-2024
05-Dec-2024
05-Dec-2024
01-Feb-2025
Approved
FOUND OK
Pending
View
432
Azamgarh
LC INFRA
20014130
GADHAN KHURD WATER SUPPLY SCHEME
1
5
2962
2022
2037
2052
31-May-2023
15-Jan-2024
17-Apr-2024
18-Apr-2024
Approved
OK
Approved
OK
View
433
Kannauj
GVPR
20036192
GADIA BALIDATPUR GRAMIN PEYJAL YOJNA
3
6
4408
2023
2038
2053
13-May-2024
25-Mar-2024
27-Jun-2024
28-Jun-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
434
Farrukhabad
Vindhya-GAJA (JV)
20093053
GADIYA HAIBATPUR SVS
1
4
2604
2023
2038
2053
30-May-2025
07-Feb-2024
22-May-2024
23-May-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
435
Mau
LC INFRA
20058572
Gagaupur Rural Village Water Supply Scheme
2
6
2701
2022
2037
2052
02-Aug-2024
01-Apr-2025
01-Apr-2025
02-Apr-2025
Approved
Approved
Approved
approve
View
436
Kanpur Dehat
Indian Hume Pipe
20034280
GAHLOO
1
3
2210
2022
2037
2052
24-Nov-2022
31-Dec-2024
18-Apr-2024
01-May-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
437
Amethi
Vindhya-GAJA (JV)
20070878
GAIMAU WATER SUPPLY SCHEME
1
6
1965
2023
2038
2053
23-Mar-2024
07-Jun-2024
07-Sep-2024
08-Dec-2024
Approved
All Document not provided by EPC hence returns to the EPC
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
View
438
Farrukhabad
Vindhya-GAJA (JV)
20076678
GAISINGHPUR SVS
1
2
2592
2023
2038
2053
30-May-2025
23-May-2025
23-May-2024
24-May-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
439
Bijnor
LC INFRA
20018248
Gajipur Water Supply Scheme
2
2
3256
2022
2037
2052
26-Jan-2025
26-Jan-2025
26-Jan-2025
27-Jan-2025
Approved
Every thing completed.
Approved
Everything Complete.
View
440
Bahraich
PNC-SPML-JV
7620547
Gajpatipur Pws
1
22
6290
2022
2037
2052
30-Jun-2025
14-Jun-2025
19-May-2024
15-Jun-2025
Approved
approved
Approved
scheme completed
View
441
Kanpur Dehat
Indian Hume Pipe
20025512
Galuapur
1
1
2390
2022
2037
2052
25-Aug-2022
31-Dec-2024
31-Mar-2024
01-Apr-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
442
Meerut
Power Mech Projects Ltd
20020769
GANESHPUR
2
2
5688
2022
2037
2052
31-Dec-2024
26-May-2024
30-Oct-2024
31-Oct-2024
Approved
Recommended for further Approval
Approved
Approved
View
443
Ayodhya
UNIVERSAL MEP
20031484
GANESHPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
4270
2023
2038
2053
12-Oct-2023
31-Jan-2024
31-Jan-2024
01-Feb-2025
Approved
FOUND OK
Pending
View
444
Gorakhpur
NCC Ltd.
8361112
Ganeshpur WATER SUPPLY SCHEME
4
4
2142
2022
2037
2052
11-Feb-2023
10-Oct-2022
06-Oct-2022
06-Jan-2023
Approved
testttt
Approved
Approved
View
445
Farrukhabad
Vindhya-GAJA (JV)
20081341
GANGAICH & NARAINPUR MVS
2
4
3408
2023
2038
2053
31-Mar-2025
18-Dec-2024
31-Mar-2025
01-Apr-2025
Approved
All the parameters of scheme verified can take in O&M
Approved
OK
View
446
Ayodhya
VSA
20096900
GANGAPUR MU RAMAIPUR WSS
4
12
1530
2023
2038
2053
20-Mar-2024
28-Nov-2024
28-Nov-2024
06-May-2025
Approved
FOUND OK
Pending
View
447
Amethi
Vindhya-GAJA (JV)
20068067
GANGAULI & GHAGUGHAR WATER SUPPLY SCHEME
1
13
4152
2023
2038
2053
23-Mar-2023
20-Jun-2024
20-Sep-2024
21-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents.
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance..
View
448
Mau
GA INFRA-VPL
20100987
GANGUWABARI & TIGHARA GRAM PANCHAYAT WATER SUPPLY SCHEME
3
9
3240
2023
2038
2053
30-May-2025
14-Apr-2025
14-Apr-2025
15-Apr-2025
Approved
Approved
Approved
Approved
View
449
Bijnor
LC INFRA
8388856
GANURA JALALPUR SULTAN GRAMPANCHAYAT WATER SUPPLY SCHEME
2
2
3029
2022
2037
2052
29-Sep-2023
10-Dec-2023
08-Jun-2024
09-Jun-2024
Approved
every thing completed
Approved
every thing completed
View
450
Amethi
Vindhya-GAJA (JV)
20101973
GARHA MAFI WATER SUPPLY SCHEME
1
6
1883
2023
2038
2053
04-Jul-2024
13-Nov-2024
13-Feb-2025
13-May-2025
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance..
View
451
Kanpur Dehat
GVPR
20086506
garhi mahera
1
4
2453
2023
2038
2053
15-Apr-2024
25-Jan-2024
02-May-2024
03-May-2024
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
452
Kannauj
GVPR
20036142
GARHIYA PAH GRAMIN PEYJAL YOJNA
2
5
2988
2023
2038
2053
16-May-2024
15-Nov-2024
19-Feb-2025
20-Feb-2025
Approved
Forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
453
Meerut
Power Mech Projects Ltd
20037230
GARINA
1
1
4765
2022
2037
2052
31-Dec-2024
06-Feb-2024
25-Jun-2024
21-Jan-2025
Approved
Recommended for further Approval
Approved
approved
View
454
Shahjahanpur
NCC Ltd.
20014024
Gariya Chhavi W/s
1
8
2797
2022
2037
2052
30-Aug-2023
31-Dec-2024
30-Nov-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Gariya Chhavi scheme have been checked and verified. The submitted records are recommended and forwarded for further
Approved
All information on the portal for the completion certificate of Gariya Chhavi scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
455
Amethi
Vindhya-GAJA (JV)
20068335
GARTHOLIYA & LOHANG PUR WATER SUPPLY SCHEME
2
13
4186
2023
2038
2053
08-Feb-2024
06-Jun-2024
06-Sep-2024
07-Dec-2024
Approved
d All things found satisfactory in the Scheme and finalized for Operation And Maintenance
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance..
View
456
Ayodhya
VSA
20051266
GAURA & CHAKSENPUR
2
7
3800
2023
2038
2053
23-Nov-2023
31-Mar-2025
28-Mar-2025
05-Apr-2025
Approved
FOUND OK
Pending
View
457
Sultanpur
UNIVERSAL MEP
20066978
GAURA BARAMAU & BHAKHARI GRAM PANCHAYAT WATER SUPPLY SCHEME
2
13
5847
2023
2038
2053
12-Jan-2024
12-Jan-2024
28-Jun-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
458
Fatehpur
Power Mech Projects Ltd
20097810
GAURI , KESHOPUR MALAHIA
6
14
4030
2023
2038
2053
14-May-2024
30-Jun-2025
01-Sep-2025
10-Jan-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of October (11.10.2024).
Approved
Verified
View
459
Fatehpur
Power Mech Projects Ltd
20097459
GEDURI
1
1
1880
2023
2038
2053
20-Sep-2024
02-Oct-2024
02-Oct-2024
03-Oct-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of July (03.07.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
460
Kanpur Dehat
Indian Hume Pipe
20025609
Genda Mau
1
2
2350
2022
2037
2052
25-Aug-2022
31-Dec-2024
31-Mar-2024
01-Apr-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
461
Meerut
Power Mech Projects Ltd
20076654
GESUPUR BAPHAWAT
1
1
2363
2023
2038
2053
31-Dec-2024
14-Aug-2024
03-Jan-2025
04-Jan-2025
Approved
Recommended for further Approvals.
Approved
Approved
View
462
Meerut
Power Mech Projects Ltd
20083009
GESUPUR SUMARLI
1
1
3037
2022
2037
2052
11-Jun-2025
05-May-2024
20-Sep-2024
11-Apr-2025
Approved
Recommended for further Approval
Approved
approved
View
463
Fatehpur
Power Mech Projects Ltd
20100806
GHANGHAOL
1
1
3970
2023
2038
2053
20-Sep-2024
19-Feb-2025
19-Feb-2025
20-Feb-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of November (20.11.2024) and Regular water supply is given to the consumers.
Approved
Verify
View
464
Fatehpur
Power Mech Projects Ltd
20097460
GHARWASIPUR
1
1
1820
2023
2038
2058
14-Aug-2023
30-Jun-2025
11-Nov-2024
12-Nov-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of August (12.08.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
465
Fatehpur
Power Mech Projects Ltd
20097813
GHURI BUJURG
2
2
1840
2023
2038
2053
23-Jan-2025
22-Sep-2024
07-Feb-2025
08-Feb-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of November (08.11.2024) and Regular water supply is given to the consumers.
Approved
Verify
View
466
Sultanpur
Vindhya-GAJA (JV)
20069780
GHURIPUR WATER SUPPLY SCHEME
2
2
2290
2023
2038
2053
05-Feb-2024
23-Mar-2025
23-Mar-2025
21-Jun-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
467
Kannauj
GVPR
20067381
GIRGHARPUR & SIKANDERPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
3
3141
2023
2038
2053
16-Aug-2024
04-Nov-2024
07-Feb-2025
08-Feb-2025
Approved
forwarded for Further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
468
Sultanpur
UNIVERSAL MEP
20066948
GODVA & RAMNAGAR KOT GROUP OF GRAM PANCHAYAT WATER SUPPLY SCHEME
2
13
4090
2023
2038
2053
12-Jan-2024
12-Jan-2024
22-Nov-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
469
Auraiya
GVPR
20099255
Gopalpur & Ranipur PWS
1
2
3390
2023
2038
2053
01-Jun-2024
30-Apr-2024
29-Apr-2024
01-May-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
470
Kanpur Dehat
Indian Hume Pipe
20034281
GOPALPUR TALUKA
1
3
2270
2022
2037
2052
23-Nov-2023
31-Dec-2024
28-Feb-2024
01-Mar-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
471
Bijnor
LC INFRA
20014035
GOPALPUR WATER SUPPLY SCHEME
1
3
2647
2022
2037
2052
02-Nov-2023
01-Jul-2024
29-Dec-2024
30-Dec-2024
Approved
Every thing complete.
Approved
all document comepete
View
472
Meerut
Power Mech Projects Ltd
20082936
GOTKA DHANAWALI
2
2
4477
2022
2037
2052
31-Dec-2024
31-Oct-2024
01-Aug-2024
01-Nov-2024
Approved
Recommended for further Approvals.
Approved
approved
View
473
Meerut
Power Mech Projects Ltd
20068678
GOVINDPUR & KHARKHARI
2
2
3616
2022
2037
2052
31-Dec-2024
05-Sep-2024
22-Jan-2025
23-Jan-2025
Approved
Recommended for further Approvals.
Approved
Approved
View
474
Meerut
Power Mech Projects Ltd
20011580
GOVINDPUR URF GHASAULI
1
1
4953
2022
2037
2052
31-Dec-2024
04-Feb-2023
23-Jun-2023
15-Nov-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
475
Fatehpur
Power Mech Projects Ltd
20095838
GOVINDPUR&GHOSHI
5
5
4200
2023
2038
2053
15-May-2023
30-Jun-2025
23-Mar-2025
24-Mar-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of December (24.12.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
476
Meerut
Power Mech Projects Ltd
20076748
GOVINDPURI
1
1
2838
2022
2037
2052
31-Dec-2024
30-Jun-2024
16-Nov-2024
17-Nov-2024
Approved
Recommended for further Approvals.
Approved
approved
View
477
Shahjahanpur
NCC Ltd.
20019675
Gowar Sanda
1
2
2780
2022
2037
2052
31-Aug-2023
31-Dec-2024
30-Nov-2023
16-Nov-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Gowar Sanda scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All documents uploaded on the portal for the Project completion certificate of Gowar Sanda scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
478
Fatehpur
Power Mech Projects Ltd
20097513
GUDAURA
1
2
3500
2023
2038
2053
18-Mar-2025
30-Jun-2025
26-Jan-2025
27-Jan-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of October (27.10.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
479
Farrukhabad
Vindhya-GAJA (JV)
20076924
GUDERA SVS
1
5
3020
2023
2038
2053
30-May-2025
13-Feb-2024
28-May-2024
29-May-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
water supply regular in all villages
View
480
Shahjahanpur
NCC Ltd.
20019678
Gulam Khera
1
1
2430
2022
2037
2052
14-Dec-2023
31-Dec-2024
14-Mar-2024
16-Nov-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Gulam khera scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Gulam Kheda scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
481
Jhansi
NCC Ltd.
8009992
Gulara GOV
42
10600
63447
2023
2038
2053
30-Jun-2022
30-Aug-2023
19-Nov-2024
20-Nov-2024
Approved
Checked
Approved
checked and approved
View
482
Auraiya
Indian Hume Pipe
20014861
GURA PWS
2
6
1750
2022
2037
2052
08-May-2023
01-Aug-2023
07-Nov-2023
01-Nov-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
483
Hardoi
NCC Ltd.
20092452
GURAULI
1
2
3300
2022
2037
2052
05-Mar-2023
22-Mar-2023
21-Jun-2023
24-Dec-2024
Approved
ok
Approved
OK
View
484
Shahjahanpur
NCC Ltd.
20018478
Guravava
1
1
2820
2022
2037
2052
20-Jul-2023
31-Dec-2024
27-Oct-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of GURGAVA scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Gurgawan scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
485
Baghpat
LC INFRA
8362576
GWALI KHERA
1
1
2269
2022
2037
2052
31-Dec-2024
06-Nov-2023
06-Nov-2023
07-Nov-2023
Approved
Check and found Satisfactory.
Approved
OK
View
486
Kannauj
GVPR
20036274
GYANPUR GRAMIN PEYJAL YOJNA
1
5
2801
2023
2038
2053
13-May-2024
04-Nov-2024
07-Feb-2025
08-Feb-2025
Approved
forwarded for Further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
487
Hardoi
NCC Ltd.
20012213
Haidarpur
2
3
2510
2022
2037
2052
26-Jul-2023
03-May-2023
04-Aug-2023
13-Dec-2024
Approved
ok
Approved
OK
View
488
Sultanpur
UNIVERSAL MEP
20064688
HAJIPATTI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
7
7170
2023
2038
2053
12-Jan-2024
31-Dec-2024
31-Jan-2025
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
489
Ambedkar Nagar
Vindhya-GAJA (JV)
20081283
HAJPURA WSS
1
2
2180
2023
2038
2053
15-Mar-2024
22-Dec-2024
23-Mar-2025
24-Mar-2025
Approved
Checked and found OK
Approved
Scheme completed
View
490
Ayodhya
UNIVERSAL MEP
20030159
HALIM NAGAR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
5
5140
2023
2038
2053
12-Oct-2023
30-Oct-2023
30-Oct-2023
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
491
Etawah
Indian Hume Pipe
20024534
Haluhrjipur
1
3
1900
2022
2037
2052
22-Sep-2023
26-Feb-2024
06-Jun-2024
07-Jun-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory
View
492
Kannauj
GVPR
20036200
HAMIRPUR GRAMIN PEYJAL YOJNA
4
5
2965
2023
2038
2053
13-May-2024
25-Mar-2024
27-Jun-2024
28-Jun-2024
Approved
FORWARDED FOR FURTHER ACTION.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
493
Farrukhabad
Vindhya-GAJA (JV)
20076885
HAMIRPUR KHAS SVS
1
4
4364
2023
2038
2053
31-Mar-2025
21-Jan-2024
05-Jun-2024
06-Jun-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
water supply i regular in all connected villages
View
494
Auraiya
GVPR
20084713
Hamirpur ruru
3
6
2872
2023
2038
2053
06-Jan-2022
28-Mar-2024
27-Mar-2024
28-Mar-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
495
Bijnor
LC INFRA
8359688
HANSU PURA HARKISHANPUR VILLAGE WATER SCHEME
1
1
7489
2022
2037
2052
26-Aug-2023
19-Dec-2023
07-Jun-2024
08-Jun-2024
Approved
Every thing completed.
Approved
Everything Complete.
View
496
Bijnor
LC INFRA
20011793
Hara Ahmad Pur Jalal Water Supply Scheme
1
1
1532
2022
2037
2052
10-Feb-2024
12-Dec-2023
09-Jun-2024
10-Jun-2024
Approved
Every thing completed.
Approved
Everything Completed
View
497
Sultanpur
Vindhya-GAJA (JV)
20078808
HARAHA WSS
2
7
1573
2023
2038
2053
25-Mar-2023
23-Mar-2024
30-Jan-2025
01-Aug-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
498
Ambedkar Nagar
Vindhya-GAJA (JV)
20058508
HARAKPUR KAURAHA Water Supply Scheme
3
8
2310
2023
2038
2052
16-Jul-2023
19-May-2025
19-May-2025
20-May-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme Completed
View
499
Hamirpur
PNC-SPML-JV
8135500
Haraulipur GOV and Tubewell Scheme 125 Nos.
39
51
57818
2023
2038
2053
14-Oct-2022
30-Sep-2024
18-Nov-2024
19-Nov-2024
Approved
Approved ,checklist of doc’c Uploaded at portal
Approved
Approve
View
500
Auraiya
GVPR
20041744
HARBANSHPUR PWS
2
1
2325
2023
2038
2053
01-Jun-2023
06-Dec-2024
30-Apr-2024
16-Jun-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
501
Ambedkar Nagar
Welspun Kaveri Infraprojects JV
20008680
Hardiha
6
9
4430
2022
2037
2052
07-Jan-2022
30-May-2025
27-Jan-2025
28-Jan-2025
Approved
SCHEME COMPLETED
Approved
Scheme completed
View
502
Baghpat
LC INFRA
20014202
Haria Khera W/S SCHEME
1
1
4301
2022
2037
2052
31-Dec-2024
06-Nov-2023
06-Nov-2023
07-Nov-2023
Approved
Found ok
Approved
OK
View
503
Ayodhya
UNIVERSAL MEP
20030707
HARIBANDHAN PUR & ISMAIL NAGAR SINHORA GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME
5
19
3870
2023
2038
2053
12-Oct-2023
23-Oct-2023
23-Oct-2023
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
504
Ayodhya
UNIVERSAL MEP
20030102
HARIHARPUR BALIYA GRAM PANCHAYAT WATER SUPPLY SCHEME
1
3
3950
2023
2038
2053
12-Oct-2023
05-Oct-2023
05-Oct-2023
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
505
Ambedkar Nagar
Vindhya-GAJA (JV)
20019768
Harinathpur
3
6
2480
2023
2038
2053
03-Aug-2023
22-Jun-2023
30-Nov-2024
01-Dec-2024
Approved
Approved by TPI
Approved
Scheme completed
View
506
Sultanpur
UNIVERSAL MEP
20066127
HARKHI DOULATPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
2
4
2330
2023
2038
2053
12-Jan-2024
12-Jan-2024
30-Jun-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
507
Farrukhabad
Vindhya-GAJA (JV)
20081706
HARSINGHPUR GAHILWAR & GALAR PUR MVS
2
2
3209
2023
2038
2053
30-May-2025
10-Feb-2024
25-May-2024
26-May-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
508
Rampur
SPML Infra
20090708
HARSU NAGLA SV GP W/S Scheme
1
1
1230
2022
2037
2052
29-Sep-2024
19-Jun-2024
19-Sep-2024
20-Sep-2024
Approved
All docs found in order
Pending
View
509
Bijnor
LC INFRA
20017182
HASANPUR PALKI WATER SUPPLY SCHEME
1
1
1159
2022
2037
2052
10-Feb-2022
07-Dec-2023
05-Jun-2024
06-Jun-2024
Approved
every thing completed
Approved
Everything Completed
View
510
Meerut
Power Mech Projects Ltd
20016924
HASANPUR QADIM
1
1
5729
2022
2037
2052
31-Dec-2024
15-Dec-2022
06-May-2023
05-Nov-2024
Approved
checked and verified...................................
Approved
approved
View
511
Ambedkar Nagar
Vindhya-GAJA (JV)
20058532
HASANPUR SUNTHAR Water Supply Scheme
1
7
2270
2023
2038
2053
26-Dec-2023
22-Aug-2024
24-Nov-2024
25-Nov-2024
Approved
Scheme completed and ready for O&M
Approved
HASANPUR SUNTHAR SCHEME COMPLETED
View
512
Azamgarh
LC INFRA
20058071
Hasanpur water supply scheme
2
3
3208
2023
2038
2053
09-May-2024
22-Jul-2024
21-Oct-2024
22-Oct-2024
Approved
ok
Approved
OK
View
513
Fatehpur
Power Mech Projects Ltd
20097818
HASIMPUR MADEPUR
2
3
754
2023
2038
2059
25-Sep-2024
30-Jun-2025
23-Mar-2025
24-Mar-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of December(24.12.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
514
Ambedkar Nagar
Vindhya-GAJA (JV)
20035268
HATHINARAJ WSS
1
2
6270
2023
2038
2053
22-Oct-2022
21-Oct-2023
05-Dec-2024
06-Dec-2024
Approved
Checked and found ok
Approved
Scheme completed
View
515
Kanpur Dehat
GVPR
20069940
Hike pur
1
4
1760
2023
2038
2053
17-Feb-2024
30-Dec-2023
03-Apr-2024
04-Apr-2024
Approved
Forward for further action pls
Approved
All work of scheme found satisfactory
View
516
Hardoi
NCC Ltd.
20012221
Hinguapur
1
1
1490
2022
2037
2052
27-Jan-2022
11-Sep-2023
11-Dec-2023
30-Nov-2024
Approved
ok
Approved
OK
View
517
Ghaziabad
LC INFRA
20018966
HIRDAYPUR MADAULA PWS SCHEME
1
1
3100
2022
2037
2052
27-Aug-2021
31-Oct-2024
27-Mar-2025
01-Apr-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
Approved
View
518
Farrukhabad
Vindhya-GAJA (JV)
20093133
HOTEPUR MVS
1
3
2488
2023
2038
2053
30-May-2025
09-Feb-2024
24-May-2024
25-May-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
519
Ayodhya
UNIVERSAL MEP
20031474
Hunhuna Gram Panchayat Water Supply Scheme
1
2
2450
2023
2038
2053
12-Oct-2023
30-Dec-2023
30-Dec-2024
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
520
Shahjahanpur
NCC Ltd.
8388648
HUSENPUR KAVRA
1
1
2590
2022
2037
2052
31-Jul-2023
31-Dec-2024
30-Oct-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Husenpur Kavra scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Husenpur Kavra scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
521
Bijnor
LC INFRA
8360397
HUSENPUR KHASA VILLAGE WATER SCHEME
1
1
3266
2022
2037
2052
30-Sep-2024
12-Dec-2023
10-Jun-2024
11-Jun-2024
Approved
Every thing completed.
Approved
Everything Complete.
View
522
Azamgarh
LC INFRA
20057908
Husenpur water supply scheme
4
8
2706
2023
2038
2053
09-May-2024
20-Aug-2024
20-Nov-2024
21-Nov-2024
Approved
ok
Approved
OK
View
523
Kannauj
GVPR
20067729
HUSHE PUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
1463
2023
2038
2053
08-Sep-2024
22-Mar-2024
24-Jun-2024
25-Jun-2024
Approved
FORWARDED FOR FURTHER ACTION
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
524
Ayodhya
UNIVERSAL MEP
20030150
IBBRAHIM PUR DEWALI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
8
2733
2023
2038
2053
12-Oct-2023
21-Jan-2024
21-Jan-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
525
Meerut
Power Mech Projects Ltd
20078428
IKLA
1
1
1618
2022
2037
2052
31-Dec-2024
25-May-2024
09-Oct-2024
01-Jan-2025
Approved
Recommended for further Approval
Approved
approved
View
526
Auraiya
Indian Hume Pipe
8359385
Ikorapur
1
1
2870
2022
2037
2052
14-Sep-2022
15-May-2023
28-Oct-2023
29-Oct-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
527
Meerut
Power Mech Projects Ltd
20098082
IKWARA
1
1
2319
2023
2038
2053
31-Jan-2025
28-May-2024
15-Oct-2024
01-Nov-2024
Approved
Recommended for further Approval
Approved
approved
View
528
Muzaffarnagar
Gayatri Projects LTD
20022206
ILLAHBANS
1
1
3500
2022
2037
2052
16-Sep-2022
06-Oct-2023
06-Jan-2024
07-Jan-2024
Approved
The details given by the contractor are correct at the time of approval.
Pending
View
529
Sultanpur
UNIVERSAL MEP
20066569
IMILIYA KALAN & IMILIYA KHURD GROUP OF GRAM PANCHAYAT WATER SUPPLY SCHEME
2
15
4320
2023
2038
2053
12-Jan-2024
31-Dec-2024
10-Jan-2025
01-Feb-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified, found as per requirements.
View
530
Mau
LC INFRA
20012739
IMILIYADIH GP WATER SUPPLY SCHEME
1
2
1647
2022
2037
2052
23-Sep-2024
22-Apr-2025
22-Apr-2025
23-Apr-2025
Approved
Approved
Approved
Approved.
View
531
Kanpur Dehat
Indian Hume Pipe
20050279
Ingwara
2
2
1730
2022
2037
2052
24-Nov-2022
31-Dec-2024
30-Sep-2023
01-Oct-2023
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
532
Fatehpur
Power Mech Projects Ltd
20100815
IRADADPUR DHARMGADPUR
3
4
2330
2023
2038
2058
14-Aug-2023
30-Jun-2025
01-Dec-2024
02-Dec-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of September(02.09.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
533
Muzaffarnagar
JMC - Lakshmi (JV)
8360313
Islamabad
1
1
1968
2022
2037
2052
16-Mar-2021
07-Jul-2024
07-Oct-2024
08-Oct-2024
Approved
The details given by the contractor are correct at the time of approval.
Approved
APPROVED
View
534
Gautam Buddha Nagar
LC INFRA
20017812
ISMAIL NAGAR URF BHOYRA
1
1
2811
2022
2037
2052
20-Mar-2023
31-Mar-2024
31-Oct-2024
01-Nov-2024
Approved
Project certificate is verified
Pending
View
535
Kannauj
GVPR
20036253
ISMAILPUR DIGAN GRAMIN PEYJAL YOJNA
2
5
3233
2023
2038
2053
13-May-2024
25-Mar-2024
27-Jun-2024
28-Jun-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
536
Amethi
Gayatri Projects LTD
20099327
ISMAILPUR WATER SUPPLY SCHEME
3
5
2799
2022
2037
2052
24-Nov-2024
17-Jun-2024
19-Sep-2024
28-Nov-2024
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance
View
537
Meerut
Power Mech Projects Ltd
20019647
ITAYIRA
1
1
2759
2022
2037
2052
31-Dec-2024
09-Mar-2024
08-Feb-2024
11-Nov-2024
Approved
Recommended for further Approvals.
Approved
approved
View
538
Ambedkar Nagar
Vindhya-GAJA (JV)
20026085
ITWAN WATER SUPPLY SCHEME
1
3
3440
2023
2038
2053
04-Aug-2023
20-Jul-2024
02-Dec-2024
03-Dec-2024
Approved
Checked and found OK
Approved
SCHEME COMPLETED
View
539
Meerut
Power Mech Projects Ltd
20098089
JAFARNAGAR BEGAN
1
1
2174
2023
2038
2053
31-Dec-2024
06-Aug-2024
23-Dec-2024
24-Dec-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
540
Kannauj
GVPR
20036157
JAFRABAD GRAMIN PEYJAL YOJNA
1
6
4144
2023
2038
2053
13-May-2024
07-Mar-2024
10-Jun-2024
11-Jun-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
541
Auraiya
GVPR
20064605
Jaganpur and bhureypur kalan PWS
3
1
3370
2023
2038
2053
06-Jan-2022
03-May-2024
17-Mar-2024
03-May-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
542
Auraiya
GVPR
20093717
Jagatpur & harchandpur PWS
1
1
2676
2023
2038
2053
06-Jan-2022
20-Jun-2024
03-May-2024
21-Jun-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
543
Kanpur Dehat
GVPR
20077379
JAGDISHPUR & RAMPUR TAPPEWAN
4
7
3164
2023
2038
2053
17-Feb-2024
06-Dec-2023
20-Jan-2024
21-Jan-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
544
Bijnor
LC INFRA
20026244
Jagdishpur Village Water Supply
1
1
1967
2022
2037
2052
10-Feb-2022
26-Apr-2024
25-Jan-2025
26-Jan-2025
Approved
Every thing complete.
Approved
Every thing is completed.
View
545
Hardoi
NCC Ltd.
20012228
Jagrauli
1
2
2060
2022
2037
2052
26-Jul-2023
28-May-2023
29-Aug-2023
07-Dec-2024
Approved
ok
Approved
OK
View
546
Auraiya
GVPR
20089628
Jagupur & Purwa Patti PWS
2
9
3447
2023
2038
2053
06-Jan-2022
24-Apr-2024
21-Apr-2024
23-Apr-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
547
Farrukhabad
Vindhya-GAJA (JV)
20091347
JAHANGIRPUR & RAYPUR MVS
2
3
3452
2023
2038
2053
30-May-2025
28-Jun-2024
11-Oct-2024
12-Oct-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
548
Bijnor
LC INFRA
20026115
Jahangirpur khas Village Water Supply
1
3
2323
2022
2037
2052
31-Dec-2024
26-Nov-2023
28-May-2024
29-May-2024
Approved
every thing is completed
Approved
Every thing is completed
View
549
Ghaziabad
LC INFRA
20021552
JAHANGIRPUR PWS SCHEME
1
1
6459
2022
2037
2052
20-Sep-2021
30-Sep-2024
31-Jan-2025
01-Feb-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
All work checked and recommended for O&M
View
550
Mau
GA INFRA-VPL
20092462
JAHANIYAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
2
8
2960
2023
2038
2053
30-May-2025
14-Feb-2025
13-Feb-2025
14-Feb-2025
Approved
Approved
Approved
Approved
View
551
Amethi
Gayatri Projects LTD
20034334
Jainagara water supply scheme
1
2
1850
2022
2037
2052
03-Nov-2024
02-Jun-2024
05-Sep-2024
10-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance...
View
552
Ambedkar Nagar
Vindhya-GAJA (JV)
20058509
JAINAPUR Water Supply Scheme
3
10
4220
2023
2038
2053
26-Dec-2023
30-Jun-2024
30-Sep-2024
01-Oct-2024
Approved
Ok
Approved
SCHEME COMPLETED
View
553
Mau
LC INFRA
20064306
Jairamgarh Gram Panchayat Water Supply Scheme
1
2
1550
2022
2037
2052
29-Jun-2024
23-Apr-2025
23-Apr-2025
25-Apr-2025
Approved
Approved
Approved
approve
View
554
Ambedkar Nagar
Vindhya-GAJA (JV)
20026145
JAITI WATER SUPPLY SCHEME
2
2
2230
2023
2038
2053
28-Sep-2023
10-Mar-2025
20-Mar-2025
21-Mar-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme completed
View
555
Etawah
Indian Hume Pipe
20094053
Jaitpur Totaram
1
1
1275
2022
2037
2052
02-Apr-2024
11-Mar-2024
14-Jun-2024
15-Jun-2024
Approved
Forwarded to you for further action.
Approved
All work of scheme found satisfactory.
View
556
Gautam Buddha Nagar
LC INFRA
20013499
JAITWARPUR W/S SCHEME
1
1
3856
2022
2037
2052
23-Sep-2023
30-Oct-2023
31-Oct-2024
01-Nov-2024
Approved
Project certificate is verified
Approved
Verified
View
557
Kanpur Dehat
GVPR
20069905
jajmuiya
1
4
1941
2023
2038
2053
17-Feb-2024
08-Nov-2023
23-Mar-2024
24-Mar-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
558
Ayodhya
UNIVERSAL MEP
20058762
JALAL PUR & MUZZAFFARPUR WSS
2
2
4280
2023
2038
2053
19-Mar-2024
03-Jul-2024
03-Jul-2024
01-Feb-2025
Approved
FOUND OK
Pending
View
559
Hardoi
NCC Ltd.
20012236
Jalalpur
2
2
1810
2022
2037
2052
26-Jul-2023
10-Jan-2023
13-Apr-2023
07-Dec-2024
Approved
ok
Approved
OK
View
560
Hardoi
NCC Ltd.
20088748
JALALPUR
2
3
2370
2022
2037
2052
26-Jul-2023
15-Apr-2023
14-Aug-2023
22-Nov-2024
Approved
OK
Approved
OK
View
561
Meerut
Power Mech Projects Ltd
20011295
JALALPUR AKKHEPUR
1
1
2513
2022
2037
2052
31-Dec-2024
25-Jun-2024
16-Nov-2024
17-Nov-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
562
Auraiya
GVPR
20089644
Jalalpur bidhuna PWS
1
1
1420
2023
2038
2053
06-Jan-2022
25-Jan-2024
24-Nov-2023
25-Nov-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
563
Ghaziabad
LC INFRA
8359714
JALALPUR DIDHAR
1
1
4600
2022
2037
2052
27-Aug-2021
31-Oct-2024
27-Mar-2025
01-Apr-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
Approved
View
564
Kannauj
GVPR
20050185
JALALPUR KATRI BANGER GRAM PANCHAYAT WATER SUPPLY SCHEME
3
5
3402
2023
2038
2053
15-Jun-2024
28-Apr-2024
31-Jul-2024
01-Aug-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
565
Kanpur Dehat
Indian Hume Pipe
20034284
JALALPUR NAGIN
1
8
4790
2022
2037
2052
24-Nov-2022
23-Nov-2023
31-Jul-2023
01-Aug-2023
Approved
forward for further action
Approved
All work of scheme found satisfactory
View
566
Ambedkar Nagar
Welspun Kaveri Infraprojects JV
20008736
Jalalpur Sabakpur
2
4
4808
2022
2037
2052
07-Jul-2023
30-Jun-2025
17-Jun-2025
15-Jul-2025
Approved
Checked and Found Ok
Approved
Scheme completed
View
567
Kannauj
GVPR
20077048
JALALPUR SARWAN & ANTI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
3
3205
2023
2038
2053
16-Aug-2024
15-Nov-2024
19-Feb-2025
20-Feb-2025
Approved
forwarded for Further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
568
Meerut
Power Mech Projects Ltd
20094310
JALALUDDINPUR MASOODPUR GAWRI
1
1
1001
2022
2037
2052
31-Dec-2024
14-Aug-2024
02-Jan-2025
02-Dec-2024
Approved
Recommended for further Approval
Approved
approved
View
569
Hardoi
NCC Ltd.
20012249
Jalihapur (GOGP)
2
2
3360
2022
2037
2052
26-Jul-2023
20-Jan-2024
24-Apr-2024
30-Nov-2024
Approved
ok
Approved
OK
View
570
Kanpur Dehat
VSA
20092640
jallapur sikandra
1
1
2185
2023
2038
2023
30-Apr-2023
31-Dec-2023
10-May-2024
11-May-2025
Approved
Forward to further necessary action pls.
Approved
All work of scheme found satisfactory
View
571
Auraiya
GVPR
20091078
Jalokhar PWS
2
1
1893
2023
2038
2053
01-Jun-2022
03-Oct-2024
23-Jan-2024
10-Mar-2025
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
572
Meerut
Power Mech Projects Ltd
8359773
JAMALPUR JALALPUR
1
1
3352
2022
2037
2052
07-Mar-2023
06-Jun-2024
22-Oct-2024
01-Dec-2024
Approved
Recommended for further Approvals.
Approved
approved
View
573
Meerut
Power Mech Projects Ltd
20078458
JAMALPUR MAJRA
1
1
1545
2022
2037
2052
31-Dec-2024
29-Jan-2024
18-Jun-2024
09-Dec-2024
Approved
Recommended for further approval
Approved
approved
View
574
Amethi
Gayatri Projects LTD
20085725
JAMALPUR RAMPUR & TARAUNA WATER SUPPLY SCHEME
2
16
4652
2022
2037
2052
12-Jul-2024
07-Jun-2024
08-Jun-2024
15-Dec-2024
Approved
All Document not provided by EPC hence returns to the EPC
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance...
View
575
Auraiya
GVPR
20065630
Jamauli PWS
1
7
4544
2023
2038
2053
06-Jan-2022
06-Jan-2024
11-Feb-2024
12-Feb-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
576
Mau
LC INFRA
20015834
Jamdra gp water supply Scheme
3
9
3152
2022
2037
2052
03-Aug-2023
02-Apr-2025
20-Apr-2025
25-Apr-2025
Approved
Approved......
Approved
approve
View
577
Balrampur
Larsen & Toubro Ltd
20019344
Jamuni Kalan water supply scheme
1
3
2262
2022
2037
2052
26-Jun-2023
06-Feb-2024
06-May-2024
07-May-2024
Approved
Approved as per theTKC agreement.
Pending
View
578
Ayodhya
UNIVERSAL MEP
20030486
JAMUNIYA MAU GRAM PANCHAYAT WATER SUPPLY SCHEME
2
2
3210
2023
2038
2053
12-Oct-2023
21-Sep-2023
21-Sep-2023
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
579
Meerut
Power Mech Projects Ltd
20011220
JANGETHI
1
1
5364
2022
2037
2052
31-Dec-2024
02-Feb-2023
21-Jun-2023
15-Oct-2024
Approved
Recommended for further Approvals....................................
Approved
APPROVED
View
580
Shahjahanpur
NCC Ltd.
20058837
JANYURI WSS
1
2
2060
2022
2037
2052
31-Dec-2024
20-Feb-2024
21-May-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Janyuri scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Janyuri scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
581
Amethi
Vindhya-GAJA (JV)
20066597
JARAUTA VILLAGE WATER SUPPLY SCHEME
2
8
2614
2023
2038
2053
06-Jan-2024
08-Nov-2024
08-Feb-2025
09-May-2025
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
582
Farrukhabad
Vindhya-GAJA (JV)
20092017
JARHARI MVS
2
3
2543
2023
2038
2053
30-May-2025
11-Oct-2024
11-Oct-2024
12-Oct-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
583
Bijnor
LC INFRA
20068049
JARIFPUR CHATAR WATER SUPPLY SCHEME
2
2
2246
2022
2037
2052
23-Jan-2023
26-Nov-2024
26-Nov-2024
27-Nov-2024
Approved
Every thing complete.
Approved
Everything Completed.
View
584
Meerut
Power Mech Projects Ltd
20098103
JASAR SULTANNAGAR
1
1
9048
2022
2037
2052
31-Dec-2024
13-Jul-2024
03-Dec-2024
04-Dec-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
585
Farrukhabad
Vindhya-GAJA (JV)
20074152
Jasmai SVS
1
4
3322
2023
2038
2053
30-May-2025
17-Jan-2024
01-May-2024
02-May-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
586
Kannauj
GVPR
20050183
JASUA MAI GRAM PANCHAYAT WATER SUPPLY SCHEME
2
3
1861
2023
2038
2053
15-Jun-2024
06-Nov-2024
10-Nov-2024
10-Feb-2025
Approved
forwarded for Further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
587
Meerut
Power Mech Projects Ltd
20098111
JATAULA
1
1
1332
2023
2038
2053
31-Dec-2024
28-Apr-2024
14-Sep-2024
21-Apr-2025
Approved
Recommended for further Approval
Approved
approved
View
588
Shahjahanpur
NCC Ltd.
20015006
Jathiura W/s
1
2
3010
2022
2037
2052
09-Jul-2024
31-Dec-2024
08-Oct-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Jathiura scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Jathiura scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
589
Meerut
Power Mech Projects Ltd
20066858
JATPURA
1
1
2654
2022
2037
2052
31-Dec-2024
09-Feb-2024
28-Jun-2024
10-Oct-2024
Approved
Recommended for further Approvals.
Approved
approved
View
590
Meerut
Power Mech Projects Ltd
8359772
JEORI
1
1
4287
2022
2037
2052
31-Dec-2024
17-Dec-2022
05-May-2023
07-Nov-2024
Approved
Recommended for further Approval
Approved
approved
View
591
Amethi
Vindhya-GAJA (JV)
20101945
JETHU MAWAI WATER SUPPLY SCHEME
1
2
1248
2023
2038
2053
04-Jul-2024
06-Nov-2024
06-Feb-2025
07-May-2025
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
592
Bijnor
LC INFRA
8360401
JHIRAN VILLAGE WATER SCHEME
1
1
3467
2022
2037
2052
02-Nov-2023
10-Dec-2023
08-Jun-2024
09-Jun-2024
Approved
Every thing complete.
Approved
Everything is Completed.
View
593
Meerut
Power Mech Projects Ltd
20076732
JHUNJUNEE
1
1
3210
2023
2038
2053
31-Dec-2024
10-Aug-2024
27-Dec-2024
28-Dec-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
594
Kanpur Dehat
GVPR
20077384
JIGNISH
2
0
2179
2023
2038
2053
17-Feb-2024
07-Nov-2023
22-Mar-2024
23-Mar-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
595
Bahraich
PNC-SPML-JV
20014725
JIHURA MAFI TEJWAPUR PWS
1
9
8236
2022
2037
2052
30-Jun-2025
07-Mar-2025
23-Jun-2024
08-Mar-2025
Approved
Approved .
Approved
Scheme completed
View
596
Meerut
Power Mech Projects Ltd
20011008
JITHAULI
1
1
2845
2023
2038
2053
31-Dec-2024
16-Mar-2023
01-Aug-2023
07-Oct-2024
Approved
Recommended for further Approval
Approved
Approved
View
597
Meerut
Power Mech Projects Ltd
20077312
JITPUR
1
1
2019
2022
2037
2052
31-Dec-2024
05-May-2024
21-Sep-2024
02-Mar-2025
Approved
Recommended for further Approval
Approved
approved
View
598
Auraiya
GVPR
20025458
JiwaSirsani PWS
1
4
3322
2023
2038
2053
03-Dec-2021
09-Dec-2022
30-Nov-2023
01-Dec-2024
Approved
Forwarded for further action.
Approved
All work of scheme fond satisfactory.
View
599
Ambedkar Nagar
Vindhya-GAJA (JV)
20083855
JOGAPUR WSS
1
3
1800
2023
2038
2053
22-Mar-2024
14-Mar-2024
14-Jun-2024
15-Jun-2024
Approved
Checked and found ok
Approved
SCHEME COMPLETED
View
600
Auraiya
GVPR
20084700
Juan PWS
1
1
3590
2023
2038
2053
06-Jan-2022
28-Mar-2024
27-Mar-2024
28-Mar-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
601
Kanpur Dehat
GVPR
20070068
JUGRAJPUR BITHOOR
1
2
1879
2023
2038
2053
17-Feb-2024
30-Dec-2024
07-May-2024
08-May-2024
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
602
Hardoi
NCC Ltd.
20012123
JUJVAMAU
2
2
2180
2022
2037
2052
14-Jun-2023
08-Oct-2023
17-Jan-2024
24-Dec-2024
Approved
ok
Approved
OK
View
603
Meerut
Power Mech Projects Ltd
20100949
JURRANPUR
1
1
1332
2023
2038
2053
11-Jun-2025
13-Aug-2024
03-Jan-2025
04-Jan-2025
Approved
Recommended for further Approvals.
Approved
Approved
View
604
Auraiya
Indian Hume Pipe
20014862
Kaba PWS
2
4
1950
2022
2037
2052
08-May-2023
26-Jul-2023
09-Nov-2023
10-Nov-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
605
Sultanpur
UNIVERSAL MEP
20066706
KABARI & DHAKHVA GROUP OF GRAM PANCHAYAT WATER SUPPLY SCHEME
2
9
5700
2023
2038
2053
12-Jan-2024
31-Dec-2024
10-Jan-2025
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified, found as per requirements.
View
606
Azamgarh
LC INFRA
20101522
KABIRUDDINPUR WATER SUPPLY SCHEME
2
4
4811
2022
2037
2052
31-May-2023
15-Oct-2024
23-Oct-2024
24-Oct-2024
Approved
OK
Approved
OK
View
607
Sultanpur
UNIVERSAL MEP
20064704
KACHANAYA GRAM PANCHAYAT WATER SUPPLY SCHEME
1
4
2600
2023
2038
2053
12-Jan-2024
12-Jan-2024
11-Oct-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
608
Kanpur Dehat
Indian Hume Pipe
20034278
KADARI
1
2
1600
2022
2037
2052
23-Nov-2023
31-Dec-2023
30-Oct-2023
01-Nov-2023
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
609
Kanpur Dehat
Indian Hume Pipe
20034279
KAILAI
1
2
1960
2022
2037
2052
23-Nov-2023
31-Dec-2024
31-May-2023
01-Jun-2023
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
610
Sambhal
SPML Infra
20018922
KAILI WATER SUPPLY SCHEME
1
1
2830
2022
2037
2052
18-May-2023
05-Sep-2023
05-Dec-2023
06-Dec-2023
Approved
Trial Run Successfully Completed On 13-12-24
Pending
View
611
Amethi
Gayatri Projects LTD
20085825
KAIMA WATER SUPPLY SCHEME
1
7
2762
2022
2037
2052
22-Mar-2025
14-Sep-2024
20-Dec-2024
10-Mar-2025
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance...
View
612
Kannauj
GVPR
20066556
KAIRDA & USMANPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
3
8
3413
2023
2038
2053
16-Aug-2024
06-Nov-2024
09-Feb-2025
10-Feb-2025
Approved
forwarded for Further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
613
Meerut
Power Mech Projects Ltd
20011223
KAITHWARI
1
1
3867
2022
2037
2052
31-Dec-2024
05-Feb-2023
28-Jun-2023
15-Oct-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
614
Shahjahanpur
NCC Ltd.
8388653
KAJRI NOORPUR
1
1
2440
2022
2037
2052
31-Jul-2023
31-Dec-2024
30-Oct-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Kajri Noorpur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Kajri Noorpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
615
Muzaffarnagar
Gayatri Projects LTD
20058586
KAKRA WATER SUPPLY SCHEME CHANDPUR BASDHARA (PART I)
1
2
8670
2022
2037
2052
16-Sep-2022
02-Aug-2024
02-Aug-2024
03-Aug-2024
Approved
The details given by the contractor are correct at the time of approval.
Approved
OK
View
616
Bijnor
LC INFRA
8388783
KAKRALA VILLAGE WATER SCHEME
1
2
2269
2022
2037
2052
30-Sep-2023
12-Dec-2023
10-Jun-2024
11-Jun-2024
Approved
Every thing completed.
Approved
All document complete
View
617
Bahraich
PNC-SPML-JV
20012357
KAKRI BALAHA PWS
1
4
7884
2022
2037
2052
31-Dec-2025
09-Nov-2025
15-May-2025
10-Nov-2025
Approved
Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/11/0314, kindly complete it.
Pending
View
618
Meerut
Power Mech Projects Ltd
20067097
KALAND
1
1
4983
2022
2037
2052
31-Dec-2024
23-Jul-2024
12-Dec-2024
13-Dec-2024
Approved
Recommended for further Approvals.
Pending
View
619
Meerut
Power Mech Projects Ltd
20011111
KALANJARI
1
1
4672
2022
2037
2052
31-Dec-2024
11-Feb-2023
01-Jul-2023
07-Oct-2024
Approved
Recommended for further Approval
Approved
Approved
View
620
Bijnor
LC INFRA
8360938
KALANPUR BUZURG (111951) GRAMPANCHAYAT WATER SUPPLY SCHEME
2
1
1812
2022
2037
2052
29-Sep-2023
10-Dec-2023
08-Jun-2024
09-Jun-2024
Approved
Every thing completed
Approved
Everything Completed
View
621
Mau
LC INFRA
20082303
KALFANPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
2020
2022
2037
2052
09-Feb-2025
02-Apr-2025
01-Apr-2025
02-Apr-2025
Approved
All Documents checked and found OK
Approved
All documents found ok.
View
622
Kanpur Dehat
Indian Hume Pipe
20065249
Kalla
2
2
2700
2022
2037
2052
23-Sep-2022
31-Dec-2024
31-Mar-2023
01-Apr-2023
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
623
Bareilly
NCC Ltd.
20015435
KALLIA water supply scheme
1
1
1763
2022
2037
2052
20-Jan-2022
13-May-2024
13-Aug-2024
25-Oct-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Kallia scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Pending
View
624
Kannauj
GVPR
20090087
KALYANPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
1714
2023
2038
2053
08-Sep-2024
04-Apr-2024
07-Jul-2024
08-Jul-2024
Approved
forwarded for Further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
625
Hardoi
NCC Ltd.
20012208
Kamalpur
1
3
3240
2022
2037
2052
26-Jul-2023
10-Nov-2023
09-Feb-2024
24-Dec-2024
Approved
ok
Approved
OK
View
626
Bijnor
LC INFRA
20016841
KAMALPUR WATER SUPPLY SCHEME
2
2
2478
2022
2037
2051
10-Feb-2024
11-Apr-2024
13-Oct-2024
14-Oct-2024
Approved
Every thing complete.
Approved
Everything Complete.
View
627
Meerut
Power Mech Projects Ltd
20078484
KAMARUDDINNAGAR MADHIYAI
1
1
3757
2023
2038
2053
31-Dec-2024
10-Aug-2024
27-Dec-2024
02-Nov-2024
Approved
Recommended for further Approvals..................................
Approved
APPROVED
View
628
Kanpur Dehat
GVPR
20053215
KAMIR
2
2
3401
2023
2038
2053
14-Sep-2023
09-Dec-2023
09-Jan-2024
10-Dec-2024
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
629
Sultanpur
UNIVERSAL MEP
20066583
KAMOLIYA & PIKOURA GROUP OF GRAM PANCHAYAT WATER SUPPLY SCHEME
3
8
5060
2023
2038
2053
12-Jan-2024
31-Dec-2024
25-Jul-2024
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified, found as per requirements.
View
630
Ambedkar Nagar
Vindhya-GAJA (JV)
20058490
KANAK PATTI Water Supply Scheme
1
3
1690
2023
2038
2053
26-Dec-2023
30-Jun-2024
30-Sep-2024
01-Oct-2024
Approved
Checked and found ok
Approved
Scheme completed
View
631
Amethi
Vindhya-GAJA (JV)
20068372
KANAK SINGHPUR & KORARI HEERSHAH WATER SUPPLY SCHEME
2
7
3844
2023
2038
2053
23-Mar-2024
10-Nov-2024
10-Feb-2025
11-May-2025
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
632
Ghaziabad
LC INFRA
20018959
KANAKPUR PWS SCHEME
1
1
3523
2022
2037
2052
21-Mar-2022
31-Oct-2024
28-Feb-2025
01-Mar-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
All work checked and recommended for O&M
View
633
Mau
GA INFRA-VPL
20092557
KANDHERI MUNGESAR GRAM PANCHAYAT WATER SUPPLY SCHEME
2
7
3060
2023
2038
2053
30-Jun-2025
16-Jun-2025
16-Jun-2025
17-Jun-2025
Approved
Approved
Approved
Approved
View
634
Muzaffarnagar
Gayatri Projects LTD
20098069
KANHAERI GP RO WSS
2
2
3452
2023
2038
2053
16-Sep-2022
14-Jan-2024
14-Apr-2024
15-Apr-2024
Approved
The details given by the contractor are correct at the time of approval.
Approved
OK
View
635
Kannauj
GVPR
20067448
KANKAR KUYIN GRAM PANCHAYAT WATER SUPPLY SCHEME
1
7
3866
2023
2038
2053
16-Aug-2024
16-Apr-2024
19-Jul-2024
20-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
636
Amethi
Vindhya-GAJA (JV)
20066620
KANKOO PUR WATE SUPPLY SCHEME
1
5
2406
2023
2038
2053
17-Feb-2024
22-Jun-2024
22-Sep-2024
23-Dec-2024
Approved
All Document not provided by EPC hence returns to the EPC
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
View
637
Kannauj
GVPR
20067400
KANNAUJ KACHHOHA & CHAUDHARIAPUR KACHHOHA GRAM PANCHAYAT WATER SUPPLY SCHEME
2
2
2840
2023
2038
2053
16-Aug-2024
13-Apr-2024
16-Jul-2024
17-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
638
Amethi
Vindhya-GAJA (JV)
20070858
KANOO WATER SUPPLY SCHEME
1
14
2176
2023
2038
2053
07-Feb-2024
24-Jun-2024
27-Sep-2024
28-Dec-2024
Approved
All Document not provided by EPC hence returns to the EPC
Approved
.
View
639
Kannauj
GVPR
20077119
KANOULI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
5
2692
2023
2038
2053
08-Sep-2024
10-Apr-2024
13-Jul-2024
14-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
640
Kanpur Dehat
Indian Hume Pipe
20016928
Kapasi
2
3
3100
2022
2037
2052
05-Feb-2022
31-Dec-2024
31-Mar-2024
01-Apr-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
641
Shahjahanpur
NCC Ltd.
8388651
KAPOOR NAGLA
3
3
3300
2022
2037
2052
24-Dec-2023
31-Dec-2024
24-Mar-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Kapoor Nagla scheme have been checked and verified. The submitted records are recommended and forwarded for further
Approved
All information on the portal for the completion certificate of Kapoor Nagla scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
642
Kannauj
GVPR
20036892
KAPOOR PUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
3
2943
2023
2038
2053
15-Jun-2024
07-Apr-2024
11-Jul-2024
12-Jul-2024
Approved
FORWARDED FOR FURTHER ACTION.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
643
Kannauj
GVPR
20066423
KAPOORPUR KATRI & JALALPUR AMARA GRAM PANCHAYAT WATER SUPPLY SCHEME
5
10
4246
2023
2038
2053
16-Aug-2024
31-Mar-2024
03-Jul-2024
04-Jul-2024
Approved
forwarded for Further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
644
Kanpur Dehat
GVPR
20053094
Kaprahat
1
4
4703
2023
2038
2053
18-Nov-2023
15-Dec-2023
22-Mar-2024
23-Mar-2024
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
645
Amethi
Vindhya-GAJA (JV)
20065165
KAPURIPUR Water Supply Scheme
2
8
2387
2022
2038
2052
17-Feb-2024
07-May-2024
10-Aug-2024
13-Nov-2024
Approved
Hardcopy submitted
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
View
646
Auraiya
GVPR
20084718
Karahi PWS
1
4
3085
2023
2038
2053
01-Jun-2022
31-Dec-2024
17-Mar-2025
19-Mar-2025
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
647
Bahraich
PNC-SPML-JV
20098744
KARAILA SAHBAJPUR RF PWS
2
15
5290
2022
2037
2052
31-Dec-2025
28-Aug-2025
12-Oct-2023
29-Aug-2025
Approved
scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/09/0145 kindly complete it.
Approved
Scheme completed.
View
648
Farrukhabad
GVPR
20019920
Karamchand Pur W/S Scheme
1
1
1724
2022
2037
2052
26-Aug-2022
10-Jun-2024
15-May-2024
28-Jul-2025
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
649
Sultanpur
Vindhya-GAJA (JV)
20084305
KARAMPUR PARVARBHAR WSS
1
2
2230
2022
2037
2052
23-Mar-2023
22-Mar-2024
30-Jan-2025
01-Aug-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
650
Kannauj
GVPR
20077112
KAREEM NAGAR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
5
2001
2023
2038
2053
08-Sep-2024
04-Apr-2024
07-Jul-2024
08-Jul-2024
Approved
Forwarded for further action.
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
651
Azamgarh
LC INFRA
20101559
KARENDUA GRAM PANCHAYAT RURAL WATER SUPPLY SCHEME
3
13
4859
2022
2037
2052
21-Mar-2023
29-Oct-2023
31-Jan-2024
01-Feb-2024
Approved
OK
Approved
OK
View
652
Kanpur Dehat
GVPR
20053345
Kari Kalwari
1
3
3337
2023
2038
2053
18-Nov-2023
22-Nov-2023
06-Apr-2024
07-Apr-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
653
Shahjahanpur
NCC Ltd.
20057572
KARI MAKUAPUR WSS
2
3
2160
2022
2037
2052
30-Nov-2023
31-Dec-2024
29-Feb-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Kari Makuapur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Kari Makuapur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
654
Jaunpur
AFCONS
20072467
KARMAHI VILLAGE WATER SUPPLY SCHEME
3
13
3752
2023
2038
2053
21-Feb-2024
13-Sep-2024
09-Mar-2025
10-Mar-2025
Approved
Checked and Found ok.
Approved
ok
View
655
Bahraich
PNC-SPML-JV
20017959
KARNAI JARWAL PWS
1
12
3538
2022
2037
2052
31-Dec-2025
25-Jul-2025
25-Jul-2025
26-Jul-2025
Approved
scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/08/1952 kindly complete it.
Approved
SCHEME COMPLETED
View
656
Kanpur Dehat
Indian Hume Pipe
20025503
Karom
1
5
2400
2022
2037
2052
24-Aug-2022
31-Dec-2024
07-Nov-2023
01-Dec-2023
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
657
Ambedkar Nagar
Vindhya-GAJA (JV)
20072738
KARTORA WSS
1
5
3300
2023
2038
2053
08-Mar-2024
02-Jul-2025
02-Jul-2025
03-Jul-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme Completed
View
658
Sultanpur
Vindhya-GAJA (JV)
20069822
KASAIPUR WATER SUPPLY SCHEME
2
2
3020
2023
2038
2053
05-Feb-2024
28-Dec-2024
01-Apr-2025
02-Apr-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements and O&M start date 01/08/2025
View
659
Amethi
Vindhya-GAJA (JV)
20066590
KASARA&PATAPUR VILLAGE WATER SUPLLY SCHEME
2
19
3847
2023
2038
2053
06-Jan-2024
09-Nov-2024
09-Feb-2025
10-May-2025
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
660
Auraiya
GVPR
20091177
Kasba senganpur & Aima senganpur
3
3
5791
2023
2038
2053
06-Jan-2022
31-Dec-2024
25-May-2024
27-May-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
661
Auraiya
GVPR
20084721
Kashari
2
1
1705
2023
2038
2053
01-Jun-2022
30-Jun-2024
13-May-2024
30-Jun-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
662
Bijnor
LC INFRA
20019380
Kashmiri Abbunasarpur Water Supply
1
1
4356
2022
2037
2052
10-Feb-2022
17-Oct-2024
17-Oct-2024
18-Oct-2024
Approved
Everything is completed.
Approved
All document complete
View
663
Meerut
Power Mech Projects Ltd
20020256
KASIMPUR
1
1
3464
2022
2037
2052
31-Dec-2024
11-Dec-2023
26-Apr-2024
10-Oct-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
664
Raebareli
NCC Ltd.
20062144
KASNA WATER SUPPLY SCHEME
1
2
1272
2022
2037
2052
04-Aug-2024
21-Jul-2024
21-Dec-2023
21-Nov-2024
Approved
Ok
Approved
Ok
View
665
Amethi
Vindhya-GAJA (JV)
20068063
KASTHUNI PURAB WATER SUPPLY SCHEME
3
10
2937
2023
2038
2053
08-Feb-2024
28-Jun-2024
28-Sep-2024
29-Dec-2024
Approved
Hardcopy submiited and all documents found okay..
Pending
View
666
Kanpur Dehat
GVPR
20077252
KATEHI
1
3
1501
2023
2038
2053
17-Feb-2024
27-Nov-2023
11-Apr-2024
12-Apr-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
667
Kanpur Dehat
Indian Hume Pipe
20012659
Katethi
1
2
2960
2022
2037
2052
13-Oct-2021
31-Dec-2024
31-Aug-2023
01-Sep-2023
Approved
FORWARD FOR FURTHER NECESSRY ACTION PLS.
Approved
All work of scheme found satisfactory
View
668
Kanpur Dehat
GVPR
20077446
KATHIKA
2
2
1729
2023
2038
2053
17-Feb-2024
18-Dec-2023
02-May-2024
03-May-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
669
Shahjahanpur
NCC Ltd.
20015647
kathpura
3
3
1820
2022
2037
2052
04-Jan-2024
31-Dec-2024
04-Apr-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Kathpura scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Kathpura scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
670
Shahjahanpur
NCC Ltd.
20015877
Katia Rajjab
2
2
2890
2022
2037
2052
04-Jan-2024
31-Dec-2024
04-Apr-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Katia Rajjab scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Katiya Rajjab scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
671
Kannauj
GVPR
20050202
KATRI AMINABAD & MAHAM BALIPUR & JALALPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
4
7
4142
2023
2038
2053
15-Jun-2024
28-Mar-2024
30-Jun-2024
01-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
672
Kannauj
GVPR
20100928
KATRI GANGPUR GRAMM PANCHAYAT WATER SUPPLY SCHEME
2
2
1607
2023
2038
2053
14-Nov-2024
15-Nov-2024
19-Feb-2025
20-Feb-2025
Approved
forwarded for further action
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
673
Kanpur Dehat
Indian Hume Pipe
20034288
KAUSUM
1
3
3180
2022
2037
2052
24-Nov-2022
31-Dec-2024
30-Nov-2023
01-Dec-2023
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
674
Muzaffarnagar
Gayatri Projects LTD
20022997
KAZI KHERA RO WSS
1
2
5417
2022
2037
2052
16-Sep-2022
25-Oct-2023
25-Jan-2024
26-Jan-2024
Approved
The details given by the contractor are correct at the time of approval.
Approved
OK
View
675
Meerut
Power Mech Projects Ltd
20012923
KAZMABAD GOON
1
1
5441
2052
2037
2052
31-Dec-2024
10-Mar-2023
27-Jul-2023
28-Nov-2024
Approved
CHECKED AND VERIFIED....
Approved
approved
View
676
Etawah
Indian Hume Pipe
20026092
Kelamau PWS
1
2
1405
2022
2037
2052
22-Sep-2023
08-Jan-2024
16-Apr-2024
17-Apr-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
677
Mau
LC INFRA
20064365
Keshour Sultanipur Village Water Supply Scheme
5
9
2269
2022
2037
2052
20-Jul-2024
02-May-2025
02-May-2025
05-May-2025
Approved
Approved.
Approved
Approved.
View
678
Ambedkar Nagar
Vindhya-GAJA (JV)
20086834
KEWTALI WSS
6
9
4270
2023
2038
2053
23-Mar-2024
22-Mar-2025
22-Mar-2025
23-Mar-2025
Approved
CHECKED AND FOUND OK
Approved
Scheme completed
View
679
Mau
LC INFRA
20085366
KHAIRA NASIR PANCHAYAT WATER SUPPLY SCHEME
2
2
2440
2022
2037
2052
22-Mar-2025
05-May-2025
04-May-2025
05-May-2025
Approved
Approved..
Approved
Approved..
View
680
Bijnor
Vindhya-GAJA (JV)
20020694
Khairullapur Bila Ahatmali Gram Panchayat Water Supply
2
2
3491
2022
2037
2052
06-Jul-2023
25-Oct-2023
30-Apr-2024
01-May-2024
Approved
every thing completed
Approved
Everything Completed
View
681
Kannauj
GVPR
20100932
KHAJUHA GRAMM PANCHAYAT WATER SUPPLY SCHEME
1
1
1271
2023
2038
2053
14-Nov-2024
16-Apr-2024
19-Jul-2024
20-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
682
Ambedkar Nagar
Vindhya-GAJA (JV)
20019943
Khajuri
2
3
3780
2023
2038
2053
04-Aug-2022
03-Aug-2023
02-Dec-2024
03-Dec-2024
Approved
Checked and found OK
Approved
SCHEME COMPLETED
View
683
Kanpur Dehat
Indian Hume Pipe
20034272
KHAJURRA
1
3
2845
2022
2037
2052
24-Nov-2022
31-Dec-2024
31-Mar-2024
01-Apr-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
684
Meerut
Power Mech Projects Ltd
20090411
KHALIDPUR - DEDUPUR
2
2
3083
2023
2038
2053
31-Dec-2024
02-Apr-2024
19-Aug-2024
07-Nov-2024
Approved
checked and verified
Approved
approved
View
685
Bijnor
Vindhya-GAJA (JV)
20048038
Khalilullahpur Water Supply Scheme
1
1
3142
2023
2038
2053
06-Jul-2023
19-May-2024
19-Nov-2024
20-Nov-2024
Approved
Every thing complete.
Approved
Everything Complete
View
686
Kannauj
GVPR
20036138
KHANDE DEWAR GRAMIN PEYJAL YOJNA
1
1
3937
2023
2038
2053
13-May-2024
25-Mar-2024
27-Jun-2024
28-Jun-2024
Approved
FORWARDED FOR FURTHER ACTION.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
687
Shahjahanpur
NCC Ltd.
20014808
Khandsar
1
1
2900
2022
2037
2052
22-Jul-2023
31-Dec-2024
27-Oct-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Khandsar scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Khandsar scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
688
Hardoi
NCC Ltd.
20012358
Khanigawan Kalan
2
3
1900
2022
2037
2052
26-Jul-2023
20-Mar-2023
21-Jun-2023
07-Dec-2024
Approved
ok
Approved
OK
View
689
Kanpur Dehat
GVPR
20094174
khanpur chain kamalpur
2
7
4303
2023
2038
2053
14-Mar-2024
24-Dec-2023
08-May-2024
09-May-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
690
Azamgarh
LC INFRA
20053493
Khanpur Chitrawal Rural Water Supply Scheme
2
3
3635
2023
2038
2053
28-May-2024
10-Mar-2024
13-Jun-2024
14-Jun-2024
Approved
OK
Approved
OK
View
691
Meerut
Power Mech Projects Ltd
20020251
KHANUDA
1
1
2963
2022
2037
2052
31-Dec-2024
15-Jul-2024
01-Dec-2024
17-Dec-2024
Approved
Recommended for further Approval
Approved
approved
View
692
Bahraich
PNC-SPML-JV
20016081
KHAPURWA PHAKARPUR PWS
1
6
5301
2022
2037
2052
31-Dec-2025
18-Oct-2025
14-Sep-2024
18-Oct-2025
Approved
Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/10/0502, kindly complete it.
Pending
View
693
Sultanpur
UNIVERSAL MEP
20066066
KHARA GRAM PANCHAYAT WATER SUPPLY SCHEME
1
11
3965
2023
2038
2053
12-Jan-2024
31-Dec-2024
21-Jan-2025
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified, found as per requirements.
View
694
Kannauj
GVPR
20050190
KHARAULI GRAM PANCHAYAT WATER SUPPLY SCHEME
2
2
2815
2023
2038
2053
15-Jun-2024
11-Mar-2024
12-Jun-2024
13-Jun-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
695
Amethi
Gayatri Projects LTD
20034270
Kharawa water supply scheme
2
8
3349
2022
2037
2052
06-May-2024
09-Jun-2024
15-Sep-2024
11-Nov-2024
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
696
Meerut
Power Mech Projects Ltd
8362750
KHASPUR
1
1
2653
2022
2037
2052
31-Dec-2024
27-Jan-2023
15-May-2023
30-Jan-2025
Approved
Recommended for further Approval
Approved
approved
View
697
Meerut
Power Mech Projects Ltd
20082592
KHATA SAKOTI
2
2
6207
2023
2038
2053
31-Dec-2024
25-Sep-2024
15-Feb-2025
16-Feb-2025
Approved
Recommended for further Approvals.
Approved
Approved
View
698
Muzaffarnagar
Gayatri Projects LTD
20098206
KHATAULI GRAMIN GP RO WSS
2
2
18171
2023
2038
2053
16-Sep-2022
01-Dec-2024
01-Mar-2025
02-Mar-2025
Approved
The details given by the contractor are correct at the time of approval.
Pending
View
699
Meerut
Power Mech Projects Ltd
20090111
KHAWAJAHANPUR
1
1
964
2023
2038
2053
31-Dec-2024
03-Jun-2025
24-Oct-2024
15-Oct-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
700
Fatehpur
Power Mech Projects Ltd
20097822
KHAWAJIPUR SEMRAIYA
2
2
2170
2023
2038
2053
20-Sep-2024
11-Nov-2024
11-Nov-2024
12-Nov-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of August (12.08.2024) and Regular water supply is given to the consumers.
Approved
Verify
View
701
Fatehpur
Power Mech Projects Ltd
20095866
KHEOKHARI&BEYOTI
2
3
2910
2023
2033
2058
14-May-2024
30-Jun-2025
29-Apr-2025
30-Apr-2026
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of January(30.01.2025) and Regular water supply is given to the consumers.
Approved
Verified
View
702
Meerut
Power Mech Projects Ltd
20011051
KHERI KALAN
1
1
2146
2022
2037
2052
31-Dec-2024
24-Feb-2023
12-Jul-2023
13-Dec-2024
Approved
Recommended for further Approval
Approved
approved
View
703
Meerut
Power Mech Projects Ltd
20066793
KHERI MANIHAR
1
1
3806
2023
2038
2053
31-Dec-2024
12-Aug-2024
29-Dec-2024
30-Dec-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
704
Meerut
Power Mech Projects Ltd
8362770
KHERI TAPPA LAWAR
1
1
2716
2022
2037
2052
31-Dec-2024
15-Apr-2023
02-Sep-2023
17-Feb-2025
Approved
Recommended for Further Approval
Approved
approved
View
705
Ayodhya
VSA
20061571
KHEWLI & PUHLI WSS
4
12
4070
2023
2038
2053
20-Feb-2024
22-Oct-2024
23-Oct-2024
17-Jun-2025
Approved
FOUND OK
Pending
View
706
Kannauj
GVPR
20036300
KHIRIYA GRAMIN PEYJAL YOJNA
1
7
4841
2023
2038
2053
13-May-2024
25-Mar-2024
27-Jun-2024
28-Jun-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
707
Meerut
Power Mech Projects Ltd
20076746
KHIRWA NAUABAD
1
1
2498
2023
2038
2053
31-Dec-2024
13-Aug-2024
02-Jan-2025
03-Jan-2025
Approved
Recommended for further Approvals.
Approved
approved
View
708
Bijnor
LC INFRA
20018238
Khizarpur Water Supply
4
4
3335
2022
2037
2052
02-Sep-2022
18-Nov-2024
18-Nov-2024
19-Nov-2024
Approved
Everything Complete.
Approved
Everything Completed
View
709
Meerut
Power Mech Projects Ltd
20098178
KHORRAI-DAYALPUR
2
2
2705
2023
2038
2053
11-Jun-2025
16-Oct-2024
07-Mar-2025
08-Mar-2025
Approved
Recommended for further Approval
Approved
Approved
View
710
Kannauj
GVPR
20036895
KHOZI PUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
4
5767
2023
2038
2053
14-Nov-2024
07-Apr-2024
11-Jul-2024
12-Jul-2024
Approved
FORWARDED FOR FURTHER ACTION.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
711
Farrukhabad
Vindhya-GAJA (JV)
20080824
KHUDNA DHAMGAWAN SVS
1
2
3152
2023
2038
2053
31-Mar-2025
25-Nov-2024
09-Mar-2025
13-May-2025
Approved
All the parameters ok
Approved
ok
View
712
Bijnor
LC INFRA
20014032
KHURAHERY WATER SUPPLY SCHEME
2
2
3417
2022
2037
2052
02-Nov-2023
03-Jul-2024
31-Dec-2024
01-Jan-2025
Approved
Every thing completed.
Approved
Everything Complete.
View
713
Ayodhya
UNIVERSAL MEP
20030590
KHURDAHA GRAM PANCHAYAT WATER SUPPLY SCHEME
2
3
2220
2023
2038
2053
12-Oct-2023
09-Jun-2024
09-Jun-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
714
Farrukhabad
Vindhya-GAJA (JV)
20074156
KHWAJA AHMAD PUR KATIYA SVS
1
3
2335
2023
2038
2053
30-May-2025
11-Feb-2024
26-May-2024
27-May-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
715
Etawah
Indian Hume Pipe
20015029
Kiratpur
2
2
2530
2022
2037
2052
12-Sep-2022
10-Nov-2023
20-Apr-2024
25-Apr-2024
Approved
Forwarded for further action.
Approved
All work of the scheme found satisfactory
View
716
Meerut
Power Mech Projects Ltd
20011296
KISHANPUR BIRANA
1
1
3047
2022
2037
2052
31-Dec-2024
25-Jan-2023
14-Jun-2023
30-Dec-2024
Approved
Recommended for further Approval
Approved
approved
View
717
Meerut
Power Mech Projects Ltd
8362954
KISHORPUR
3
3
2366
2022
2037
2052
31-Dec-2024
16-Aug-2024
06-Jan-2005
07-Jan-2025
Approved
Recommended for further Approval
Approved
Approved
View
718
Kanpur Dehat
Indian Hume Pipe
20013583
Kishorpur
2
3
2100
2022
2037
2052
05-Feb-2022
04-Feb-2022
31-Aug-2023
01-Sep-2023
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
719
Meerut
Power Mech Projects Ltd
20011048
KITHOLI
1
1
4118
2022
2037
2052
31-Dec-2024
23-Aug-2023
27-Dec-2023
26-Dec-2024
Approved
CHECKED AND VERIFIED....
Approved
approved
View
720
Ambedkar Nagar
Vindhya-GAJA (JV)
20033707
KODRA WATER SUPPLY SCHEME
1
1
4250
2023
2038
2053
21-Oct-2023
14-Sep-2024
18-Feb-2025
19-Feb-2025
Approved
Checked and found OK
Approved
SCHEME COMPLETED
View
721
Meerut
Power Mech Projects Ltd
20068971
KOHLA , MUBARIKPUR & SAIDIPUR SETH
3
3
5912
2023
2038
2053
31-Dec-2024
25-Jul-2024
11-Dec-2024
13-Dec-2024
Approved
Recommended for further Approvals.
Approved
approved
View
722
Amethi
Vindhya-GAJA (JV)
20070889
KOHRA WATER SUPPLY SCHEME
1
13
5091
2023
2038
2053
08-Feb-2023
16-Dec-2024
16-Mar-2025
17-Jun-2025
Approved
Hardcopy submitted and found okay as per the submitted documents.
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance..
View
723
Hardoi
NCC Ltd.
20011914
Koilara
3
3
2530
2022
2037
2052
15-Jun-2023
08-Nov-2023
09-Feb-2024
22-Nov-2024
Approved
OK
Approved
OK
View
724
Bahraich
PNC-SPML-JV
8362948
KOLUHA GRAM PANCHAYAT RURAL DRINKING WATER SUPPLY SCHEME
1
1
5670
2022
2037
2052
30-Jun-2025
15-Apr-2025
14-Feb-2024
16-Apr-2025
Approved
ok
Approved
SCHEME COMPLETED
View
725
Amethi
Vindhya-GAJA (JV)
20070871
KORARI GIRDHAR SHAH WATER SUPPLY SCHEME
1
10
3130
2023
2038
2053
08-Feb-2023
22-Dec-2024
23-Mar-2025
16-Jun-2025
Approved
d All things found satisfactory in the Scheme and finalized for Operation And Maintenance
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance..
View
726
Kanpur Dehat
Indian Hume Pipe
20034283
KORAUWA
1
1
2600
2022
2037
2052
23-Nov-2023
31-Dec-2024
31-May-2023
01-Jun-2023
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
727
Kanpur Dehat
GVPR
20025222
Korhwa
1
4
3833
2023
2038
2053
26-Sep-2023
02-Feb-2023
18-Jun-2023
19-Jun-2023
Approved
Forward for necessary action pls
Approved
All work of scheme found satisfactory
View
728
Sultanpur
UNIVERSAL MEP
20091196
KORO GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
1928
2023
2038
2053
22-Mar-2024
22-Mar-2024
28-Nov-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
729
Ayodhya
UNIVERSAL MEP
20031423
KOT DEEH SARAIYAN & SARANGAPUR GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME
2
17
8140
2023
2038
2053
12-Oct-2023
30-Jun-2024
30-Jun-2024
10-Feb-2025
Approved
FOUND OK
Pending
View
730
Ayodhya
UNIVERSAL MEP
20058447
Kotara WSS
2
2
2990
2023
2038
2053
12-Oct-2023
14-Apr-2024
14-Apr-2024
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
731
Ayodhya
UNIVERSAL MEP
20058538
Kotdeeh WSS
1
1
3090
2023
2038
2053
12-Oct-2023
15-Oct-2024
05-Oct-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
732
Amethi
Vindhya-GAJA (JV)
20085690
KOTWAR MAU WATER SUPPLY SCHEME
1
8
1969
2023
2038
2053
29-Apr-2024
21-Jun-2024
21-Sep-2024
22-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
733
Farrukhabad
Vindhya-GAJA (JV)
20076673
KUBERPUR JUNNARDAR SVS
1
4
2479
2023
2038
2053
31-Mar-2025
21-Dec-2024
04-Apr-2025
13-May-2025
Approved
Ok..
Approved
ok
View
734
Kanpur Dehat
GVPR
20025196
Kudauli Madauli
1
3
3086
2023
2038
2053
26-Sep-2023
05-Dec-2023
19-Mar-2024
20-Mar-2024
Approved
TKC unable to submit the calibration certificate and other report for O&M and some work pending (Road restoration, Painting work {Pump House, Boundary wall & Gate}, Grouting. Ref. SWSM/BLG/TPI/KD/O&M/2025-26/6657 DT.30.07.2025. we can go to O&M through conditional, TKC submit the require document within 15 day's and complete the Balance work.
Approved
All work of scheme found satisfactory
View
735
Kanpur Dehat
GVPR
20065136
KUDHAWAL & SALEMPUR
2
0
3198
2023
2038
2053
18-Jan-2024
22-Dec-2023
30-Mar-2024
31-Mar-2024
Approved
Forward for further necessary action
Approved
All work of scheme found satisfactory
View
736
Kanpur Dehat
GVPR
20053524
KUIT KHEDA 1, SARIYAPUR
3
2
4209
2023
2038
2053
18-Nov-2023
15-Dec-2023
25-Mar-2024
26-Mar-2024
Approved
TKC unable to submit the calibration certificate and other report for O&M and some work pending (Road restoration, Grouting. Ref. SWSM/BLG/TPI/KD/O&M/2025-26/6657 DT.30.07.2025. we can go to O&M through conditional, TKC submit the require document within 15 day's and complete the Balance work.
Approved
All work of scheme found satisfactory
View
737
Hardoi
NCC Ltd.
20000039
KUIYAN
1
3
2180
2022
2037
2052
29-Apr-2023
12-Jun-2023
11-Sep-2023
24-Dec-2024
Approved
ok
Approved
OK
View
738
Auraiya
GVPR
20100433
Kukarkat PWS
1
4
3225
2023
2038
2053
01-Jun-2022
30-Mar-2025
19-Feb-2024
31-Mar-2025
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
739
Meerut
Power Mech Projects Ltd
20020947
KULANJAN
2
2
6001
2022
2037
2052
31-Dec-2024
24-Jan-2024
11-Jun-2024
31-Dec-2024
Approved
Recommended for further Approval
Approved
approved
View
740
Amethi
Welspun Kaveri Infraprojects JV
20013731
Kundanpur Water Supply Scheme
2
3
2490
2022
2037
2052
10-Apr-2023
01-Oct-2024
01-Oct-2024
25-Aug-2025
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance.
View
741
Meerut
Power Mech Projects Ltd
20010929
KUNEHRA
2
2
3257
2022
2037
2052
31-Dec-2024
15-Sep-2023
02-Feb-2024
16-Sep-2024
Approved
Recommended for further Approvals.
Approved
approved
View
742
Kannauj
GVPR
20036523
KUNWAPUR KASHIDIN & TARIND GRAMIN PEYJAL YOJNA
5
7
4605
2023
2038
2053
08-Sep-2024
13-Apr-2024
16-Jul-2024
17-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
743
Kannauj
GVPR
20067420
KUNWARPUR BANWARI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
4743
2023
2038
2053
16-Aug-2024
13-Apr-2024
16-Jul-2024
17-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
744
Jhansi
Indian Hume Pipe
8010037
Kuraicha GOV
74
74
164050
2023
2038
2053
30-Jun-2022
30-Sep-2024
06-Jan-2025
07-Jan-2025
Approved
checked
Approved
approved
View
745
Meerut
Power Mech Projects Ltd
20011302
KURI KAMALPUR
1
1
1853
2022
2037
2052
31-Dec-2024
02-Feb-2023
20-Jun-2023
26-Dec-2024
Approved
Recommended for further Approval
Approved
approved
View
746
Ayodhya
UNIVERSAL MEP
20031479
KUSHA HARI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
7
3730
2023
2038
2053
12-Oct-2023
30-Jan-2024
30-Jan-2024
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
747
Meerut
Power Mech Projects Ltd
20011235
KUSHAWALI
1
1
5911
2022
2037
2052
31-Dec-2024
20-May-2023
09-Oct-2023
07-Oct-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
748
Sultanpur
UNIVERSAL MEP
20066874
KUTUBPUR & KATKAWLAI GROUP OF GRAM PANCHAYAT WATER SUPPLY SCHEME
5
8
5680
2023
2038
2053
12-Jan-2024
31-Dec-2024
26-Jan-2025
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified, found as per requirements.
View
749
Hardoi
NCC Ltd.
20012318
Kuwa Mau Simrauli
3
4
2480
2022
2037
2052
26-Jul-2023
18-Apr-2023
17-Jul-2023
25-Dec-2024
Approved
ok
Approved
OK
View
750
Kanpur Dehat
GVPR
20070043
laharpur
1
0
1433
2023
2038
2053
11-May-2024
10-Apr-2024
18-Jul-2024
19-Jul-2024
Approved
TKC unable to submit the calibration certificate and other report for O&M, Our letter No.SWSM/BLG/TPI KD/O&M/2025-26/6655 dt.29/07/2028/.
Forward for further action
Approved
All work of scheme found satisfactory
View
751
Ayodhya
UNIVERSAL MEP
20030695
LAHRAPUR & PRANAPUR GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME
2
6
3620
2023
2038
2053
12-Oct-2023
31-Aug-2023
31-Aug-2023
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
752
Farrukhabad
Vindhya-GAJA (JV)
20093157
LAKHAN PUR MVS
1
5
3447
2023
2038
2053
30-May-2025
18-Jan-2024
02-May-2024
03-May-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
753
Ambedkar Nagar
Vindhya-GAJA (JV)
20019925
Lakhanpur
2
3
3830
2023
2038
2053
03-Aug-2023
02-Sep-2024
19-Mar-2025
20-Mar-2025
Approved
Checked and found ok
Approved
Scheme completed
View
754
Fatehpur
Power Mech Projects Ltd
20100810
LAKHMIPUR
1
8
2530
2023
2038
2058
14-Aug-2023
13-Aug-2024
02-Sep-2024
02-Dec-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of September(02.09.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
755
Bijnor
Vindhya-GAJA (JV)
20020666
Lalpur Man Gram Panchayat Water Supply
1
1
3300
2023
2038
2053
06-Jul-2023
30-May-2024
29-Nov-2024
30-Nov-2024
Approved
Every thing completed
Approved
all work completed
View
756
Bahraich
PNC-SPML-JV
20092602
LALPUR PAYAGPUR RETRO PWS
1
5
3588
2022
2037
2052
31-Dec-2025
07-Oct-2025
01-May-2024
08-Oct-2025
Approved
scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/10/0323 kindly complete it.
Approved
SCHEME COMPLETED
View
757
Ayodhya
UNIVERSAL MEP
20030517
LALUWAPUR & KOLVA GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME
5
5
4540
2023
2038
2053
12-Oct-2023
18-Feb-2024
18-Feb-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
758
Kanpur Dehat
GVPR
20077571
LAMHARA NARSOOJHA
2
8
4031
2023
2038
2053
17-Feb-2024
07-Mar-2024
21-Jul-2024
22-Jul-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
759
Kanpur Dehat
GVPR
20077297
Laruapur & Nandpur
4
4
4059
2023
2038
2053
17-Feb-2024
09-Jan-2024
14-Apr-2024
15-Apr-2024
Approved
TKC unable to submit the calibration certificate, our letter SWSM/BLG/TPI KD/O&M/2025-26/6655 dt.29/07/2028/.
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
760
Bijnor
LC INFRA
20017125
Latifpur Bila Ahatmali Water Supply
1
1
3287
2022
2037
2052
02-Nov-2022
07-Dec-2023
05-Jun-2024
06-Jun-2024
Approved
every thing completed
Approved
Everything Completed
View
761
Amethi
Vindhya-GAJA (JV)
20101948
LAUKAPUR WATER SUPPLY SCHEME
1
1
1395
2023
2038
2053
04-Jul-2024
29-Jun-2024
29-Sep-2024
30-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents.
Approved
Hardcopy submitted and found okay as per the submitted documents..
View
762
Mau
LC INFRA
20083037
LAUSHADH VILLAGE WATER SUPPLY SCHEME
1
5
3426
2022
2036
2052
20-Jul-2024
25-Apr-2025
25-Apr-2025
20-Sep-2025
Approved
Approved
Approved
approve
View
763
Ambedkar Nagar
Vindhya-GAJA (JV)
20019923
Lavaiya
1
6
2570
2023
2038
2053
03-Aug-2023
23-Jun-2025
14-Oct-2025
15-Oct-2025
Approved
SCHEME COMPLETED
Approved
Scheme Completed
View
764
Ayodhya
VSA
20098899
Laxmanpur Grant WSS
1
2
660
2023
2038
2053
20-Mar-2024
31-Oct-2024
31-Oct-2024
16-Jan-2025
Approved
FOUND OK
Pending
View
765
Kannauj
GVPR
20050541
LILUIYA GRAM PANCHAYAT WATER SUPPLY SCHEME
1
7
5059
2023
2038
2053
15-Jun-2024
28-Mar-2024
30-Jun-2024
01-Jul-2024
Approved
FORWRADED FOR FURTHER ACTION
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
766
Meerut
Power Mech Projects Ltd
20058233
LOIYA
1
1
5144
2022
2037
2052
14-Aug-2024
15-Feb-2024
07-Jul-2024
08-Jul-2024
Approved
Recommended for further Approvals.
Approved
approved
View
767
Balrampur
Larsen & Toubro Ltd
20016392
Luchuiya water supply scheme
1
5
3269
2022
2037
2052
30-Dec-2024
30-May-2024
30-Aug-2024
01-Sep-2024
Approved
ok
Approved
Ok
View
768
Mau
LC INFRA
20010884
Luduhi G P Water Supply Scheme
2
6
1844
2022
2037
2052
09-Feb-2024
01-Apr-2025
01-Apr-2025
02-Apr-2025
Approved
Approved
Approved
Approved
View
769
Kanpur Dehat
VSA
20095562
Madanpur
2
2
2258
2023
2038
2023
30-Apr-2023
31-Dec-2023
20-Jun-2024
21-Jun-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
770
Bareilly
NCC Ltd.
20014951
Madanpur janubi
2
2
2552
2022
2037
2052
20-Jul-2023
19-Oct-2023
22-Feb-2024
24-Oct-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Mandanpur Janubi scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Pending
View
771
Kanpur Dehat
GVPR
20086507
madarpur gajiuddinpur
1
2
1267
2023
2038
2053
14-Mar-2024
23-Dec-2023
07-May-2024
08-May-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
772
Kannauj
GVPR
20077118
MADARPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
2
2
1605
2023
2038
2053
08-Sep-2024
02-Nov-2024
04-Feb-2025
05-Feb-2025
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
773
Ambedkar Nagar
Vindhya-GAJA (JV)
20033820
Madarpur Water supply scheme
1
2
2650
2023
2038
2053
21-Oct-2023
05-Sep-2024
07-Dec-2024
08-Dec-2024
Approved
Checked and found OK
Approved
Scheme completed
View
774
Fatehpur
Power Mech Projects Ltd
20097522
MADAULI
1
3
2213
2023
2033
2053
13-Aug-2024
30-Jun-2025
13-Mar-2025
14-Mar-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of December(14.12.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
775
Ambedkar Nagar
Vindhya-GAJA (JV)
20026090
MADHOPUR WATER SUPPLY SCHEME
1
3
3800
2023
2038
2053
28-Sep-2023
14-Jun-2024
05-Dec-2024
06-Dec-2024
Approved
Checked and found OK
Approved
SCHEME COMPLETED
View
776
Auraiya
Indian Hume Pipe
8361848
MADHUPUR
1
3
2145
2022
2037
2052
15-Sep-2021
25-Aug-2023
09-Dec-2023
10-Dec-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
777
Fatehpur
Power Mech Projects Ltd
20079124
MADURI
2
3
1850
2023
2038
2053
13-Mar-2024
14-Oct-2024
14-Oct-2024
14-Oct-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of July (15.07.2024).
Approved
Verified
View
778
Meerut
Power Mech Projects Ltd
20010925
MAHADEO
1
1
4377
2022
2037
2052
31-Dec-2024
12-Dec-2023
30-Apr-2024
30-Jan-2025
Approved
Recommended for further Approval
Approved
approved
View
779
Amethi
Gayatri Projects LTD
20034318
Mahaiya Senduriya water supply scheme
1
6
5499
2022
2037
2052
03-May-2024
16-Jun-2024
19-Sep-2024
26-Nov-2024
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
780
Meerut
Power Mech Projects Ltd
20078402
MAHAMUDPUR SHIKHERA
1
1
2184
2023
2038
2053
31-Dec-2024
27-Jul-2024
14-Dec-2024
25-Jan-2025
Approved
Recommended for further Approval
Approved
approved
View
781
Auraiya
GVPR
20099285
Maharajpur Phaphoond PWS
1
1
256
2023
2038
2053
01-Jun-2022
29-Apr-2024
28-Apr-2024
30-Apr-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
782
Fatehpur
Power Mech Projects Ltd
20097523
MAHAWATPUR ASHAT
1
4
2660
2023
2033
2053
14-May-2024
30-Jun-2025
18-Apr-2025
19-Apr-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of January(19.01.2025) and Regular water supply is given to the consumers.
Approved
Verified
View
783
Amethi
Vindhya-GAJA (JV)
20100650
MAHESH PUR WATER SUPPLY SCHEME
1
2
1632
2023
2038
2053
24-Apr-2024
18-Dec-2024
08-Mar-2025
09-Jun-2025
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
View
784
Fatehpur
Power Mech Projects Ltd
20097475
MAHESHPUR
1
1
558
2023
2038
2053
13-Jun-2023
30-Jun-2025
08-Dec-2024
09-Dec-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of September(09.09.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
785
Bijnor
LC INFRA
20075954
Maheswari Village Water Supply
1
3
4960
2022
2037
2052
07-May-2024
07-May-2024
13-Sep-2024
14-Sep-2024
Approved
every thing completed
Approved
Everything Completed
View
786
Sultanpur
UNIVERSAL MEP
20066375
MAHMANDI PUR GRAM PANCHAYAT WATER SUPPLY SCHEME
4
4
2375
2023
2038
2053
12-Jan-2024
12-Jan-2024
30-Jun-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
787
Shahjahanpur
NCC Ltd.
20015060
MAHMOODPUR
2
2
3010
2022
2037
2052
30-Sep-2023
31-Dec-2024
30-Dec-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of MAHMOODPUR scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Mahmoodpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
788
Hardoi
NCC Ltd.
20000034
MAHMOODPUR BAHADURPUR
2
2
1470
2022
2037
2052
26-Jul-2023
11-Sep-2023
09-Dec-2023
30-Nov-2024
Approved
ok
Approved
OK
View
789
Bijnor
LC INFRA
20011718
Mahmoodpur Bikka Village Water Supply Scheme
1
2
1801
2022
2037
2052
10-Nov-2023
12-Dec-2023
10-Jun-2024
11-Jun-2024
Approved
Every thing complete.
Approved
every thing completed
View
790
Ayodhya
UNIVERSAL MEP
20030032
MAHMUD MAU GRAM PANCHAYAT WATER SUPPLY SCHEME
1
5
2779
2023
2038
2053
12-Oct-2023
13-Oct-2023
13-Oct-2023
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
791
Ayodhya
UNIVERSAL MEP
20030266
MAHOLI UPARHAR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
7
5450
2023
2038
2053
12-Oct-2023
16-Jun-2024
16-Jun-2024
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
792
Meerut
Power Mech Projects Ltd
8362865
MAHROLI
1
1
3061
2022
2037
2052
31-Dec-2024
19-Dec-2022
08-May-2023
26-Dec-2024
Approved
Recommended for further Approval
Approved
approved
View
793
Kannauj
GVPR
20077096
MAHSAIYAN GRAM PANCHAYAT WATER SUPPLY SCHEME
1
4
3507
2023
2038
2053
09-Aug-2024
10-Nov-2024
14-Feb-2025
15-Feb-2025
Approved
forwarded for Further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
794
Auraiya
GVPR
20088637
Mahu PWS
1
4
2128
2023
2038
2053
06-Jan-2022
23-Apr-2024
07-Jun-2024
24-Apr-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
795
Kanpur Dehat
GVPR
20065228
MAHUA & MURRA
3
0
4094
2023
2038
2053
18-Jan-2024
20-Oct-2023
06-Mar-2024
07-Mar-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
796
Shahjahanpur
NCC Ltd.
20014003
Mahua durg W/s
1
1
2800
2022
2037
2052
09-Aug-2023
31-Dec-2024
08-Nov-2023
16-Nov-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Mahau Durgu scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Mahau Durgu scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
797
Kanpur Dehat
GVPR
20077550
MAIJUSA MASPUR
2
5
2022
2023
2038
2053
17-Feb-2024
17-Dec-2023
01-May-2024
02-May-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
798
Meerut
Power Mech Projects Ltd
20011056
MAIL PWS
1
1
6256
2022
2037
2052
31-Dec-2024
25-Jun-2024
11-Nov-2024
17-Feb-2025
Approved
Recommended for Further Approval
Approved
approved
View
799
Mau
LC INFRA
20077595
Majhauli Gram Panchayat Water supply Scheme
3
5
2120
2022
2037
2052
29-Jun-2024
04-Apr-2025
03-Apr-2025
04-Apr-2025
Approved
Approved.
Approved
Approved..
View
800
Sultanpur
UNIVERSAL MEP
20064712
MAJHNA GRAM PANCHAYAT WATER SUPPLY SCHEME
1
14
4050
2023
2038
2053
12-Jan-2024
12-Jan-2024
12-Feb-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
801
Kannauj
GVPR
20066565
MAJHO PUR & DAULTABAD GRAM PANCHAYAT WATER SUPPLY SCHEME
5
9
4225
2023
2038
2053
16-Aug-2024
22-Apr-2025
26-Jul-2024
27-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
802
Ayodhya
UNIVERSAL MEP
20030304
MAJNAWA GRAM PANCHAYAT WATER SUPPLY SCHEME
1
4
5210
2023
2038
2053
12-Oct-2023
13-Jan-2024
13-Jan-2024
01-Feb-2025
Approved
FOUND OK
Pending
View
803
Bahraich
PNC-SPML-JV
20020698
MAKANPUR NAWABGANJ PWS
1
4
7600
2022
2037
2052
31-Dec-2025
13-Oct-2025
13-Oct-2025
14-Oct-2025
Approved
Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/11/0062, kindly complete it.
Pending
View
804
Ambedkar Nagar
Vindhya-GAJA (JV)
20067758
MAKDOOMPUR Water Supply Scheme
2
3
5280
2023
2038
2053
23-Mar-2024
19-May-2025
19-May-2025
20-May-2025
Approved
Checked and found ok
Approved
Scheme completed
View
805
Hardoi
NCC Ltd.
20012175
MAKHADUM PURA
2
2
2240
2022
2037
2052
14-Jun-2023
31-Jan-2023
22-Apr-2023
25-Dec-2024
Approved
Approved
Approved
OK
View
806
Kanpur Dehat
GVPR
20053260
Makrandpur Kahinjari
1
2
3529
2023
2038
2053
18-Nov-2023
10-Oct-2023
12-Jan-2024
13-Jan-2024
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
807
Kanpur Dehat
GVPR
20077274
Makrandpur Mazra
2
2
1747
2023
2038
2053
17-Feb-2024
20-Dec-2023
29-Mar-2024
30-Mar-2024
Approved
TKC unable to submit the calibration certificate and other report for O&M, Our letter No.SWSM/BLG/TPI KD/O&M/2025-26/6655 dt.29/07/2028 & SWSM/BLG/TPI/KD/O&M/2025-26/6657 DT.30.07.2025. we can go to O&M through conditional, TKC submit the require document within 15 day's.
Approved
All work of scheme found satisfactory
View
808
Kannauj
GVPR
20077102
MALGAWAN GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
3349
2023
2038
2053
08-Sep-2024
04-Apr-2024
07-Jul-2024
08-Jul-2024
Approved
Forwarded for further action.
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
809
Auraiya
Indian Hume Pipe
20019892
MALHEPUR PWS
2
3
2700
2022
2037
2052
22-Sep-2023
28-Dec-2022
04-Apr-2023
05-Apr-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
810
Shahjahanpur
NCC Ltd.
20096494
MALUAPUR GRAM PANCHAYAT VILLAGE WATER SUPPLY SCHEME
1
2
3230
2022
2037
2052
19-Aug-2024
21-Dec-2024
18-Nov-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Maluapur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Malupur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
811
Bijnor
LC INFRA
8360682
MANDAURA VILLAGE WATER SCHEME
3
3
3411
2022
2037
2052
26-Jul-2023
11-Dec-2023
09-Jun-2024
10-Jun-2024
Approved
Every thing completed.
Approved
Everything Complete.
View
812
Bijnor
LC INFRA
20019956
Mandora VIP Water Supply Scheme
1
1
3141
2022
2037
2052
09-Feb-2022
21-Dec-2024
22-Mar-2025
23-Mar-2025
Approved
Every thing complete.
Approved
Everything is Completed.
View
813
Meerut
Power Mech Projects Ltd
20011300
MANDWARI
1
1
2203
2022
2037
2052
31-Dec-2024
10-Jan-2023
29-May-2023
30-Dec-2024
Approved
Recommended for further Approval
Approved
approved
View
814
Gautam Buddha Nagar
LC INFRA
8389573
MANGROLI GRAM PANCHAYAT WATER SUPPLY
1
1
2939
2022
2037
2052
20-Mar-2023
31-Mar-2024
31-Oct-2024
01-Nov-2024
Approved
Project certificate is verified
Approved
Verified
View
815
Etawah
Indian Hume Pipe
20015035
Mangupur
4
10
3550
2022
2037
2052
08-May-2023
20-May-2024
02-Jul-2024
03-Jul-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory
View
816
Kannauj
GVPR
20050538
MANIKAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
6
4048
2023
2038
2053
15-Jun-2024
07-Apr-2024
11-Jul-2024
12-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
817
Amethi
Vindhya-GAJA (JV)
20066548
MANJH GAON WATER SUPPLY SCHEME
1
6
2534
2023
2038
2053
07-Jan-2024
12-May-2024
04-Sep-2024
16-Dec-2024
Approved
Hardcopy submitted
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
818
Fatehpur
Power Mech Projects Ltd
20102043
MANJHANPUR
1
1
2390
2023
2038
2053
20-Sep-2024
25-Apr-2025
24-Apr-2025
25-Apr-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of January (21.01.2025) and Regular water supply is given to the consumers.
Approved
Verified
View
819
Ayodhya
UNIVERSAL MEP
20031495
MANJHANPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
3
4
3250
2023
2038
2053
12-Oct-2023
30-Dec-2023
30-Dec-2023
30-Nov-2024
Approved
FOUND OK
Pending
View
820
Kanpur Dehat
GVPR
20077572
mankapur derapur
2
3
2100
2023
2038
2053
14-Mar-2024
02-Feb-2024
08-May-2024
09-May-2025
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
821
Shahjahanpur
NCC Ltd.
20014021
MANORATHPUR SAH SOWARI
1
1
2350
2022
2037
2052
17-Jul-2024
31-Dec-2024
16-Oct-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Manorathpur Sah Sowari scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Manorathpur Shah Sowari scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
822
Kanpur Dehat
GVPR
20053677
MANPUR GAJEN1
2
1
2515
2023
2038
2053
18-Nov-2023
10-Dec-2023
11-Mar-2024
11-Mar-2024
Approved
Forwarded for Further action.
Approved
All work of scheme found satisfactory
View
823
Meerut
Power Mech Projects Ltd
20102362
Mansabgarh
1
1
650
2023
2038
2053
11-Jun-2025
14-Sep-2024
31-Jan-2025
01-May-2025
Approved
Recommended for further Approval
Approved
approved
View
824
Mau
GA INFRA-VPL
20088192
MANSDI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
5
2120
2023
2038
2038
21-Mar-2025
21-Mar-2025
20-Mar-2025
21-Mar-2025
Approved
Approved
Approved
Approved
View
825
Auraiya
GVPR
20093417
Mansukhpur & Kasbajana
1
7
6150
2023
2038
2053
01-Jun-2022
17-Apr-2025
16-Apr-2025
18-Apr-2025
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
826
Shahjahanpur
NCC Ltd.
20015096
Mareena
1
1
2420
2022
2037
2052
30-Sep-2023
31-Dec-2024
30-Dec-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Mareena scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Mareena scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
827
Kannauj
GVPR
20036485
MARHI & BAJHERI GRAMIN PEYJAL YOJNA
2
9
3871
2023
2038
2053
13-May-2024
16-Mar-2024
19-Jun-2024
20-Jun-2024
Approved
Forwarded for further action.
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
828
Ghaziabad
LC INFRA
20021146
MASAUTA PWS SCHEME
1
1
3843
2022
2037
2052
21-Mar-2022
31-Oct-2024
28-Feb-2025
01-Mar-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
Approved
View
829
Hardoi
NCC Ltd.
20012541
MASFANA JJM
2
2
1500
2022
2037
2052
26-Jul-2023
01-Oct-2023
02-Jan-2024
30-Nov-2024
Approved
ok
Approved
OK
View
830
Ayodhya
UNIVERSAL MEP
20058296
MATAULI WSS
3
5
3450
2023
2038
2053
19-Mar-2024
03-Jun-2024
03-Jun-2024
01-Feb-2025
Approved
FOUND OK
Pending
View
831
Ghaziabad
LC INFRA
20094905
MATAUR VILLAGE WATER SUPPLY SCHEME
1
1
2329
2022
2037
2052
31-Oct-2024
01-Dec-2024
27-Mar-2025
01-Apr-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
aprroved
View
832
Ambedkar Nagar
Vindhya-GAJA (JV)
20035086
MATHIYA WSS
1
8
6150
2023
2037
2053
21-Oct-2023
14-Jun-2024
02-Dec-2024
03-Dec-2024
Approved
Checked and found ok
Approved
SCHEME COMPLETED
View
833
Jaunpur
AFCONS
20074092
MATHURAPUR URF KOTWA VILLAGE WATER SUPPLY SCHEME
1
6
2881
2023
2038
2053
21-Feb-2024
15-Apr-2024
09-Mar-2025
10-Mar-2025
Approved
Checked and found ok.
Approved
ok
View
834
Ghaziabad
LC INFRA
20094912
MATIALA VILLAGE WATER SUPPLY SCHEME
1
1
2130
2022
2033
2052
30-Sep-2024
30-Nov-2024
01-Apr-2025
05-Apr-2025
Approved
All Civil and mechanical works are completed.
Approved
All work completed
View
835
Auraiya
Indian Hume Pipe
8362646
MAU
1
2
3335
2022
2037
2052
14-Sep-2022
03-Aug-2023
04-Nov-2023
05-Nov-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
836
Auraiya
GVPR
20101891
Mau(khidarpur)PWS
1
4
556
2023
2038
2053
06-Jan-2022
03-Oct-2024
02-Oct-2024
04-Oct-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
837
Kanpur Dehat
Indian Hume Pipe
20025480
Maujpur
1
2
2350
2022
2037
2052
24-Aug-2022
31-Dec-2024
31-Jan-2024
01-Feb-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
838
Kannauj
GVPR
20077114
MAUMARPUR MAURARA & RAMPUR MAJAR GANGADARAPOUR GRAM PANCHAYAT WATER SUPPLY SCHEME
3
4
4777
2023
2038
2053
08-Sep-2024
10-Apr-2024
13-Jul-2024
14-Jul-2024
Approved
forwarded for futrher action
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
839
Kanpur Dehat
Indian Hume Pipe
20034274
MAVAIYA
1
3
1900
2022
2037
2052
23-Nov-2023
31-Dec-2024
31-Dec-2024
01-Jan-2025
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
840
Meerut
Power Mech Projects Ltd
20020840
MAVIMIRA
2
2
4819
2022
2038
2052
31-Dec-2024
10-Jul-2024
26-Nov-2024
27-Nov-2024
Approved
CHECKED AND VERIFIED....
Approved
approved
View
841
Amethi
Gayatri Projects LTD
20098295
MAWAIYA RAHMAT GARH WATER SUPPLY SCHEME
1
11
9186
2022
2037
2052
27-Jun-2025
10-Jun-2024
11-Sep-2024
15-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
Hardcopy submitted and found okay as per the submitted documents..
View
842
Amethi
Gayatri Projects LTD
20077657
Mayas & Nimi Water Supply Scheme
2
10
4230
2022
2037
2057
10-Aug-2024
27-Jun-2024
29-Sep-2024
18-Dec-2024
Approved
All Document not provided by EPC hence returns to the EPC
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance...
View
843
Ambedkar Nagar
Vindhya-GAJA (JV)
20019936
Mdarbhari
2
6
5550
2023
2038
2053
03-Aug-2023
20-Dec-2024
20-Mar-2025
21-Mar-2025
Approved
checked and found ok
Approved
Scheme completed
View
844
Ambedkar Nagar
Vindhya-GAJA (JV)
20019789
Medhi Sulempur
3
6
4800
2023
2038
2053
03-Aug-2023
10-Sep-2024
19-Mar-2025
20-Mar-2025
Approved
checked and verified and found OK
Approved
Scheme completed
View
845
Meerut
Power Mech Projects Ltd
8362147
MEDPUR
1
1
5094
2022
2037
2052
31-Dec-2024
18-Dec-2022
07-May-2023
07-Oct-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
846
Etawah
Indian Hume Pipe
20014159
Meerakhpur
1
5
2165
2022
2037
2052
12-Oct-2022
24-Dec-2023
31-Mar-2024
01-Apr-2024
Approved
Forwarded for further action.
Approved
All works are satisfactory.
View
847
Kannauj
GVPR
20067636
MEERPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
1535
2024
2038
2053
16-Aug-2024
20-Mar-2024
22-Jun-2023
23-Jun-2023
Approved
FORWARDED FOR FURTHER ACTION.
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance
View
848
Farrukhabad
Vindhya-GAJA (JV)
20093150
MEERPUR KAMRUDIN NAGAR MVS
2
2
2028
2023
2038
2053
31-Mar-2025
16-Jan-2025
30-Apr-2025
13-May-2025
Approved
All the parameters of scheme verified can take in O&M
Approved
ok
View
849
Meerut
Power Mech Projects Ltd
20037228
MEGHRAJPUR
1
1
2483
2022
2037
2052
31-Dec-2024
12-Feb-2024
02-Jul-2024
04-Dec-2024
Approved
Recommended for further approval
Approved
approved
View
850
Meerut
Power Mech Projects Ltd
20067081
MEHARMATI GANESHPUR
1
1
3517
2023
2038
2053
31-Dec-2024
22-Mar-2024
07-Aug-2024
01-Feb-2025
Approved
Recommended for further Approval
Approved
approved
View
851
Bijnor
Vindhya-GAJA (JV)
20025521
Mehbulla Pur Dhaki Gram Panchayat Water Supply
3
3
3096
2023
2038
2053
06-Jul-2023
19-Apr-2024
19-Oct-2024
20-Oct-2024
Approved
Every thing complete
Approved
Everything Complete
View
852
Meerut
Power Mech Projects Ltd
20058412
MEHMUDPUR SHERKI & MEHMUDPUR GAWRI
2
2
2292
2023
2038
2053
31-Dec-2024
19-Feb-2024
06-Jul-2024
02-Jan-2025
Approved
Recommended for further Approval
Approved
approved
View
853
Ambedkar Nagar
Vindhya-GAJA (JV)
20041720
MIJHAURA WSS
1
1
7250
2023
2038
2053
23-Nov-2023
23-Jun-2025
08-Jul-2025
08-Jul-2025
Approved
Approved Checked and found ok
Approved
CHECKED AND FOUND OK
View
854
Farrukhabad
Vindhya-GAJA (JV)
20091277
MILIK MAJMULLA MVS
2
3
2174
2023
2038
2053
31-Mar-2025
30-Dec-2024
11-Mar-2025
12-Mar-2025
Approved
Ok
Approved
OK
View
855
Ayodhya
UNIVERSAL MEP
20030546
MINAPUR FAGAULI & FAGOLI KUARMIYAN GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME
4
7
6690
2023
2038
2053
12-Oct-2023
24-Nov-2023
24-Nov-2023
30-Nov-2024
Approved
FOUND OK
Pending
View
856
Meerut
Power Mech Projects Ltd
20011109
MIRPUR
3
3
4567
2022
2037
2052
31-Dec-2024
10-Nov-2023
30-Mar-2024
10-Nov-2024
Approved
CHECKED AND VERIFIED....
Approved
approved
View
857
Auraiya
GVPR
20099292
Mirzapur Bairamshah
1
1
468
2023
2038
2053
01-Jun-2024
31-Jul-2025
30-Jul-2025
01-Aug-2025
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
858
Bijnor
Vindhya-GAJA (JV)
20022098
Mirzapur Dhikli Gram Panchayat Water Supply
2
2
3491
2022
2037
2057
06-Jul-2023
21-Nov-2023
30-May-2024
01-Jun-2024
Approved
every thing completed.
Approved
Everything Completed
View
859
Fatehpur
Power Mech Projects Ltd
20097490
MISA
1
1
2420
2023
2038
2053
20-Sep-2024
24-Mar-2025
23-Mar-2025
24-Mar-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of December (24.12.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
860
Ghaziabad
LC INFRA
20102069
MISBAPUR VILLAGE WATER SUPPLY SCHEME
1
1
714
2022
2037
2052
31-May-2023
01-Dec-2024
27-Mar-2025
01-Apr-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
Approved
View
861
Ayodhya
UNIVERSAL MEP
20030466
MISSA GRAM PANCHAYAT WATER SUPPLY SCHEME
2
8
5220
2023
2038
2053
12-Oct-2023
20-Oct-2023
20-Oct-2023
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
862
Meerut
Power Mech Projects Ltd
20037221
MITHEPUR
1
1
3504
2022
2037
2052
31-Dec-2024
03-Feb-2024
21-Jun-2024
10-Dec-2024
Approved
Recommended for further approval
Approved
approved
View
863
Kannauj
GVPR
20100931
MITRASENPUR GRAMM PANCHAYAT WATER SUPPLY SCHEME
1
1
1259
2023
2038
2053
14-Nov-2024
03-May-2024
07-Aug-2024
08-Aug-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
864
Kannauj
GVPR
20066515
MIYA GANJ GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
4177
2023
2038
2053
16-Aug-2024
31-Mar-2024
07-Mar-2024
07-Apr-2024
Approved
FORWARDED FOR FURTHER ACTION
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
865
Shahjahanpur
NCC Ltd.
20015542
Miyuna sww
1
2
2960
2022
2037
2052
31-Dec-2024
04-Jan-2024
04-Apr-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Miyuna scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Miyuna scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
866
Etawah
Indian Hume Pipe
20022015
Mohabbatpurnagla Bhagat PWS
1
1
2245
2022
2037
2052
22-Sep-2023
11-Oct-2023
25-Jan-2024
24-Apr-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory
View
867
Shahjahanpur
NCC Ltd.
20015943
MOHAMADPUR GULERIYA
1
3
2730
2022
2037
2052
30-Sep-2023
31-Dec-2024
30-Dec-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of MOHAMADPUR GULERIYA scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Mohammadpur Guleriya scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
868
Bahraich
PNC-SPML-JV
20099559
MOHAMMAD NAGAR CHITTAURA RF MVS PWS
2
16
9780
2022
2037
2052
30-Jun-2025
10-Jun-2025
10-Jun-2025
11-Jun-2025
Approved
scheme complete
Approved
Scheme completed.
View
869
Meerut
Power Mech Projects Ltd
20078443
MOHAMMADPUR AKBARPUR CHAKBANDI
1
1
1380
2022
2037
2052
31-Dec-2024
16-Jun-2024
01-Nov-2024
02-Nov-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
870
Ghaziabad
LC INFRA
20097918
MOHAMMADPUR AMAD BAGHPAT VILLAGE WATER SUPPLY SCHEME
1
1
1779
2022
2037
2052
31-Oct-2024
01-Dec-2024
27-Mar-2025
01-Apr-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
all work has been completed
View
871
Meerut
Power Mech Projects Ltd
20037267
MOHANIPUR BHAROTA
2
2
2445
2022
2037
2052
31-Dec-2024
03-Apr-2024
20-Aug-2024
31-Jan-2025
Approved
Recommended for further Approval
Approved
approved
View
872
Shahjahanpur
NCC Ltd.
20016423
MOHANPUR KALUAPUR
2
3
1850
2022
2037
2052
31-Dec-2024
30-Sep-2023
30-Dec-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Mohanpur Kaluapur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of MOHANPUR KALUAPUR scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
873
Gautam Buddha Nagar
LC INFRA
20017819
MOHBALIPUR VILLAGE WATER SUPPLY SCHEME
1
1
1663
2022
2037
2052
20-Mar-2023
30-Mar-2024
30-Mar-2024
01-Apr-2024
Approved
Project certificate is verified.
Approved
Verified
View
874
Meerut
Power Mech Projects Ltd
20100955
MOHD.PUR GUMI
1
1
812
2023
2038
2053
31-Dec-2024
08-May-2024
03-Oct-2024
02-Jan-2025
Approved
Recommended for further Approval
Approved
approved
View
875
Meerut
Power Mech Projects Ltd
20011061
MOHDPUR DHUMI
1
1
3565
2022
2037
2052
31-Dec-2024
17-May-2023
03-Oct-2023
06-Nov-2024
Approved
Recommended for further Approvals.
Approved
approved
View
876
Ghaziabad
LC INFRA
20019990
MOHHAMADPUR HISAULI PWS SCHEME
1
1
3061
2022
2037
2052
01-Feb-2024
31-Dec-2024
31-Jan-2025
01-Feb-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
All work checked and recommended for O&M
View
877
Meerut
Power Mech Projects Ltd
20016932
MOHIUDDINPUR LALSANA
1
1
2029
2022
2037
2052
07-Mar-2023
27-Dec-2022
16-May-2023
18-Dec-2024
Approved
Recommended for further Approval
Approved
approved
View
878
Bijnor
LC INFRA
20013270
MOHMADPUR SADA BILA AHATMALI WATER SUPPLY SCHEME
2
2
3051
2022
2037
2052
10-Feb-2024
12-Dec-2023
10-Jun-2024
11-Jun-2024
Approved
Every thing complete.
Approved
Everything is Completed.
View
879
Bijnor
LC INFRA
20051622
MOHRA
1
1
2517
2022
2037
2052
03-Dec-2022
05-Jul-2024
13-Jan-2025
14-Jan-2025
Approved
Every thing complete
Approved
Everything is Completed.
View
880
Meerut
Power Mech Projects Ltd
20082564
MOR KHURD & SADARPUR
2
2
6615
2023
2038
2053
31-Dec-2024
05-Sep-2024
22-Jan-2025
23-Jan-2025
Approved
Recommended for further Approval
Approved
Approved
View
881
Ambedkar Nagar
Vindhya-GAJA (JV)
20047599
MUBARAKPUR MARAILA Water Supply Scheme
2
2
2190
2023
2038
2053
24-Nov-2023
21-Sep-2024
20-Dec-2024
21-Dec-2024
Approved
checked and verified
Approved
SCHEME COMPLETED
View
882
Shahjahanpur
NCC Ltd.
20096501
MUDIA KALAN GRAM PANCHAYAT I VILLAGE WATER SUPPLY SCHEME
1
2
1840
2022
2037
2052
17-Aug-2024
31-Dec-2024
16-Nov-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Mudia Kalan scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Mudiya Kalan scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
883
Kannauj
GVPR
20036136
MUGARA GRAMIN PEYJAL YOJNA
1
5
2707
2023
2038
2053
13-May-2024
07-Apr-2024
11-Jul-2024
12-Jul-2024
Approved
FORWARDED FOR FURTHER ACTION.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
884
Auraiya
GVPR
20041745
Mughariha&belhupur PWS
2
1
3645
2023
2038
2053
26-Nov-2024
02-Nov-2023
10-Jul-2023
26-Aug-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
885
Muzaffarnagar
Gayatri Projects LTD
20022187
Muhammadpur Rai Singh
1
1
5710
2022
2037
2052
16-Sep-2022
08-Dec-2023
10-Mar-2024
11-Mar-2024
Approved
The details given by the contractor are correct at the time of approval.
Pending
View
886
Ambedkar Nagar
Vindhya-GAJA (JV)
20019657
Mujahidpur
1
5
2790
2023
2038
2053
03-Aug-2023
07-Sep-2024
09-Dec-2024
10-Dec-2024
Approved
Checked and found OK
Approved
Scheme completed
View
887
Meerut
Power Mech Projects Ltd
20098584
MUKHTYARPUR NAGLA
1
1
1601
2022
2037
2052
11-Jun-2025
25-Sep-2024
11-Feb-2025
13-Feb-2025
Approved
Recommended for further Approvals.
Approved
approved
View
888
Kanpur Dehat
GVPR
20053394
MULHI
2
2
2588
2023
2038
2053
18-Nov-2023
27-Jan-2024
14-May-2024
15-May-2024
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
889
Shahjahanpur
NCC Ltd.
20015940
munavwar ganj urf barenda WSS
1
4
4620
2022
2037
2052
30-Sep-2023
31-Dec-2024
30-Dec-2023
16-Nov-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Munavwar Ganj Urf Barenda scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Munawarganj urf barenda scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
890
Muzaffarnagar
Gayatri Projects LTD
20022918
MUNDBHAR RO WSS
1
2
5545
2022
2037
2052
16-Sep-2022
03-Jun-2024
03-Sep-2024
04-Sep-2024
Approved
The details given by the contractor are correct at the time of approval.
Pending
View
891
Muzaffarnagar
Gayatri Projects LTD
20023355
MUNDBHAR RO WSS (BHORA KHURD WSS)
1
4
4439
2022
2037
2052
16-Sep-2022
29-Jan-2024
29-Apr-2024
30-Apr-2024
Approved
The details given by the contractor are correct at the time of approval.
Pending
View
892
Kanpur Dehat
GVPR
20052993
Mundera kinnar singh
2
3
4554
2023
2038
2053
18-Nov-2023
12-Dec-2023
12-Mar-2024
13-Mar-2024
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
893
Shahjahanpur
NCC Ltd.
20033494
Mundiya Aas
1
2
2310
2022
2037
2052
30-Sep-2023
31-Dec-2024
30-Dec-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Mundiya Aas scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Mundiya Aas scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
894
Mau
LC INFRA
20085354
MUNJDAND PANCHAYAT WATER SUPPLY SCHEME
3
5
1421
2022
2037
2052
22-Mar-2025
02-Apr-2025
02-Apr-2025
02-Apr-2025
Approved
Approve.
Approved
Approved.
View
895
Ghaziabad
LC INFRA
20070218
Muradabad Village Water Supply Scheme
1
1
3536
2022
2037
2052
01-Jul-2024
31-Dec-2024
30-Apr-2025
01-May-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
All work completed and approved
View
896
Ghaziabad
LC INFRA
20102064
MURADGAM PUR PURSI VILLAGE WATER SUPPLY SCHEME
1
1
9763
2022
2037
2052
31-May-2023
01-Nov-2024
30-Apr-2025
01-May-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
All work completed
View
897
Farrukhabad
Vindhya-GAJA (JV)
20080821
MURAITHI SVS
1
1
3388
2023
2038
2053
30-May-2025
26-Jan-2024
10-May-2024
11-May-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
898
Farrukhabad
Vindhya-GAJA (JV)
20091736
MURAN & NAGLA SOODAN MVS
2
2
3391
2023
2038
2053
30-May-2025
09-Feb-2024
24-May-2024
25-May-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
899
Mau
GA INFRA-VPL
20088206
MURARPUR GRAM PANCHAYAT WATER VSUPPLY SCHEME
4
10
2170
2023
2038
2053
30-Nov-2024
15-Jan-2025
15-Jan-2025
16-Jan-2025
Approved
Approved
Approved
Approved
View
900
Shahjahanpur
NCC Ltd.
8361721
MURHA HARIS GRAM PANCHAYAT VILLAGE WATER SUPPLY SCHEME
1
1
2260
2022
2037
2052
09-Aug-2023
31-Dec-2024
08-Nov-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Murha Haris scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Murha Haris scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
901
Meerut
Power Mech Projects Ltd
20098087
MURLIPUR PHOOL
1
1
4505
2023
2038
2053
11-Jun-2025
15-Oct-2024
05-Mar-2025
06-Mar-2025
Approved
Recommended for further Approvals.
Approved
Approved
View
902
Kannauj
GVPR
20067358
MURRA & BAUSIA GRAM PANCHAYAT WATER SUPPLY SCHEME
2
4
3816
2023
2038
2053
16-Aug-2024
20-Mar-2024
22-Jun-2024
23-Jun-2024
Approved
Forwarded for further action.
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
903
Azamgarh
LC INFRA
20025166
Mustafabad Khas Rural Bad Water Supply Scheme
1
2
5115
2022
2037
2052
21-Mar-2023
15-Mar-2024
16-Jun-2024
17-Jun-2024
Approved
OK
Approved
OK
View
904
Bijnor
LC INFRA
20019392
Mustfapuransu Water Supply
1
1
1203
2022
2037
2052
10-Feb-2022
21-Apr-2024
23-Oct-2024
24-Oct-2024
Approved
Every thing completed.
Approved
All Documents checked and verified
View
905
Bijnor
LC INFRA
20019982
Muswi Khan pur Water Supply Scheme
1
3
1544
2022
2037
2052
10-Feb-2024
05-Apr-2024
14-Oct-2024
15-Oct-2024
Approved
every thing completed
Approved
Everything Completed
View
906
Amethi
Gayatri Projects LTD
20076489
NABHANPUR WATER SUPPLY SCHEME
2
7
3007
2022
2037
2052
14-Mar-2025
15-Jun-2024
19-Sep-2024
25-Dec-2024
Approved
Hardcopy submiited and all documents found okay..
Pending
View
907
Shahjahanpur
NCC Ltd.
20015102
NADIAYA RAMPUR Jatipur W/s
1
1
2210
2022
2037
2052
30-Sep-2023
31-Dec-2024
30-Dec-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Nadiaya Rampur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of NADIAYA RAMPUR Jatipur W/s scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
908
Amethi
Gayatri Projects LTD
20101996
NADIWAN WATER SUPPLY SCHEME
1
13
3024
2022
2037
2052
27-Jun-2025
07-Sep-2024
13-Dec-2024
15-Mar-2025
Approved
Hardcopy submitted and found okay as per the submitted documents.
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance...
View
909
Gautam Buddha Nagar
LC INFRA
20102367
NAGALA CHITI VILLAGE WATER SUPPLY SCHEME
1
1
665
2022
2037
2052
07-Feb-2024
01-Oct-2024
01-Jul-2024
01-Oct-2024
Approved
Project certificate is verified
Pending
View
910
Kannauj
GVPR
20036635
NAGALA KHEM KARAN & DILWARPUR GRAMIN PEYJAL YOJNA
2
2
3754
2023
2038
2053
13-May-2024
13-Apr-2024
16-Jul-2024
17-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
911
Etawah
Indian Hume Pipe
20025932
Nagari PWS
1
3
1470
2022
2037
2052
22-Sep-2023
16-Mar-2023
19-Jun-2023
20-Jun-2023
Approved
Dear Sir, the above data has been verified and forwarded to you for further action.
Approved
All work of scheme found satisfactory
View
912
Shahjahanpur
NCC Ltd.
20015211
NAGARIYA BUZURG
1
1
1650
2022
2037
2052
19-Dec-2023
31-Dec-2024
19-Mar-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Nagariya Bujurg have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Nagariya Bujurg scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
913
Farrukhabad
Vindhya-GAJA (JV)
20075132
NAGARIYA GHALBARAN MVS
6
6
4265
2023
2038
2053
30-May-2025
03-Apr-2024
03-Apr-2024
04-Apr-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
914
Gautam Buddha Nagar
LC INFRA
8389561
Nagla chamrooo
1
1
2162
2022
2037
2052
20-Mar-2023
31-Oct-2024
28-Feb-2025
01-Mar-2025
Approved
Project certificate is verified.
Approved
Verified
View
915
Hardoi
NCC Ltd.
20012361
Nagla Kallu
3
4
2130
2021
2037
2052
28-Jul-2023
30-Oct-2023
31-Jan-2024
30-Nov-2024
Approved
ok
Approved
OK
View
916
Farrukhabad
Vindhya-GAJA (JV)
20076912
NAGLA KHEM RANGAI SVS
1
10
3083
2023
2038
2053
30-May-2025
26-Mar-2024
09-Jul-2024
10-Jul-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
917
Meerut
Power Mech Projects Ltd
20077314
NAGLA ORDER
1
1
4216
2022
2037
2052
31-Dec-2024
07-Aug-2024
20-Jan-2025
21-Jan-2025
Approved
Recommended for further Approvals.
Approved
Approved
View
918
Meerut
Power Mech Projects Ltd
20031856
NAGLA PATU - KHANPUR
2
2
2617
2023
2038
2053
31-Dec-2024
10-Mar-2024
27-Jul-2024
21-Jan-2025
Approved
Recommended for further Approval
Approved
approved
View
919
Auraiya
GVPR
20065298
Nagla simar PWS
1
2
1997
2023
2038
2053
01-Jun-2024
16-Jun-2024
15-Jun-2024
17-Jun-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
920
Etawah
Indian Hume Pipe
20014151
Nagla Sukul
3
3
2070
2022
2037
2052
12-Sep-2022
14-Aug-2023
15-Jan-2024
14-Apr-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory
View
921
Bijnor
LC INFRA
20017102
Naglan Nensi Bila Ahatmali water Supply
1
1
2081
2022
2037
2052
02-Nov-2023
22-Nov-2023
26-May-2024
27-May-2024
Approved
every thing completed.
Approved
Everything Completed
View
922
Meerut
Power Mech Projects Ltd
20020264
NAGLI AZAMABAD
1
1
1922
2022
2037
2052
31-Dec-2024
08-Mar-2024
15-Jun-2024
14-Nov-2024
Approved
Recommended for further Approvals.
Approved
approved
View
923
Meerut
Power Mech Projects Ltd
20098086
NAGLI KITHAUR
1
1
3855
2023
2038
2053
11-Jun-2025
12-Sep-2024
29-Jan-2025
30-Jan-2025
Approved
Recommended for further Approvals.
Approved
Approved
View
924
Meerut
Power Mech Projects Ltd
20076726
NAGLI SADHARAN
1
1
2952
2022
2037
2052
31-Dec-2024
20-Nov-2024
08-Apr-2025
10-Apr-2025
Approved
Recommended for further Approval
Approved
approved
View
925
Kanpur Dehat
GVPR
20086502
Nahili
1
5
1979
2023
2038
2053
14-Mar-2024
31-Jul-2024
14-Dec-2024
15-Dec-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
926
Meerut
Power Mech Projects Ltd
20069024
NAIDU & NAGLA KATAR
2
2
4526
2022
2038
2052
31-Dec-2024
11-Mar-2024
30-Jul-2024
01-Feb-2025
Approved
Recommended for further Approval
Approved
approved
View
927
Bahraich
PNC-SPML-JV
20018643
NAKWA MAHASI PWS
1
2
3588
2022
2037
2052
31-Dec-2025
17-Oct-2025
17-Oct-2025
18-Oct-2025
Approved
Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/10/0501, kindly complete it.
Pending
View
928
Auraiya
Indian Hume Pipe
8360956
Nalhupur, Bhagua
2
8
2575
2022
2037
2052
15-Sep-2022
28-May-2023
02-Dec-2023
03-Dec-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
929
Meerut
Power Mech Projects Ltd
20011006
NALPUR
1
1
3728
2022
2037
2052
31-Dec-2024
16-Sep-2023
03-Feb-2024
02-Mar-2025
Approved
Recommended for further Approval
Approved
approved
View
930
Bijnor
LC INFRA
8360402
NALPURA VILLAGE WATER SCHEME
1
1
1950
2022
2037
2052
30-Sep-2023
12-Dec-2023
10-Jun-2024
11-Jun-2024
Approved
Every thing completed.
Approved
Everything Complete.
View
931
Kannauj
GVPR
20066445
NANDLALPUR & GHILOY KHAS GRAM PANCHAYAT WATER SUPPLY SCHEME
3
3
2061
2023
2038
2053
16-Aug-2024
07-Apr-2024
11-Jul-2024
12-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
932
Bijnor
LC INFRA
20075930
NANGLA GANNA WATER SUPPLY SCHEME
1
1
2375
2022
2037
2052
31-Dec-2024
28-Jan-2024
03-Aug-2024
04-Aug-2024
Approved
every thing completed
Approved
Compeleted
View
933
Kannauj
GVPR
20077123
NANHEPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
2318
2023
2038
2053
09-Aug-2024
07-Apr-2024
11-Jul-2024
12-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
934
Sultanpur
UNIVERSAL MEP
20066052
NARAHI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
8
3620
2023
2038
2053
12-Jan-2024
12-Jan-2024
06-Dec-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
935
Fatehpur
Power Mech Projects Ltd
20079161
NARAICHA GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
4300
2023
2038
2053
13-Mar-2024
06-Nov-2024
07-Aug-2024
07-Nov-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of August (7.08.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
936
Hardoi
NCC Ltd.
20011355
NARAINPUR GRANT
1
7
1590
2022
2037
2052
26-Jul-2023
11-Feb-2023
12-Aug-2023
30-Nov-2024
Approved
ok
Approved
OK
View
937
Meerut
Power Mech Projects Ltd
20066746
NARANGPUR
1
1
3580
2023
2038
2053
31-Dec-2024
06-Nov-2024
25-Mar-2025
06-Apr-2025
Approved
Recommended for further Approval
Approved
approved
View
938
Ambedkar Nagar
Vindhya-GAJA (JV)
20092701
NARHARIYA KARAMPUR Water Supply Scheme
2
7
3470
2023
2038
2053
24-Mar-2024
01-Jul-2025
17-Oct-2025
18-Oct-2025
Approved
Scheme completed and ready for O&M
Pending
View
939
Amethi
Vindhya-GAJA (JV)
20068981
NARHARPUR WATER SUPPLY SCHEME
1
4
2270
2023
2038
2053
23-Mar-2024
26-Jun-2024
26-Sep-2024
27-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents.
Approved
Hardcopy submitted and found okay as per the submitted documents..
View
940
Kanpur Dehat
Indian Hume Pipe
20015137
NARIHA
1
1
3825
2022
2037
2052
13-Oct-2021
12-Oct-2020
31-Mar-2024
01-Apr-2024
Approved
Forwarded to further action
Approved
All work of scheme found satisfactory
View
941
Kanpur Dehat
GVPR
20053272
NarKhurd
1
3
2558
2023
2038
2053
18-Nov-2023
27-Apr-2023
10-Sep-2023
11-Sep-2023
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
942
Sultanpur
UNIVERSAL MEP
20066074
NARSARA GRAM PANCHAYAT WATER SUPPLY SCHEME
1
4
2670
2023
2038
2053
12-Jan-2024
31-Dec-2024
29-Jan-2025
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
943
Etawah
Indian Hume Pipe
20014153
Naseerpur Bhoja
2
2
2580
2022
2037
2052
13-Sep-2021
09-Apr-2023
09-Apr-2024
10-Apr-2024
Approved
All work completed as per approved departmental design and drawing. Water supply is continue from last 1 years. No any leakage or pressure drop found during the final inspection.
Approved
All work of scheme found satisfactory
View
944
Ambedkar Nagar
Vindhya-GAJA (JV)
20083477
NASIRPUR CHITTAUNA WSS
4
6
3240
2023
2038
2053
08-Mar-2024
08-Mar-2025
08-Feb-2025
09-Feb-2025
Approved
Checked and found ok
Approved
SCHEME COMPLETED
View
945
Bareilly
NCC Ltd.
20013552
Nathapura Water Supply Scheme
1
1
2216
2022
2037
2052
02-May-2023
04-Feb-2023
04-May-2023
24-Oct-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Kallia scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Pending
View
946
Farrukhabad
Vindhya-GAJA (JV)
20074586
NATWARA MVS
2
6
2600
2023
2038
2053
31-Mar-2025
05-Sep-2024
01-Jan-2025
12-May-2025
Approved
Ok..
Approved
OK
View
947
Kanpur Dehat
VSA
20092709
naubadpur
1
1
1918
2023
2038
2023
31-Mar-2024
15-Jan-2024
25-Apr-2024
26-Apr-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
948
Farrukhabad
Vindhya-GAJA (JV)
20076891
NAUGAON SVS
1
4
3531
2023
2038
2053
30-May-2025
03-Jun-2024
16-Sep-2024
17-Sep-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
949
Sultanpur
UNIVERSAL MEP
20064699
NAUGVATEER GRAM PANCHAYAT WATER SUPPLY SCHEME
1
14
3460
2023
2038
2053
12-Jan-2024
31-Dec-2024
31-Jan-2025
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action
Approved
All uploaded documents have been checked and verified, found as per requirements.
View
950
Kanpur Dehat
GVPR
20053281
Nauha Naugaon
1
7
3284
2023
2038
2053
18-Nov-2023
01-Feb-2024
16-Jun-2024
17-Jun-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
951
Ambedkar Nagar
Vindhya-GAJA (JV)
20056723
NAURAHANI RAMPUR WSS
3
9
6820
2023
2038
2053
26-Dec-2023
24-Feb-2025
14-Jul-2025
15-Jul-2025
Approved
Approved Checked and found ok
Approved
CHECKED AND FOUND OK
View
952
Kannauj
GVPR
20036325
NAURANGPUR NAGARIYA & TIRWA DEHAT GRAMIN PEYJAL YOJNA
2
6
3802
2023
2038
2053
13-May-2024
25-Mar-2024
27-Jun-2024
28-Jun-2024
Approved
FORWARDED FOR FURTHER ACTION
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
953
Auraiya
GVPR
20065296
Nawada Dandu
1
7
4117
2023
2038
2053
06-Jan-2022
08-Jan-2024
31-Aug-2023
09-Jan-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
954
Auraiya
GVPR
20025449
NAWADA JWALA PRASAD
3
2
3645
2023
2038
2053
06-Jan-2022
12-Sep-2023
04-Jun-2023
21-Jul-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
955
Hardoi
NCC Ltd.
8362393
NAYA GAON DEORIYA
1
3
2160
2022
2037
2052
05-Mar-2023
05-Feb-2023
04-May-2023
24-Dec-2024
Approved
ok
Approved
OK
View
956
Hardoi
NCC Ltd.
20012336
NAYA GAON MUBARAKPUR
1
3
5595
2022
2037
2052
05-Mar-2023
09-Feb-2023
08-May-2023
24-Dec-2024
Approved
ok
Approved
OK
View
957
Farrukhabad
Vindhya-GAJA (JV)
20076881
NAYAMATPUR BHUKSI SVS
1
3
1716
2023
2038
2053
31-Mar-2025
30-Jan-2025
14-May-2025
15-May-2025
Approved
OK..
Approved
OK
View
958
Meerut
Power Mech Projects Ltd
20011114
NEEMKA
4
4
2783
2022
2037
2052
31-Dec-2024
19-Feb-2023
10-Jul-2023
30-Dec-2024
Approved
Recommended for further Approvals.
Approved
approved
View
959
Ayodhya
UNIVERSAL MEP
20030434
NEOTI & KOPAKANP GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME
2
5
3404
2023
2038
2053
12-Oct-2023
17-Oct-2023
17-Oct-2023
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
960
Hardoi
NCC Ltd.
20012481
Newada Chathiya
3
5
2660
2022
2037
2052
26-Jul-2023
24-Feb-2023
23-May-2023
24-Dec-2024
Approved
ok
Approved
OK
View
961
Amethi
Vindhya-GAJA (JV)
20085670
NEWADA KISUNPUR GARH WATER SUPPLY SCHEME
2
13
3882
2023
2038
2053
27-Mar-2023
22-Jun-2024
22-Sep-2024
23-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents.
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance..
View
962
Azamgarh
LC INFRA
20066405
Newada water supply scheme
2
5
3315
2022
2037
2052
04-Aug-2024
22-Jul-2024
22-Oct-2024
23-Oct-2024
Approved
OK
Approved
OK
View
963
Farrukhabad
Vindhya-GAJA (JV)
20097912
NIBALPUR SVS
1
1
1395
2023
2038
2053
30-May-2025
02-Jun-2024
02-Jun-2024
03-Jun-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
964
Kanpur Dehat
GVPR
20053031
Nibauli bujurg
2
2
2943
2023
2038
2053
17-Nov-2023
21-Dec-2023
22-Mar-2024
23-Mar-2024
Approved
Forward for further action.
Approved
All work of scheme found satisfactory
View
965
Kanpur Dehat
GVPR
20077480
NIGIHIYA
2
4
2203
2023
2038
2053
17-Feb-2024
15-Jan-2024
20-Apr-2024
21-Apr-2024
Approved
TKC unable to submit the calibration certificate and other report for O&M, Our letter No.SWSM/BLG/TPI/KD/O&M/2025-26/6655 dt.29/07/2028. we can go to O&M through conditional, TKC submit the require document within 15 day's.
Approved
All work of scheme found satisfactory
View
966
Amethi
Vindhya-GAJA (JV)
20067969
NIHAL GARH SAIDA PATTI WATER SUPPLY SCHEME
2
6
2006
2023
2038
2053
22-Mar-2024
22-Jun-2024
23-Sep-2024
24-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents.
Approved
Hardcopy submitted and found okay as per the submitted documents..
View
967
Kanpur Dehat
Indian Hume Pipe
20017095
Nihutha
2
2
1460
2022
2037
2052
05-Feb-2022
04-Feb-2022
31-Jan-2024
01-Feb-2024
Approved
Forward for Necessary
Approved
All work of scheme found satisfactory
View
968
Farrukhabad
Vindhya-GAJA (JV)
20076656
NINAURA SHANKLAPUR SADARIAPUR MVS
2
3
2229
2023
2038
2053
30-May-2025
04-Apr-2024
04-Apr-2024
05-Apr-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
969
Kanpur Dehat
Indian Hume Pipe
8361988
NINHAURA
1
1
3370
2022
2037
2052
15-Sep-2021
14-Sep-2021
30-Jun-2023
01-Jul-2023
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
970
Hardoi
NCC Ltd.
20010582
Nipaniya W/S
2
4
2350
2022
2037
2052
14-Jun-2023
05-Apr-2023
06-Jul-2023
30-Nov-2024
Approved
ok
Approved
OK
View
971
Sultanpur
UNIVERSAL MEP
20066442
NIRSAHIYA GRAM PANCHAYAT WATER SUPPLY SCHEME
3
8
3720
2023
2038
2053
12-Jan-2024
12-Jan-2024
20-Jan-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
972
Kanpur Dehat
GVPR
20077486
NIWADA ANI BARIGAON
4
9
3290
2023
2038
2053
17-Feb-2024
18-Nov-2023
02-Apr-2024
03-Apr-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
973
Kanpur Dehat
Indian Hume Pipe
20031467
Niwada deoray
1
1
2580
2022
2037
2052
23-Sep-2022
31-Dec-2024
31-Dec-2023
01-Jan-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
974
Kannauj
GVPR
20050188
NIYAMATPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
3
4
2966
2023
2038
2053
15-Jun-2024
16-Mar-2024
19-Jun-2024
20-Jun-2024
Approved
forwarded for further action
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
975
Etawah
Indian Hume Pipe
20024493
NIZAMPUR PWS
2
3
2185
2022
2037
2052
22-Sep-2023
16-Mar-2024
22-Jun-2024
23-Jun-2024
Approved
Forwarded for further action.
Approved
All works are satisfactory.
View
976
Kanpur Dehat
VSA
20099336
Nonapur
1
1
2466
2023
2038
2023
31-Mar-2024
02-Feb-2024
11-Jan-2024
12-Jan-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
977
Hardoi
NCC Ltd.
20011186
NOORPUR HATHAURA
1
8
6310
2022
2037
2052
05-Mar-2023
19-Dec-2023
18-Mar-2024
24-Dec-2024
Approved
ok
Approved
OK
View
978
Shahjahanpur
NCC Ltd.
20015952
NOORPUR NURSUIYA
1
1
2210
2022
2037
2052
30-Sep-2023
31-Dec-2024
30-Dec-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Noorpur Nursuiya scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Noorpur Narsuiya scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
979
Kannauj
GVPR
20077106
NUNARI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
3
2216
2023
2038
2053
08-Sep-2024
13-Apr-2024
17-Apr-2024
18-Apr-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
980
Auraiya
GVPR
20084701
Nurpur kharagpur
1
4
1578
2023
2038
2053
06-Jan-2022
03-May-2024
25-May-2024
26-May-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
981
Bijnor
LC INFRA
20011765
Orangpur Jogipura Water Supply Scheme
1
1
2496
2022
2037
2052
10-Feb-2022
13-May-2024
13-May-2024
14-May-2024
Approved
Every thing complete.
Approved
All document complete
View
982
Ayodhya
UNIVERSAL MEP
20058244
ORAVA & BAKAULI WSS
2
7
4820
2023
2038
2053
19-Mar-2024
04-Oct-2023
05-Oct-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
983
Meerut
Power Mech Projects Ltd
20011596
PABLI KHURD
1
1
2572
2022
2037
2052
31-Dec-2024
28-Dec-2022
31-Mar-2023
11-Nov-2024
Approved
Recommended for further Approval
Approved
approved
View
984
Meerut
Power Mech Projects Ltd
20037233
PACHGAON PATTI AMARSINGH
1
1
4373
2022
2037
2052
31-Dec-2024
17-Jul-2024
05-Jan-2025
06-Jan-2025
Approved
Recommended for further Approvals.
Approved
approved
View
985
Kannauj
GVPR
20066526
PACHORE GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
2815
2023
2038
2053
16-Aug-2024
31-Mar-2024
03-Jul-2024
04-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
986
Maharajganj
JMC - Lakshmi (JV)
20009809
PACHRUKHI Gram Panchayat Water Supply Scheme
1
11
3440
2022
2037
2052
30-Jul-2024
30-Jul-2024
29-Oct-2024
01-Nov-2024
Approved
Ok
Approved
As per JE/AE/TPIA Recommendation Pachrukhi W/S schemes completed. Water supply was provided regular basis.
View
987
Bijnor
LC INFRA
20087917
Padli Village Water Supply Scheme
2
2
1981
2022
2037
2052
13-Apr-2023
24-Feb-2025
23-Feb-2005
24-Feb-2025
Approved
Every thing completed.
Approved
Everything Completed.
View
988
Sultanpur
UNIVERSAL MEP
20066919
PADRE & KANEHATI GRAM PANCHAYAT WATER SUPPLY SCHEME
2
19
5320
2023
2038
2053
12-Jan-2024
31-Dec-2024
30-Jan-2025
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified, found as per requirements
View
989
Fatehpur
Power Mech Projects Ltd
20106722
PADRI NBIPUR
1
1
510
2023
2038
2053
18-Mar-2025
30-Jun-2025
15-Sep-2025
16-Sep-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of June(16.06.2025) and Direct Regular water supply is given to the consumers.
Approved
Verified
View
990
Mau
LC INFRA
20035392
PAHARIPUR KHIRIYA WATER SUPPLY SCHEME
2
6
2339
2022
2037
2052
06-Jul-2024
03-Nov-2023
06-Jul-2023
26-Nov-2024
Approved
All works of this scheme has been completed and water supply has been start.
Approved
Approved
View
991
Fatehpur
Power Mech Projects Ltd
20099435
PAHARPUR
2
3
2670
2023
2038
2053
13-Aug-2024
30-Jun-2025
18-Apr-2025
19-Apr-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of January(19.01.2025) and Regular water supply is given to the consumers.
Approved
Verified
View
992
Ambedkar Nagar
Vindhya-GAJA (JV)
20041820
PAHARPUR SULTANPUR WSS
2
3
2510
2023
2038
2053
23-Nov-2023
21-Dec-2024
21-Mar-2025
22-Mar-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme completed
View
993
Sultanpur
UNIVERSAL MEP
20066386
PAHATTEPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
3
5
2724
2023
2038
2053
12-Jan-2024
12-Jan-2024
29-Jun-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
994
Amethi
Gayatri Projects LTD
20101987
PAIGA WATER SUPPLY SCHEME
1
5
1248
2022
2037
2052
26-Nov-2025
25-Jun-2024
26-Sep-2024
15-Nov-2024
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
995
Auraiya
GVPR
20084714
Pakhangoi PWS
1
1
1608
2023
2038
2053
01-Jun-2024
30-Apr-2024
29-Apr-2024
01-May-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
996
Ayodhya
UNIVERSAL MEP
20058437
Pakriyagaon WSS
2
4
2350
2023
2038
2053
22-Jan-2024
02-Jun-2024
02-Jun-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
997
Kannauj
GVPR
20067668
PALA GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
2071
2023
2038
2053
16-Aug-2024
10-Nov-2024
15-Nov-2024
15-Feb-2025
Approved
forwarded for Further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
998
Kanpur Dehat
GVPR
20065233
Paliya Banskhera
1
6
2744
2023
2038
2053
18-Jan-2024
04-Dec-2023
18-Apr-2024
19-Apr-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
999
Kannauj
GVPR
20066652
PALIYA BUNCHPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
3
2492
2023
2038
2053
06-Aug-2024
31-Mar-2024
03-Jul-2024
04-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1000
Shahjahanpur
NCC Ltd.
20014817
PALIYA PATTI
2
2
2159
2022
2037
2052
01-Dec-2023
31-Dec-2024
01-Mar-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Paliya Patti scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Paliya Patti scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1001
Kanpur Dehat
Indian Hume Pipe
20111027
Paman
2
3
2405
2022
2037
2052
10-Oct-2023
31-Dec-2024
31-Aug-2024
01-Sep-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
1002
Meerut
Power Mech Projects Ltd
8362073
PANCHI
1
1
5693
2022
2037
2052
16-Jul-2023
15-Feb-2023
05-Jul-2023
06-Apr-2025
Approved
Recommended for further Approvals.
Approved
approved
View
1003
Azamgarh
LC INFRA
20058125
Pandaha water supply scheme
4
8
2710
2023
2038
2053
09-May-2024
13-Mar-2024
12-Jun-2024
13-Jun-2024
Approved
ok
Approved
ok
View
1004
Ambedkar Nagar
Vindhya-GAJA (JV)
20041625
PANDEY PAIKAULI
1
7
4750
2023
2038
2053
23-Oct-2023
14-Aug-2024
09-Jul-2025
10-Oct-2025
Approved
Checked and Found OK
Approved
CHECKED AND FOUND OK
View
1005
Lakhimpur Kheri
NCC Ltd.
8359762
PANGI KALAN
1
4
4847
2022
2037
2052
09-Apr-2023
01-Aug-2023
02-Nov-2023
21-Mar-2025
Approved
Approved as per check list
Pending
View
1006
Amethi
Vindhya-GAJA (JV)
20065222
Paniyar Water Supply Scheme
5
17
4114
2023
2038
2053
17-Feb-2024
15-Jun-2025
15-Sep-2024
16-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance..
View
1007
Shahjahanpur
NCC Ltd.
20019694
Panthi
2
2
2520
2022
2037
2052
31-Aug-2023
31-Dec-2024
11-Nov-2023
16-Nov-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Panthi scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Panthi scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1008
Amroha
OMIL-JWIL (JV)
20023387
PARA KHALSA GRAM PANCHAYAT WATER SUPPLY SCHEME
2
2
2099
2023
2038
2053
31-Dec-2024
30-Nov-2024
08-Mar-2024
30-Nov-2024
Approved
Trial run successfully completed on 10-09-2024
Approved
Approved
View
1009
Ambedkar Nagar
Vindhya-GAJA (JV)
20047603
PARAS KATUI Water Supply Scheme
3
7
3460
2023
2038
2053
23-Nov-2023
03-Apr-2025
03-Apr-2025
04-Apr-2025
Approved
Checked and Verifiyed
Approved
Scheme completed
View
1010
Siddharth Nagar
Megha
8360529
Paraspur GP WSS
1
3
2115
2022
2037
2052
31-Dec-2025
02-Apr-2025
15-Jan-2025
12-Apr-2025
Approved
All documents verified and found as per guideline of SWSM. Sending for further process
Pending
View
1011
Mau
GA INFRA-VPL
20100924
PARASPURA GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
850
2023
2038
2053
19-Jan-2025
19-Jan-2025
18-Jan-2025
19-Jan-2025
Approved
APPROVED
Approved
APPROVED
View
1012
Fatehpur
Power Mech Projects Ltd
20102042
PARI NARWA
1
1
1920
2023
2038
2053
24-Jan-2024
23-Jan-2025
19-Aug-2025
20-Aug-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of May(20.05.2025) and Regular water supply is given to the consumers.
Approved
Verified
View
1013
Meerut
Power Mech Projects Ltd
20020242
PARIKSHITGARH DEHAT
1
1
3638
2022
2037
2052
31-Dec-2024
14-Jan-2024
01-Jun-2024
18-Dec-2024
Approved
Recommended for further Approval
Approved
approved
View
1014
Ambedkar Nagar
Vindhya-GAJA (JV)
20068319
PARIYAI WSS
2
5
2970
2023
2038
2053
20-Feb-2024
30-Jun-2025
25-Oct-2025
26-Oct-2025
Approved
Checked and found ok
Approved
Scheme Completed
View
1015
Sitapur
NCC Ltd.
8362975
PARSADA
1
3
3379
2022
2037
2052
11-Mar-2023
30-Aug-2022
25-Dec-2023
18-Nov-2024
Approved
Work completed as per filled checklist.
Approved
APPROVE
View
1016
Kannauj
GVPR
20036207
PARSARAMAU GRAMIN PEYJAL YOJNA
2
5
3850
2023
2038
2053
13-May-2024
10-Nov-2024
14-Feb-2025
15-Feb-2025
Approved
Forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1017
Kanpur Dehat
GVPR
20065234
PARSAURA
2
3
1955
2023
2038
2053
18-Jan-2024
22-Jul-2024
05-Dec-2024
06-Dec-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
1018
Kanpur Dehat
GVPR
20026303
PARSOLI & BHUJPURA
2
5
3674
2023
2038
2053
26-Sep-2023
08-Nov-2023
22-Mar-2024
23-Mar-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
1019
Amethi
Vindhya-GAJA (JV)
20068382
PARSOYIA WATER SUPPLY SCHEME
2
10
2541
2023
2038
2053
23-Mar-2024
27-Jun-2024
27-Sep-2024
28-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
1020
Ayodhya
UNIVERSAL MEP
20030555
PASTAMAPHI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
3
2590
2023
2038
2053
12-Oct-2023
29-Aug-2023
29-Aug-2023
15-Nov-2024
Approved
Found ok
Approved
Found correct
View
1021
Meerut
Power Mech Projects Ltd
20012933
PASWARA
1
1
3634
2022
2037
2052
31-Dec-2024
22-Feb-2023
11-Jul-2023
11-Nov-2024
Approved
CHECKED AND VERIFIED....
Approved
approved
View
1022
Sultanpur
UNIVERSAL MEP
20066498
PATAIPUR & NAAUGVA RAYTASI GRAM PANCHAYAT WATER SUPPLY SCHEME
4
8
5110
2023
2038
2053
12-Jan-2024
12-Jan-2024
25-Mar-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
1023
Ghaziabad
LC INFRA
8360451
PATTI
1
1
2048
2022
2037
2052
31-Mar-2024
10-Mar-2024
10-Mar-2024
01-Apr-2024
Approved
Satisfactory on the work & completed all civil works and E&M works.
Approved
All work checked and recommended for O&M
View
1024
Kannauj
GVPR
20066667
PATTI & BIBIPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
5
6
2905
2023
2038
2053
16-Aug-2024
31-Mar-2024
03-Jul-2024
04-Jul-2024
Approved
FORWARDED FOR FURTHER ACTION.
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
1025
Farrukhabad
Vindhya-GAJA (JV)
20092860
PATTI DARAPUR MVS
3
3
2972
2023
2038
2053
31-Mar-2025
02-Sep-2024
15-Dec-2024
16-Dec-2024
Approved
All the parameters of scheme verified can take in O&M
Approved
ok
View
1026
Meerut
Power Mech Projects Ltd
20098181
PATTI KHERKI
1
1
642
2023
2038
2053
31-Dec-2024
05-Apr-2024
21-Aug-2024
02-Mar-2025
Approved
Recommended for further Approval
Approved
approved
View
1027
Kannauj
GVPR
20050537
PAURAUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
4
4735
2023
2038
2053
15-Jun-2024
04-Nov-2024
07-Feb-2025
08-Feb-2025
Approved
Forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1028
Amethi
Gayatri Projects LTD
20072819
Peeparpur & Naugirwan GP water supply scheme
2
6
2689
2022
2037
2052
13-Aug-2024
25-Jun-2024
29-Sep-2024
16-Nov-2024
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
1029
Meerut
Power Mech Projects Ltd
20011227
PEPLA
1
1
2911
2022
2037
2052
31-Dec-2024
02-Mar-2023
19-Jul-2023
10-Mar-2025
Approved
Recommended for further Approval
Approved
approved
View
1030
Kannauj
GVPR
20077071
PHARHAN GRAM PANCHAYAT WATER SUPPLY SCHEME
2
2
1774
2023
2038
2053
16-Aug-2024
21-Jan-2025
23-Apr-2025
24-Apr-2025
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1031
Meerut
Power Mech Projects Ltd
20011298
PHITKARI
1
1
5025
2023
2037
2052
31-Dec-2024
17-Mar-2023
05-Aug-2023
10-Mar-2025
Approved
Recommended for further Approval
Approved
approved
View
1032
Etawah
Indian Hume Pipe
20015030
Phoolpur
1
3
1790
2022
2037
2052
12-Oct-2022
14-Apr-2024
24-Jul-2024
25-Jul-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1033
Auraiya
GVPR
20064344
Phoolpur PWS
1
6
3085
2023
2038
2053
01-Jun-2024
01-Oct-2024
30-Sep-2024
01-Oct-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1034
Jaunpur
AFCONS
20044677
PHOOLPUR VILLAGE WATER SUPPLY SCHEME
2
5
2647
2023
2038
2053
18-Nov-2023
15-Feb-2025
15-May-2025
16-May-2025
Approved
ok
Approved
ok
View
1035
Kannauj
GVPR
20077126
PHULANPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
3
2931
2023
2038
2053
08-Sep-2024
10-Apr-2024
13-Jul-2024
14-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1036
Ambedkar Nagar
Vindhya-GAJA (JV)
20068332
PICHAWARA WSS
2
3
1580
2023
2038
2053
08-Mar-2024
15-Jun-2025
14-Oct-2025
15-Oct-2025
Approved
Checked and found ok
Approved
Scheme Completed
View
1037
Mau
LC INFRA
8389108
PIDHWAL
1
10
4349
2022
2037
2052
20-Sep-2023
11-Sep-2024
10-Sep-2024
11-Sep-2024
Approved
Approved
Approved
Approved
View
1038
Amethi
Gayatri Projects LTD
20035177
PINDARA PARERA WATER SUPPLY SCHEME
1
11
4328
2022
2037
2052
03-Nov-2024
15-May-2024
20-Aug-2024
01-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
1039
Ambedkar Nagar
Vindhya-GAJA (JV)
20019810
Pipri Mohammadi
2
7
2053
2023
2038
2053
03-Aug-2023
17-Feb-2025
17-May-2025
18-May-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme completed
View
1040
Hardoi
NCC Ltd.
20011881
PIPRINARAYANPUR
2
4
2320
2022
2037
2052
14-Jun-2023
15-May-2023
17-Aug-2023
17-Dec-2024
Approved
ok
Approved
OK
View
1041
Sultanpur
UNIVERSAL MEP
20066414
PIROOSARAIYA GRAM PANCHAYAT WATER SUPPLY SCHEME
2
6
3790
2023
2038
2053
12-Jan-2024
31-Dec-2024
20-Jan-2025
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified, found as per requirements.
View
1042
Etawah
Indian Hume Pipe
20026341
Pirthverampur pWS
1
3
1575
2022
2037
2052
22-Sep-2023
04-Apr-2024
10-Jul-2024
11-Jul-2024
Approved
Dear Sir, the above data has been verified and forwarded to you for further action.
Approved
All work of scheme found satisfactory
View
1043
Kanpur Dehat
GVPR
20025202
PITARAPUR
2
4
3415
2023
2038
2053
26-Sep-2023
01-Sep-2023
12-Jan-2024
13-Jan-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
1044
Meerut
Power Mech Projects Ltd
8359771
POHALI
1
1
6287
2022
2037
2052
31-Dec-2024
25-Feb-2024
13-Jul-2024
13-Nov-2024
Approved
Recommended for further Approvals.
Approved
approved
View
1045
Meerut
Power Mech Projects Ltd
20011059
POOTHI
1
1
2513
2022
2037
2052
31-Dec-2024
21-Jun-2023
06-Nov-2023
28-May-2025
Approved
Recommended for further Approvals.
Approved
approved
View
1046
Auraiya
GVPR
20091178
Pouthi PWS
2
1
2285
2023
2038
2053
31-Dec-2024
24-Jul-2024
27-Jul-2024
27-Jul-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1047
Ambedkar Nagar
Vindhya-GAJA (JV)
20042925
PRATAPIPUR WSS
1
5
4010
2023
2037
2053
23-Nov-2023
14-Jun-2024
02-Dec-2024
03-Dec-2024
Approved
Checked and found ok
Approved
SCHEME COMPLETED
View
1048
Sultanpur
UNIVERSAL MEP
20066674
PRATAPPUR SECOND & KOTVA GRAM PANCHAYAT WATER SUPPLY SCHEME
3
3
3620
2023
2038
2053
12-Jan-2024
12-Jan-2024
03-Dec-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
1049
Kannauj
GVPR
20043957
PREMPUR GRAMIN PEYJAL YOJNA
2
4
2930
2023
2038
2053
13-May-2024
07-Apr-2024
11-Jul-2024
12-Jul-2024
Approved
FORWARDED FOR FURTHER ACTION.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1050
Bijnor
LC INFRA
20018334
Prempur Water Supply Scheme
1
1
2200
2022
2037
2052
10-Feb-2024
23-Nov-2023
27-May-2024
28-May-2024
Approved
every thing completed
Approved
Compeleted
View
1051
Auraiya
GVPR
20041733
Pura kalan PWS
3
2
4154
2023
2038
2053
31-Dec-2024
23-Jun-2023
06-May-2024
23-Jun-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1052
Amethi
Vindhya-GAJA (JV)
20098338
PURAB DWARA Water Supply Scheme
1
3
1541
2023
2038
2053
04-Jul-2024
11-Nov-2024
11-Feb-2025
10-May-2025
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
1053
Amethi
Vindhya-GAJA (JV)
20085699
PURAB GAON WATER SUPPLY SCHEME
1
11
1863
2023
2038
2053
13-Mar-2024
18-Jun-2024
18-Sep-2024
21-Dec-2024
Approved
Hardcopy submiited and all documents found okay..
Pending
View
1054
Ayodhya
UNIVERSAL MEP
20058524
Purain WSS
1
5
5190
2023
2038
2053
12-Oct-2023
02-Sep-2024
02-Sep-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
1055
Rampur
SPML Infra
20033276
Purainia Kalan GP W/S Scheme
1
1
2601
2022
2037
2052
01-Nov-2023
08-Nov-2024
08-Feb-2025
09-Feb-2025
Approved
All docs found in order
Pending
View
1056
Kanpur Dehat
GVPR
20069962
puran purwa
1
3
3673
2023
2038
2053
17-Feb-2024
05-Jan-2024
11-Apr-2024
12-Apr-2024
Approved
We cane Approve & refer Our letter No.SWSM/BLG/TPI KD/O&M/2025-26/6655 dt.29/07/2028 and SWSM/BLG/TPI/KD/O&M/2025-26/6657 DT.30.07.2025.
Approved
All work of scheme found satisfactory
View
1057
Amethi
Vindhya-GAJA (JV)
20098321
PURE MIHIB SHAH Water Supply Scheme
2
7
3000
2023
2038
2053
04-Jul-2024
05-Jun-2024
05-Sep-2024
06-Dec-2024
Approved
All Document not provided by EPC hence returns to the EPC
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
View
1058
Amethi
Vindhya-GAJA (JV)
20067991
PURE PAHAL WAN WATER SUPPLY SCHEME
2
14
2088
2023
2038
2053
07-Feb-2024
22-Jun-2024
22-Sep-2024
23-Dec-2024
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance.
View
1059
Auraiya
GVPR
20099159
Purwa balai
3
2
2102
2023
2038
2053
06-Jan-2022
06-Apr-2024
15-Dec-2023
01-Feb-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1060
Jhansi
DARA ENGINEERING
8135931
Purwa GOV
32
8
77784
2023
2038
2053
11-Jun-2022
01-Apr-2024
23-Dec-2024
24-Dec-2024
Approved
checked
Approved
approved
View
1061
Auraiya
GVPR
20095101
Purwa Rahat PWS
1
1
1474
2023
2038
2033
31-Dec-2024
19-May-2024
08-May-2024
09-May-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1062
Auraiya
GVPR
20089648
Purwa rawat PWS
4
8
2311
2023
2038
2053
06-Jan-2022
31-Dec-2024
06-Jun-2024
23-Jul-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1063
Hardoi
NCC Ltd.
8388443
PURWA WAJI RAO
1
2
3495
2022
2037
2052
05-Mar-2023
16-May-2023
15-Aug-2023
24-Dec-2024
Approved
ok
Approved
OK
View
1064
Auraiya
Indian Hume Pipe
20022753
Pusauli Village Water Supply Schem
2
2
2350
2022
2037
2052
09-May-2022
07-Nov-2023
29-Feb-2024
01-Mar-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1065
Meerut
Power Mech Projects Ltd
20011335
PUTHRI
1
1
2513
2022
2037
2052
31-Dec-2024
21-Jun-2023
06-Nov-2023
05-Nov-2024
Approved
Recommended for further Approvals.
Approved
approved
View
1066
Gautam Buddha Nagar
LC INFRA
20013502
PYAWALI TAJPUR W/S SCHEME
1
1
5726
2022
2037
2052
07-Feb-2024
15-Dec-2024
15-Sep-2024
15-Dec-2024
Approved
Project certificate is verified
Pending
View
1067
Meerut
Power Mech Projects Ltd
20098098
RAFAN
1
1
1634
2023
2038
2053
11-Jun-2025
26-Oct-2024
15-Mar-2025
01-May-2025
Approved
Recommended for further Approval
Approved
approved
View
1068
Meerut
Power Mech Projects Ltd
20098078
RAGHUNATHPUR
1
1
1285
2023
2038
2053
31-Dec-2024
14-Aug-2024
02-Jan-2025
04-Jan-2025
Approved
Recommended for further Approvals.
Approved
approved
View
1069
Shahjahanpur
NCC Ltd.
20014017
Raghunathpur
4
4
2500
2022
2037
2052
30-Sep-2023
31-Dec-2024
30-Dec-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Raghunathpur J Rampur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Raghunathpur J. Rampur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1070
Shahjahanpur
NCC Ltd.
20015591
Raghunathpur Khas
1
1
2810
2022
2037
2052
24-Dec-2023
31-Dec-2024
04-Apr-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of RAGHUNATHPUR KHAS scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Raghunathpur Khas scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1071
Ghaziabad
LC INFRA
20021478
RAGHUNATHPUR PWS SCHEME
1
1
2695
2022
2037
2052
09-Feb-2022
30-Oct-2024
28-Feb-2025
01-Mar-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
All work checked and recommended for O&M
View
1072
Azamgarh
LC INFRA
20101578
RAGHUNATHPUR WSS
3
9
4161
2023
2038
2053
31-May-2023
25-Jul-2024
24-Oct-2024
25-Oct-2024
Approved
ok
Approved
ok
View
1073
Fatehpur
Power Mech Projects Ltd
20097879
RAHALLAPUR
2
2
2360
2023
2033
2058
13-Aug-2024
30-Jun-2025
29-Apr-2025
30-Apr-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of January(30.01.2025) and Regular water supply is given to the consumers.
Approved
Verified
View
1074
Ayodhya
UNIVERSAL MEP
20030535
RAHIMGANJ GRAM PANCHAYAT WATER SUPPLY SCHEME
2
4
3120
2023
2038
2053
12-Oct-2023
31-Aug-2023
31-Aug-2023
30-Nov-2024
Approved
FOUND OK
Pending
View
1075
Ambedkar Nagar
Vindhya-GAJA (JV)
20019826
Rahimpur Patti
2
7
3250
2023
2038
2053
03-Aug-2023
20-Jul-2024
02-Dec-2024
03-Dec-2029
Approved
Checked and found ok
Approved
Scheme completed
View
1076
Meerut
Power Mech Projects Ltd
20010922
RAHMAPUR
1
1
2701
2022
2037
2052
31-Dec-2024
19-Dec-2023
05-May-2024
06-Nov-2024
Approved
Recommended for further Approval
Approved
approved
View
1077
Bijnor
LC INFRA
20013983
RAHTI JAGIR WATER SUPPLY SCHEME
1
1
3029
2022
2037
2052
30-Sep-2023
10-Dec-2023
08-Jun-2024
09-Jun-2024
Approved
Every thing complete
Approved
Everything is Completed.
View
1078
Bijnor
LC INFRA
8388868
RAIPUR MAUZAMPUR NARAYAN GRAMPANCHAYAT WATER SUPPLY SCHEME
1
1
2404
2022
2037
2052
13-Sep-2023
14-Nov-2023
27-May-2024
28-May-2024
Approved
Every thing completed.
Approved
EVERY THIS COMPLETED
View
1079
Mau
LC INFRA
20064741
Raisa Gram Panchayat Water Supply Scheme
3
7
2920
2022
2037
2052
05-Jan-2025
01-Apr-2025
01-Apr-2025
05-Apr-2025
Approved
Approved....
Approved
Approved
View
1080
Sultanpur
UNIVERSAL MEP
20064683
RAJAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
10
3110
2023
2038
2053
12-Jan-2024
12-Jan-2024
26-Jan-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
1081
Shahjahanpur
NCC Ltd.
20015092
Rajepur Raipur
1
2
2430
2022
2037
2052
31-Dec-2024
04-Jan-2024
04-Apr-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Rajepur Raipur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Rajepur Raipur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1082
Kannauj
GVPR
20050182
RAJPUR KARAN GRAM PANCHAYAT WATER SUPPLY SCHEME
2
6
1989
2023
2038
2053
15-Jun-2024
16-Apr-2024
19-Jul-2024
20-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1083
Etawah
Indian Hume Pipe
20058832
Rajpurtameri
3
3
2280
2022
2037
2052
05-Jan-2024
09-Jun-2023
13-Dec-2023
14-Dec-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1084
Auraiya
GVPR
20091145
Rajuamau PWS
1
2
3254
2033
2038
2053
06-Jan-2022
19-Apr-2024
18-Apr-2025
20-Apr-2025
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1085
Meerut
Power Mech Projects Ltd
8362623
RALI CHAUHAN
1
1
3588
2022
2037
2052
31-Dec-2024
01-Mar-2023
20-Jul-2023
10-Dec-2024
Approved
Recommend for Further Approval
Approved
approved
View
1086
Bijnor
LC INFRA
8388717
RAM NAGER VILLAGE WATER SUPPLY SCHEME
1
1
2430
2022
2037
2052
29-Sep-2023
12-Mar-2024
10-Jun-2024
11-Jun-2024
Approved
Every thing complete.
Approved
All document checked
View
1087
Amethi
Gayatri Projects LTD
20034985
RAMAE WATER SUPPLY SCHEME
1
4
3002
2022
2037
2052
06-May-2025
21-Jun-2024
24-Sep-2024
06-Nov-2024
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
1088
Kanpur Dehat
GVPR
20077563
RAMALNYAI NARSOOJHA
3
4
2808
2023
2038
2053
17-Feb-2024
27-Jan-2024
30-Apr-2024
01-May-2024
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
1089
Kannauj
GVPR
20036627
RAMKHERA & SARAI GOPAL GRAMIN PEYJAL YOJNA
2
3
3882
2023
2038
2053
13-May-2024
25-Mar-2024
27-Jun-2024
28-Jun-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1090
Sultanpur
UNIVERSAL MEP
20066596
RAMNAGAR BANKATH & UGAIPUR GROUP OF GRAM PANCHAYAT WATER SUPPLY SCHEME
3
5
5460
2023
2038
2053
12-Jan-2024
31-Dec-2024
15-Jan-2025
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
1091
Sultanpur
UNIVERSAL MEP
20067058
RAMNAGAR FIRST & DHABIA GRAM PANCHAYAT WATER SUPPLY SCHEME
3
10
4005
2023
2038
2053
12-Jan-2024
12-Jan-2024
30-Nov-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
1092
Ambedkar Nagar
Vindhya-GAJA (JV)
20033823
RAMNAGAR NARSINGHPUR WATER SUPPLY SCHEME
2
8
4666
2023
2038
2053
22-Oct-2022
21-Oct-2023
14-Jan-2025
15-Jan-2025
Approved
checked and found ok
Approved
Scheme completed
View
1093
Sultanpur
UNIVERSAL MEP
20077655
RAMPUR & DHARUPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
2
6
3680
2023
2038
2053
12-Jan-2024
12-Jan-2024
12-Feb-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
1094
Gautam Buddha Nagar
LC INFRA
20017814
RAMPUR BANGER GRAM PANCHAYAT WATER SUPPLY
1
1
4293
2022
2037
2052
20-Mar-2023
31-Mar-2024
31-Oct-2024
01-Nov-2024
Approved
Project certificate is verified
Approved
Verified
View
1095
Auraiya
GVPR
20099251
Rampur bihari PWS
3
8
2995
2023
2038
2053
06-Jan-0222
23-Oct-2023
22-Oct-2023
23-Oct-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory. All work of scheme found satisfactory.
View
1096
Amethi
Gayatri Projects LTD
20076471
RAMPUR CHAUDHARI & ALIPUR WATER SUPPLY SCHEME
2
10
3234
2022
2037
2052
22-Mar-2025
02-Sep-2024
05-Dec-2024
10-Mar-2025
Approved
Hardcopy submitted and found okay as per the submitted documents.
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance...
View
1097
Bijnor
LC INFRA
20038886
Rampur Gram Panchayat Water Supply
3
3
1917
2022
2037
2052
14-Nov-2022
06-Jan-2025
06-Jan-2025
07-Jan-2025
Approved
Every thing complete.
Approved
Everything Completed.
View
1098
Ambedkar Nagar
Vindhya-GAJA (JV)
20026107
RAMPUR INDI-PINDI WATER SUPPLY SCHEME
1
1
2200
2023
2038
2053
26-Dec-2023
23-Dec-2024
26-Mar-2025
27-Mar-2025
Approved
CHECKED AND FOUND OK
Approved
Scheme completed
View
1099
Ayodhya
UNIVERSAL MEP
20031499
RAMPUR JANAK & DEVAIT GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME
2
5
3740
2023
2038
2053
12-Oct-2023
22-May-2024
22-May-2024
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
1100
Mau
LC INFRA
20044981
Rampur Kadhi GRAM PANCHAYAT RURAL WATER SUPPLY SCHEME
2
4
1441
2022
2037
2052
02-May-2023
26-Dec-2024
21-Dec-2024
26-Dec-2024
Approved
All Documents Checked $ Verified
Approved
Approved
View
1101
Kanpur Dehat
Indian Hume Pipe
20034292
RAMPUR KUKHAT
1
2
3600
2022
2037
2052
24-Nov-2022
31-Dec-2024
30-Jun-2023
01-Jul-2023
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
1102
Kannauj
GVPR
20090117
RAMPUR NIGOH & GHILOEE GHAS GRAM PANCHAYAT WATER SUPPLY SCHEME
3
5
3179
2023
2038
2053
08-Sep-2024
04-Nov-2024
07-Feb-2025
08-Feb-2025
Approved
forwarded for Further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1103
Ambedkar Nagar
Vindhya-GAJA (JV)
20033825
RAMPUR SAKARWARI WATER SUPPLY SCHEME
4
13
5088
2023
2038
2053
21-Oct-2023
09-Apr-2025
09-Apr-2025
10-Apr-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme Completed
View
1104
Shahjahanpur
NCC Ltd.
20017965
Rampur W/S
2
2
2340
2022
2037
2052
06-Jul-2024
31-Dec-2024
05-Oct-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Rampur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Rampur W/s scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1105
Kannauj
GVPR
20050178
RANVEERPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
8
3048
2023
2038
2053
11-Jun-2024
16-Apr-2024
19-Jul-2024
20-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1106
Mau
LC INFRA
8360470
RASADI GRAM PANCHAYAT RURAL WATER SUPPLY SCHEME
3
5
2728
2022
2037
2052
20-Sep-2023
05-Nov-2024
02-Nov-2024
05-Nov-2024
Approved
Approved....
Approved
Approved.
View
1107
Ayodhya
UNIVERSAL MEP
20031488
RASEED PATTI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
2460
2023
2038
2053
12-Oct-2023
14-Jan-2025
14-Jan-2025
01-Feb-2025
Approved
FOUND OK
Pending
View
1108
Amethi
Gayatri Projects LTD
20102462
RASOOLABADH WATER SUPPLY SCHEME
1
14
5536
2022
2037
2052
27-Jun-2024
03-Jun-2024
06-Sep-2024
15-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance
View
1109
Kanpur Dehat
GVPR
20077538
RASOOLPUR RASULABAD
2
4
1849
2023
2038
2053
17-Feb-2024
21-Nov-2023
05-Apr-2024
06-Apr-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
1110
Bahraich
PNC-SPML-JV
20014668
RASOOLPUR SARRAIYA CHITTAURA PWS
1
7
3588
2022
2037
2052
31-Dec-2025
07-Oct-2025
07-Oct-2025
08-Oct-2025
Approved
scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/09/0143 kindly complete it.
Approved
SCHEME COMPLETED
View
1111
Etawah
Indian Hume Pipe
20026096
Rasulabad PWS
1
2
1450
2022
2037
2052
22-Sep-2023
27-Feb-2024
08-Jun-2024
09-Jun-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory
View
1112
Kannauj
GVPR
20077066
RASULPUR BIKUPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
2
5
3054
2023
2038
2053
16-Aug-2024
31-Mar-2024
03-Jul-2024
04-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
1113
Meerut
Power Mech Projects Ltd
20020267
RASULPUR DANTLA
1
1
2776
2023
2037
2052
31-Dec-2024
16-Dec-2023
03-May-2024
17-Feb-2025
Approved
Recommended for Further Approval
Approved
approved
View
1114
Meerut
Power Mech Projects Ltd
20078572
RASULPUR IKLA WATER SUPPLY SCHEME
1
1
5297
2023
2038
2053
31-Dec-2024
05-Apr-2024
21-Aug-2024
07-Oct-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
1115
Meerut
Power Mech Projects Ltd
20067224
RASULPUR MURADNAGAR & TANDI
2
2
3235
2022
2037
2052
31-Dec-2024
24-Mar-2024
09-Aug-2024
05-Feb-2025
Approved
Recommended for further Approval
Approved
approved
View
1116
Fatehpur
Power Mech Projects Ltd
20097478
RASULPUR URF VAISAPUR
1
1
1730
2023
2038
2053
15-Apr-2025
07-Jan-2025
07-Jan-2025
08-Jan-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of October (08.10.2024) and Regular water supply is given to the consumers.
Approved
Verify
View
1117
Mau
LC INFRA
20025893
Rasulpur Water Supply Scheme
4
12
1881
2022
2037
2052
30-Nov-2023
25-Mar-2025
12-Jun-2024
25-Mar-2025
Approved
All Documents Checked $ Verified
Approved
Approved.
View
1118
Farrukhabad
Vindhya-GAJA (JV)
20093046
RATANPUR PAMARAN SVS
1
1
2001
2023
2038
2053
30-May-2025
31-Jan-2024
15-May-2024
16-May-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
1119
Meerut
Power Mech Projects Ltd
20098095
RATHAURA KHURD
1
1
1362
2023
2038
2053
31-Jan-2025
28-Sep-2024
14-Feb-2025
15-Feb-2025
Approved
Recommended for further Approvals.
Approved
approved
View
1120
Farrukhabad
Vindhya-GAJA (JV)
20076894
RATHAURA MUHIUDDINPUR SVS
1
2
2295
2023
2038
2053
31-Mar-2025
11-Oct-2024
02-Feb-2025
03-Feb-2025
Approved
All the parameters of scheme verified can take in O&M
Approved
OK
View
1121
Muzaffarnagar
Gayatri Projects LTD
20098063
RATHUR GP RO WSS
1
1
1771
2023
2038
2053
16-Sep-2022
02-Dec-2024
02-Mar-2025
03-Mar-2025
Approved
The details given by the contractor are correct at the time of approval.
Pending
View
1122
Kanpur Dehat
GVPR
20065237
RATNIYAPUR
2
3
2680
2023
2038
2053
18-Jan-2024
08-Dec-2023
12-Dec-2023
16-Mar-2024
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
1123
Farrukhabad
Vindhya-GAJA (JV)
20074585
REHA KARANPUR MVS
4
5
4507
2023
2038
2053
30-May-2025
26-Apr-2024
26-Apr-2024
27-Apr-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
1124
Meerut
Power Mech Projects Ltd
20058444
REHADRA & MURADGAON URF KUWAKHEDA
2
2
2720
2022
2037
2052
31-Dec-2024
25-Mar-2024
10-Aug-2024
02-Mar-2025
Approved
Recommended for further Approval
Approved
approved
View
1125
Kannauj
GVPR
20077109
RERI & RAMPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
2
2
1976
2023
2038
2053
08-Sep-2024
16-Apr-2024
19-Jul-2024
20-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1126
Ambedkar Nagar
Vindhya-GAJA (JV)
20056396
REWALI WSS
1
4
3850
2023
2038
2053
28-Jun-2023
25-Dec-2024
31-Mar-2025
01-Apr-2025
Approved
checked and found ok
Approved
Scheme completed
View
1127
Kannauj
GVPR
20077103
RITUKALA GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
1746
2023
2038
2053
08-Sep-2024
10-Apr-2024
13-Jul-2024
14-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1128
Mau
LC INFRA
8389102
RIYAV
3
5
3472
2022
2036
2052
20-Sep-2023
25-Oct-2024
20-Oct-2024
25-Oct-2024
Approved
Approved.
Approved
Approved..
View
1129
Mau
LC INFRA
20085245
RO MAIDPUR SAMASTPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
1520
2022
2037
2052
02-Mar-2025
02-Apr-2024
02-Apr-2025
03-Apr-2025
Approved
Approved..
Approved
Approved..
View
1130
Ambedkar Nagar
Vindhya-GAJA (JV)
20084870
ROHAN PARA WSS
2
2
3380
2023
2038
2053
20-Mar-2024
23-Dec-2024
26-Mar-2025
27-Mar-2025
Approved
checked and found ok
Approved
Scheme completed
View
1131
Muzaffarnagar
Gayatri Projects LTD
20022060
Roni harjipur
1
1
8632
2023
2038
2053
04-Feb-2024
05-Nov-2023
05-Feb-2024
06-Feb-2024
Approved
The details given by the contractor are correct at the time of approval.
Approved
OK
View
1132
Kanpur Dehat
Indian Hume Pipe
8361972
ROSHANMAU
1
1
2290
2022
2037
2052
14-Sep-2022
31-Dec-2024
15-Feb-2024
01-Mar-2024
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
1133
Farrukhabad
Vindhya-GAJA (JV)
20074155
ROSHNABAD SVS
1
5
3593
2023
2038
2053
31-Mar-2025
18-Sep-2024
31-Dec-2024
13-May-2025
Approved
Ok..
Approved
ok
View
1134
Shahjahanpur
NCC Ltd.
20014018
Rpujari W/s
1
1
3010
2022
2037
2052
30-Sep-2023
31-Dec-2024
30-Dec-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Rujaari scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Rpujari scheme has been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1135
Ambedkar Nagar
Welspun Kaveri Infraprojects JV
20008677
Rukunpur Kasimpur
1
8
4912
2022
2037
2052
06-Jul-2023
27-Apr-2025
15-Jun-2024
28-Apr-2025
Approved
checked and found ok
Approved
Scheme completed
View
1136
Farrukhabad
Vindhya-GAJA (JV)
20091689
RUP NAGAR MVS
1
6
4096
2023
2038
2053
30-May-2025
04-Mar-2024
17-Jun-2024
18-Jun-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
1137
Kanpur Dehat
Indian Hume Pipe
20012976
Rurgaon
2
5
4400
2022
2037
2052
05-Feb-2022
31-Dec-2024
30-Jun-2023
01-Jul-2023
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
1138
Kanpur Dehat
GVPR
20053422
SABDALPUR
2
1
2040
2023
2038
2053
18-Nov-2023
23-Nov-2023
07-Apr-2024
08-Apr-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
1139
Etawah
Indian Hume Pipe
20024515
SABDALPUR DAUDPUR
3
5
2350
2022
2037
2052
22-Sep-2023
22-Mar-2024
27-Jun-2024
28-Jun-2024
Approved
Forwarded for further action.
Approved
All works are satisfactory.
View
1140
Bijnor
LC INFRA
8360409
SABDALPUR VILLAGE WATER SUPPLY SCHEME
1
1
2754
2022
2037
2052
23-Sep-2023
05-Dec-2023
08-Jun-2024
09-Jun-2024
Approved
every thing completed
Approved
Everything Completed
View
1141
Bijnor
LC INFRA
8360415
SABHACHANDPUR MOHAN (111972) GRAMPANCHAYAT WATER SUPPLY
1
1
1428
2022
2037
2052
29-Sep-2023
12-Dec-2023
12-Dec-2023
13-Dec-2023
Approved
Every thing completed
Approved
Everything Completed
View
1142
Bijnor
LC INFRA
20095656
SADAKPUR VILLAGE WSS
1
1
2518
2022
2037
2052
03-Apr-2023
23-Oct-2024
23-Oct-2024
24-Oct-2024
Approved
Every thing complete.
Approved
All document complete
View
1143
Bijnor
LC INFRA
20011786
Saddovar Bila Ahatmali Village Water Supply Scheme
2
1
3379
2022
2037
2052
09-Feb-2022
11-Dec-2023
09-Jun-2024
10-Jun-2024
Approved
every thing completed
Approved
Everything Completed
View
1144
Kanpur Dehat
VSA
20094256
Sadhuapur
2
2
1986
2023
2038
2023
30-Apr-2023
31-Dec-2023
15-Apr-2024
16-Apr-2024
Approved
forward for further action and refer to our letter SWSM/BLG/TPI/KD/P-3/L-6759 DT.29-09-2025. Balance work complete within one week as assure by TKC representative .
Approved
All work of scheme found satisfactory
View
1145
Amethi
Gayatri Projects LTD
20098293
SADIPUR WATER SUPPLY SCHEME
1
3
2882
2022
2037
2052
27-May-2025
07-Sep-2024
13-Dec-2024
15-Mar-2025
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance...
View
1146
Meerut
Power Mech Projects Ltd
20012824
SADULLAPUR URF CHANDPURA
1
1
3061
2022
2037
2052
31-Dec-2024
19-Dec-2022
08-May-2023
26-Dec-2024
Approved
Recommended for further Approval
Approved
approved
View
1147
Shahjahanpur
NCC Ltd.
20019697
Saftyara
1
2
2740
2022
2037
2052
31-Aug-2023
31-Dec-2024
30-Nov-2023
16-Nov-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of SAFTYARA scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Saftyara scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1148
Ambedkar Nagar
Vindhya-GAJA (JV)
20047661
SAHABUDDINPUR Water Supply Scheme
1
2
2310
2023
2038
2053
19-Sep-2023
21-Mar-2025
21-Mar-2025
22-Mar-2025
Approved
CHECKED AND FOUND OK
Approved
Scheme completed
View
1149
Bijnor
LC INFRA
20087919
Sahapur Sukkha Village Water Supply Scheme
2
2
1578
2022
2037
2052
13-Mar-2023
18-Jul-2024
19-Oct-2024
20-Oct-2024
Approved
Every thing complete.
Approved
Everything is Completed.
View
1150
Ambedkar Nagar
Vindhya-GAJA (JV)
20026097
SAHJANA HAMJAPUR WATER SUPPLY SCHEME
1
2
4320
2023
2038
2053
28-Sep-2023
14-Aug-2024
05-Dec-2024
06-Dec-2024
Approved
Checked and found ok
Approved
SCHEME COMPLETED
View
1151
Shahjahanpur
NCC Ltd.
20018013
Sahora
2
2
2910
2022
2037
2052
09-Aug-2023
31-Dec-2024
08-Nov-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Sahora scheme have been checked and verified. The submitted records are recommended and forwarded for further
Approved
All information on the portal for the completion certificate of Sahora scheme has been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1152
Bijnor
Vindhya-GAJA (JV)
20021786
Sahrifpur Gram Panchayat Water Supply
3
3
2742
2023
2038
2053
06-Jul-2023
10-Oct-2024
10-Apr-2025
11-Apr-2025
Approved
Every thing complete.
Approved
Everything complete
View
1153
Kannauj
GVPR
20077108
SAHROI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
5
2764
2023
2038
2053
08-Sep-2024
22-Apr-2024
26-Jul-2024
27-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1154
Ambedkar Nagar
Vindhya-GAJA (JV)
20058740
SAIDPUR RASEEDPUR WSS
4
16
4420
2023
2038
2053
26-Dec-2023
28-Jun-2025
21-Oct-2025
22-Oct-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme Completed
View
1155
Bijnor
LC INFRA
20076114
SAIFPUR BANGAR WATER SUPPLY SCHEME
4
4
1605
2022
2037
2052
03-Feb-2023
16-Dec-2024
16-Dec-2024
17-Dec-2024
Approved
Every thing complete.
Approved
Every thing is completed.
View
1156
Sultanpur
UNIVERSAL MEP
20066432
SAINI GRAM PANCHAYAT WATER SUPPLY SCHEME
3
5
3200
2023
2038
2053
12-Jan-2024
12-Jan-2024
02-Dec-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
1157
Kanpur Dehat
Indian Hume Pipe
20012636
Saintha
1
4
4300
2022
2037
2052
13-Oct-2021
12-Oct-2022
31-Aug-2023
01-Sep-2023
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
1158
Amethi
Vindhya-GAJA (JV)
20085696
SAITHA WATER SUPPLY SCHEME
1
19
5011
2023
2038
2053
29-Apr-2024
30-Jun-2025
15-Mar-2025
16-Jun-2025
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance..
View
1159
Gautam Buddha Nagar
LC INFRA
20013504
SAITHALI W/S SCHEME
1
1
3799
2022
2037
2052
07-Feb-2024
01-Dec-2024
01-Sep-2024
01-Dec-2024
Approved
Project certificate is verified
Pending
View
1160
Kannauj
GVPR
20036477
SAKARBABA & TILAK SARAI & BHAWANI SARAI
3
8
6110
2023
2038
2053
13-May-2024
25-Mar-2024
27-Jun-2024
28-Jun-2024
Approved
forwarded for further action
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1161
Bijnor
LC INFRA
20011779
Saktalpur Milak Water Supply Scheme
2
2
2870
2022
2037
2052
10-Feb-2022
09-Aug-2024
09-Aug-2024
10-Aug-2024
Approved
Every thing completed
Approved
Everything is completed
View
1162
Ghaziabad
LC INFRA
20096363
SAKURPUR VILLAGE WATER SUPPLY SCHEME
1
1
4120
2022
2037
2052
09-Feb-2022
30-Sep-2024
31-Jan-2025
01-Mar-2025
Approved
Satisfactory on the work. All civil works and E&M works are completed.
Approved
All documents find satisfactory
View
1163
Ambedkar Nagar
Vindhya-GAJA (JV)
20100682
Salahuddinpur Water Supply Scheme
1
2
1610
2023
2038
2053
17-May-2024
24-Nov-2024
24-Feb-2025
25-Feb-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme completed
View
1164
Bijnor
LC INFRA
20051674
SALAIMPUR
1
1
2670
2022
2037
2052
03-Dec-2022
25-Mar-2025
25-Mar-2025
26-Mar-2025
Approved
Every thing complete.
Approved
Everything Completed.
View
1165
Auraiya
GVPR
20025228
Salaiya PWS
3
2
3510
2023
2038
2053
26-Sep-2022
25-Sep-2023
08-Jun-2023
01-Nov-2024
Approved
Forwarded for further action.
Approved
All work of scheme fond satisfactory.
View
1166
Ambedkar Nagar
Vindhya-GAJA (JV)
20059385
SALARPUR Water Supply Scheme
2
3
2230
2023
2038
2053
26-Dec-2023
27-Nov-2024
27-Feb-2025
28-Feb-2025
Approved
checked and verified and found OK
Approved
Scheme completed
View
1167
Ayodhya
VSA
20061583
SALARPUR WSS
1
2
2260
2023
2038
2053
20-Feb-2024
04-Jul-2024
04-Jul-2024
03-Feb-2025
Approved
FOUND OK
Pending
View
1168
Shahjahanpur
NCC Ltd.
8362103
SALEMPUR BUZURG GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME
4
4
2000
2022
2037
2052
31-Dec-2024
30-Sep-2023
30-Dec-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Salempur Buzurg scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Salempur Bujurg scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1169
Kannauj
GVPR
20067697
SALEMPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
2
2
2595
2023
2038
2053
15-Jun-2024
07-Apr-2024
11-Jul-2024
12-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1170
Kanpur Dehat
GVPR
20053528
SALEMPUR MAHERA1
2
0
4201
2023
2038
2053
18-Nov-2023
22-Oct-2023
06-Mar-2024
07-Mar-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
1171
Auraiya
GVPR
20040107
Salempur PWS
1
2
2693
2023
2038
2053
06-Jan-2022
31-Dec-2024
23-Apr-2024
25-Apr-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1172
Kannauj
GVPR
20050184
SALEMPUR TARA BANGER GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
2038
2023
2038
2053
15-Jun-2024
28-Mar-2024
30-Jun-2024
01-Jul-2024
Approved
forwarded for further action
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1173
Gautam Buddha Nagar
LC INFRA
20097860
SALEPUR VILLAGE WATER SUPPLY SCHEME
1
1
2401
2022
2037
2052
07-Feb-2024
15-Dec-2024
15-Sep-2024
15-Dec-2024
Approved
Project certificate is verified
Pending
View
1174
Auraiya
Indian Hume Pipe
20055881
Salhoopur PWS
1
3
1760
2022
2037
2052
22-Sep-2023
15-Jul-2023
19-Jul-2024
20-Jul-2024
Approved
Forwarded for further action.
Approved
All work of scheme fond satisfactory.
View
1175
Shahjahanpur
NCC Ltd.
20019652
SALLIA
2
2
3340
2022
2037
2052
31-Dec-2024
02-Sep-2024
02-Dec-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of SALLIA scheme have been checked and verified. The submitted records are recommended and forwarded for further.
As per SWSM letter no. 3331/SE/QAP/2023-24, dated- 26.10.2023. Instead of Single curved sheet TKC has used twins sheets During erection of Zi-Al Tanks, replace the same with in 15 days.
As per TKC undertaking letter no.NCC/DWSM/SHAHJAHANPUR /69/2025-26.TKC has assured the pendency of work will be completed by 15.09.25.
Approved
All information on the portal for the completion certificate of Sallia scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1176
Mau
LC INFRA
20012740
SAMANPURA, GP-WATER SUPPLY SCHEME
2
6
2109
2022
2037
2052
20-Mar-2024
10-Jan-2025
09-Jan-2025
10-Jan-2025
Approved
Approved
Approved
Approved..
View
1177
Meerut
Power Mech Projects Ltd
8362752
SAMASPUR
1
1
2450
2022
2037
2052
31-Dec-2024
12-Feb-2024
21-Apr-2023
25-Oct-2024
Approved
Recommended for further Approvals.
Approved
approved
View
1178
Meerut
Power Mech Projects Ltd
20020955
SAMASPUR (HASTINAPUR)
2
2
1723
2022
2037
2052
31-Dec-2024
15-Jun-2023
30-Jan-2023
30-Jan-2025
Approved
Recommended for further Approval
Approved
approved
View
1179
Ghaziabad
LC INFRA
20104991
SAMAYPUR VILLAGE WATER SUPPLY SCHEME
1
1
2131
2022
2033
2052
09-Feb-2022
30-Nov-2024
31-Mar-2025
01-Apr-2025
Approved
Satisfactory on the work. All Civil works and E&M works are completed.
Approved
All Work Completed
View
1180
Meerut
Power Mech Projects Ltd
20020246
SAMOLI SALEMPUR
1
1
5141
2022
2037
2052
04-Feb-2024
20-Sep-2024
06-Feb-2025
06-Apr-2025
Approved
Recommended for further Approval
Approved
approved
View
1181
Amethi
Vindhya-GAJA (JV)
20068050
SANAHA WATER SUPPLY SCHEME
1
2
2680
2023
2038
2053
01-Jun-2024
05-Nov-2024
09-Sep-2024
12-Aug-2024
Approved
Hardcopy submitted
Approved
All Things Are Found Satisfactory , Scheme is Finalized For Operation and Maintenance
View
1182
Kannauj
GVPR
20036125
SANDA GRAMIN PEYJAY YOJNA
3
5
3403
2023
2038
2053
13-May-2024
25-Mar-2024
27-Jun-2024
28-Jun-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1183
Kanpur Dehat
Indian Hume Pipe
20012576
Sangansiyapur
1
3
2880
2022
2037
2052
13-Oct-2021
12-Oct-2022
30-Sep-2023
01-Oct-2023
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
1184
Amethi
Vindhya-GAJA (JV)
20068350
SANGRAMPUR & GOOJIPUR WATER SUPPLY SCHEME
3
18
5465
2023
2038
2053
23-Mar-2024
30-Jun-2025
12-Mar-2025
13-Jun-2025
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance..
View
1185
Fatehpur
Power Mech Projects Ltd
20095909
SANGRAMPUR,BHAKRANA
3
4
4670
2023
2038
2058
15-May-2023
30-Jun-2025
18-Dec-2024
19-Dec-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of September(19.09.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
1186
Meerut
Power Mech Projects Ltd
20031790
SANOTA - PINAI - KUNDA
3
3
6832
2023
2038
2053
31-Dec-2024
05-Sep-2024
22-Jan-2025
23-Jan-2025
Approved
Recommended for further Approvals.
Approved
approved
View
1187
Auraiya
GVPR
20095107
Sanwaliya PWS
1
2
1643
2023
2038
2053
01-Jun-2024
06-Apr-2024
01-Mar-2024
19-Apr-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1188
Sultanpur
UNIVERSAL MEP
20066727
SARAI & BAGGA & TAUDHIKPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
2
9
4510
2023
2038
2053
12-Jan-2024
31-Dec-2024
11-Jan-2025
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
1189
Fatehpur
Power Mech Projects Ltd
20097755
SARAI IDRISH & LADLEPUR
2
4
3020
2023
2038
2058
14-May-2024
30-Jun-2025
11-Nov-2024
12-Nov-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of August(12.08.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
1190
Auraiya
Indian Hume Pipe
20022758
Sarai Khati Water Supply Scheme
1
3
1280
2022
2037
2052
08-May-2023
28-Dec-2023
31-Mar-2024
01-Jan-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1191
Ayodhya
UNIVERSAL MEP
20078591
SARAI PEER WSS
2
2
2110
2023
2038
2053
21-Jun-2024
04-Oct-2024
04-Oct-2024
01-Feb-2025
Approved
FOUND OK
Pending
View
1192
Auraiya
GVPR
20091164
Sarai pratham PWS
1
3
3125
2023
2038
2053
01-Jun-2024
04-May-2025
03-May-2025
05-May-2025
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1193
Kannauj
GVPR
20036655
SARAI SUNDAR & KUNWARPUR JANU GRAMIN PEYJAL YOJNA
3
7
4118
2023
2038
2053
15-Mar-2024
10-Apr-2024
13-Jul-2024
14-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1194
Kannauj
GVPR
20067284
SARAI THEKU GRAM PANCHAYAT WATER SUPPLY SCHEME
1
4
2658
2023
2038
2053
16-Aug-2024
22-Apr-2024
26-Jul-2024
27-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1195
Sultanpur
UNIVERSAL MEP
20066385
SARAIYA BHARTHI GRAM PANCHAYAT WATER SUPPLY SCHEME
3
13
2849
2023
2038
2053
12-Jan-2024
12-Jan-2024
01-Jul-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
1196
Gautam Buddha Nagar
LC INFRA
20097856
SARAKPUR VILLAGE WATER SUPPLY SCHEME
1
1
1080
2022
2037
2052
07-Feb-2024
10-Jan-2025
10-Oct-2024
10-Jan-2025
Approved
Project certificate is verified
Pending
View
1197
Meerut
Power Mech Projects Ltd
20037263
SARANPUR
2
2
2548
2022
2037
2052
31-Dec-2024
01-Feb-2024
19-Jun-2024
10-Oct-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
1198
Sultanpur
UNIVERSAL MEP
20066481
SARAV & MUDWA GRAM PANCHAYAT WATER SUPPLY SCHEME
5
14
5740
2023
2038
2053
12-Jan-2024
31-Dec-2024
31-Jan-2025
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
1199
Fatehpur
Power Mech Projects Ltd
20097905
Saray Mohan Salempur
3
3
2860
2023
2038
2053
20-Sep-2024
22-Oct-2024
22-Oct-2024
23-Oct-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of July (23.07.2024) and Regular water supply is given to the consumers.
Approved
Verify
View
1200
Kannauj
GVPR
20036511
SARDA MAI & DHARNIDHARPUR NAGARIYA GRAMIN PEYJAL YOJNA
2
12
5170
2023
2038
2053
13-May-2024
25-Mar-2024
27-Jun-2024
28-Jun-2024
Approved
FORWARDED FOR FURTHER ACTION
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
1201
Kannauj
GVPR
20077074
SARDAPUR & KUSKA GRAM PANCHAYAT WATER SUPPLY SCHEME
2
5
3156
2023
2038
2053
08-Sep-2024
22-Mar-2024
24-Jun-2024
25-Jun-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1202
Kanpur Dehat
Indian Hume Pipe
20012964
Sardarpur
2
2
3425
2022
2037
2052
05-Feb-2022
04-Feb-2022
31-Mar-2024
01-Apr-2024
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
1203
Bijnor
LC INFRA
20025878
Sareefpur Malakpur Water Supply Scheme
3
3
2930
2022
2037
2052
18-Aug-2022
03-Mar-2024
04-Jun-2024
05-Jun-2024
Approved
Every thing complete.
Approved
Every thing is completed.
View
1204
Etawah
Indian Hume Pipe
20015039
Sarekhipura
1
3
2130
2022
2037
2052
08-May-2023
03-Nov-2023
26-Mar-2024
25-Jun-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory
View
1205
Kanpur Dehat
Indian Hume Pipe
20025481
Sargaon Khurd
1
2
2750
2022
2037
2052
24-Aug-2022
31-Dec-2024
30-Oct-2024
01-Feb-2024
Approved
Forward for further action pls
Approved
All work of scheme found satisfactory
View
1206
Mau
GA INFRA-VPL
20093521
SARHASA ZAMIN SARHASA, PAHARPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
2
7
3550
2023
2038
2053
19-Mar-2025
19-Mar-2025
18-Mar-2025
19-Mar-2025
Approved
Approved
Approved
Approved
View
1207
Amethi
Vindhya-GAJA (JV)
20070856
SARIYA DUBAAN WATER SUPPLY SCHEME
1
9
2190
2023
2033
2053
07-Feb-2024
23-Dec-2024
23-Mar-2025
09-Jun-2025
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
View
1208
Raebareli
NCC Ltd.
20011086
Saroura GP Water Supply Scheme
1
3
2037
2022
2037
2052
16-Jul-2023
21-Jul-2024
08-Jan-2024
21-Nov-2024
Approved
Ok
Approved
Ok
View
1209
Farrukhabad
Vindhya-GAJA (JV)
20075398
SARPARPUR, RASIDPUR TARAI & UGARPUR MVS
4
10
4735
2023
2038
2053
31-Mar-2025
02-Apr-2024
31-Jul-2024
01-Aug-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
1210
Meerut
Power Mech Projects Ltd
20020253
SARSWA
1
1
3773
2022
2037
2052
31-Dec-2024
25-Sep-2024
11-Feb-2025
12-Feb-2025
Approved
Recommended for further Approvals.
Approved
approved
View
1211
Fatehpur
Power Mech Projects Ltd
20102039
SARWAL
1
1
1726
2023
2038
2053
21-Sep-2023
03-Jan-2025
24-May-2025
25-May-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of February(25.2.2025) and Regular water supply is given to the consumers.
Approved
Verified
View
1212
Fatehpur
Power Mech Projects Ltd
20097832
SATO JOGA
1
5
4900
2023
2038
2053
25-Oct-2024
16-Jan-2025
15-Jan-2025
16-Jan-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of October (16.10.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
1213
Fatehpur
Power Mech Projects Ltd
20097536
SATO PEET
1
3
2550
2023
2038
2053
20-Sep-2024
23-Apr-2025
23-Apr-2025
24-Apr-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of January ( 24.01.2025) and Regular water supply is given to the consumers.
Approved
Verify
View
1214
Kannauj
GVPR
20067330
SATOURA GRAM PANCHAYAT WATER SUPPLY SCHEME
1
3
5356
2023
2038
2053
16-Aug-2024
13-Apr-2024
16-Jul-2024
17-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1215
Ambedkar Nagar
Vindhya-GAJA (JV)
20072736
SATRAHI WSS
1
4
2685
2023
2038
2053
22-Mar-2024
05-Apr-2025
05-Apr-2025
06-Apr-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme completed
View
1216
Meerut
Power Mech Projects Ltd
20010916
SATWAI
2
1
3992
2022
2037
2052
16-Jul-2023
14-Mar-2023
01-Aug-2023
13-Dec-2024
Approved
Recommended for further Approval
Approved
approved
View
1217
Amethi
Vindhya-GAJA (JV)
20066500
SAUNA WATER SUPPLY SCHEME
1
4
2965
2023
2038
2053
22-Dec-2023
29-Dec-2024
29-Mar-2025
30-Jun-2025
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
View
1218
Kannauj
GVPR
20099738
SAURIKH DEHAT GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
3454
2023
2038
2053
16-Aug-2024
16-Apr-2024
19-Jul-2024
20-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1219
Ayodhya
UNIVERSAL MEP
20030225
SEEWAN GRAM PANCHAYAT WATER SUPPLY SCHEME
1
3
2640
2023
2038
2053
12-Oct-2023
11-Dec-2023
11-Dec-2023
30-Nov-2024
Approved
FOUND OK
Pending
View
1220
Auraiya
GVPR
20065273
Seganputta & jalupurPWS
3
5
821
2023
2038
2053
01-Jun-2024
18-Jan-2025
17-Jan-2025
20-Jan-2025
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1221
Fatehpur
Power Mech Projects Ltd
20095915
SEMARI
2
7
3840
2023
2038
2053
25-Sep-2024
30-Jun-0020
11-Nov-2024
12-Nov-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of August (12.08.2024)
Approved
Verified
View
1222
Bahraich
PNC-SPML-JV
20020733
SEMRAUNA VISESHWARGANJ PWS
1
2
8653
2022
2037
2052
31-Dec-2025
21-Aug-2025
21-Aug-2025
22-Aug-2025
Approved
scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/08/1953 kindly complete it.
Approved
SCHEME COMPLETED
View
1223
Meerut
Power Mech Projects Ltd
8362763
SET KUAN
1
1
1734
2022
2037
2052
31-Dec-2024
05-Jan-2023
24-May-2023
17-Dec-2024
Approved
Recommended for Further Approval
Approved
approved
View
1224
Ambedkar Nagar
Vindhya-GAJA (JV)
20026061
SETHA KALA WATER SUPPLY SCHEME
2
7
4530
2023
2038
2053
28-Sep-2023
12-Feb-2024
30-Jun-2024
01-Jul-2024
Approved
Checked and found ok
Approved
Scheme completed
View
1225
Hardoi
NCC Ltd.
20085610
SEVA
1
2
1710
2022
2037
2052
26-Jul-2023
28-Feb-2023
27-May-2023
24-Dec-2024
Approved
ok
Approved
OK
View
1226
Sultanpur
UNIVERSAL MEP
20066347
SEWARA WATER SUPPLY SCHEME
3
21
4940
2023
2038
2053
12-Jan-2024
31-Dec-2024
11-Jan-2025
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
1227
Sultanpur
UNIVERSAL MEP
20064745
SHADIPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
3640
2023
2038
2053
12-Jan-2024
12-Jan-2024
29-Mar-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
1228
Bijnor
LC INFRA
8361240
SHADIPUR GRAMPANCHAYAT WATER SUPPLY SCHEME
2
2
5063
2022
2037
2052
24-Sep-2023
11-Feb-2024
10-Aug-2024
11-Aug-2024
Approved
Every thing complete.
Approved
All Documents checked and verified
View
1229
Bijnor
LC INFRA
20012936
SHADIPUR KALAN WATER SUPPLY SCHEME
1
2
2359
2022
2037
2052
02-Nov-2023
18-Jan-2024
24-Jul-2024
25-Jul-2024
Approved
every thing completed.
Approved
Everything Completed
View
1230
Meerut
Power Mech Projects Ltd
20031852
SHAH KULIPUR - MANPUR
2
2
4274
2023
2038
2053
31-Dec-2024
12-Mar-2024
30-Jul-2024
21-Apr-2025
Approved
Recommended for further Approval
Approved
approved
View
1231
Kannauj
GVPR
20067689
SHAH NAGAR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
2762
2023
2038
2053
08-Sep-2024
13-Apr-2024
16-Jul-2024
17-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1232
Bijnor
LC INFRA
20051664
SHAHABPURA
1
1
3563
2022
2037
2052
03-Dec-2022
16-Nov-2024
16-Nov-2024
17-Nov-2024
Approved
Every thing complete.
Approved
Every thing is completed.
View
1233
Bijnor
LC INFRA
20087918
Shahabpura Ratan Singh Village Water Supply Scheme
3
3
6354
2022
2037
2052
13-Mar-2025
15-Apr-2024
23-Aug-2024
24-Aug-2024
Approved
every thing completed.
Approved
Every thing is completed
View
1234
Bijnor
LC INFRA
8361855
SHAHADPUR GULAL VILLAGE WATER SCHEME
1
1
2282
2022
2037
2052
13-Apr-2023
08-Jul-2024
15-Jan-2025
16-Jan-2025
Approved
Everything Complete.
Approved
Everything Complete.
View
1235
Ayodhya
UNIVERSAL MEP
20030398
SHAHBAZPUR & PHELSANDA GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME
3
5
3220
2023
2038
2053
12-Oct-2023
20-Aug-2023
20-Aug-2023
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
1236
Kanpur Dehat
GVPR
20070706
Shahi
1
3
1299
2023
2038
2053
17-Feb-2024
18-Dec-2023
23-Mar-2024
24-Apr-2024
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
1237
Fatehpur
Power Mech Projects Ltd
20100816
SHAHIPUR
2
3
1820
2023
2038
2053
20-Sep-2024
25-Sep-2024
24-Sep-2024
25-Sep-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of June (25.06.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
1238
Kannauj
GVPR
20077128
SHAHJAHANPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
2034
2023
2038
2053
08-Sep-2024
04-Apr-2024
07-Jul-2024
08-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1239
Bijnor
LC INFRA
20087653
Shahlipur Abdul Sattar water supply scheme
1
1
2769
2022
2037
2052
30-Mar-2025
30-Mar-2025
30-Mar-2025
01-Apr-2025
Approved
Every thing completed
Approved
Every thing completed
View
1240
Ayodhya
UNIVERSAL MEP
20030565
SHAHPUR & PARSAU & KOPEYPUR GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME
3
5
6140
2023
2038
2053
12-Oct-2023
19-Feb-2024
19-Feb-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
1241
Kanpur Dehat
GVPR
20077347
shahpur derapur
2
5
3160
2023
2038
2053
17-Feb-2024
20-Dec-2023
04-May-2024
05-May-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
1242
Fatehpur
Power Mech Projects Ltd
20102044
SHAHPUR HARDASPUR
1
1
1830
2023
2038
2053
20-Sep-2024
20-Sep-2024
02-Sep-2024
03-Sep-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of June (03.06.2024) and Regular water supply is given to the consumers.
Approved
Verify
View
1243
Meerut
Power Mech Projects Ltd
20020950
SHAHPUR PIRPUR
3
3
2652
2022
2037
2052
31-Dec-2024
13-Jun-2024
03-Nov-2024
04-Nov-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
1244
Meerut
Power Mech Projects Ltd
20037269
SHAHPUR ZADID
1
1
2710
2022
2037
2052
31-Dec-2024
22-Feb-2024
30-Apr-2024
09-Nov-2024
Approved
Recommended for further Approvals.
Approved
approved
View
1245
Ghaziabad
LC INFRA
20018261
SHAKAR PULLA PWS SCHEME
1
1
3007
2022
2037
2052
27-Aug-0201
30-Nov-2024
31-Mar-2025
01-Apr-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
All work completed
View
1246
Farrukhabad
Vindhya-GAJA (JV)
20075758
SHAMASPUR BHIKHARI & HASANPUR & LALAUR RAJPUTAN MVS
3
5
5127
2023
2038
2053
30-May-2025
08-Aug-2024
21-Nov-2024
22-Nov-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
1247
Kannauj
GVPR
20090109
SHARIFPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
2234
2023
2038
2053
08-Sep-2024
16-Apr-2024
19-Jul-2024
20-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1248
Meerut
Power Mech Projects Ltd
20031798
SHAZADPUR - LALPUR
2
2
2411
2023
2038
2053
31-Dec-2024
03-Jun-2024
20-Oct-2024
21-Oct-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
1249
Bijnor
LC INFRA
20097003
Sheh Village WSS
1
1
3476
2022
2037
2052
03-May-2025
10-Jun-2024
19-Dec-2024
20-Dec-2024
Approved
every thing completed
Approved
Everything is completed
View
1250
Bijnor
LC INFRA
20051715
SHEKHPUR LALA
2
2
3376
2022
2037
2052
03-Dec-2022
25-May-2025
25-May-2025
26-May-2025
Approved
Every thing complete.
Approved
complete check
View
1251
Ambedkar Nagar
Vindhya-GAJA (JV)
20041828
SHEKHPUR MALPURA WSS
1
5
5980
2023
2038
2053
23-Nov-2023
23-Dec-2024
02-Apr-2025
03-Apr-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme completed
View
1252
Amethi
Welspun Kaveri Infraprojects JV
20013338
ShekhPur Water Supply Scheme
2
6
2436
2022
2037
2052
10-Apr-2023
23-Aug-2024
23-Aug-2024
27-Jun-2025
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
Hardcopy submitted and found okay as per the submitted documents..
View
1253
Muzaffarnagar
Gayatri Projects LTD
20098062
SHEKHPURA GP RO WSS
1
2
11818
2023
2038
2053
16-Sep-2022
07-Oct-2024
08-Jan-2025
09-Jan-2025
Approved
The details given by the contractor are correct at the time of approval.
Approved
OK
View
1254
Meerut
Power Mech Projects Ltd
20011226
SHEKHPURI
1
1
1993
2022
2037
2052
31-Dec-2024
04-Jan-2023
25-May-2023
15-Nov-2024
Approved
Recommended for further Approvals..................
Approved
APPROVED
View
1255
Bijnor
LC INFRA
8388790
Shekhpuri Chaohad
1
2
2350
2022
2032
2052
29-Sep-2023
11-Dec-2023
09-Oct-2024
10-Oct-2024
Approved
Every thing completed.
Approved
All document complete
View
1256
Bijnor
LC INFRA
20017093
Sher Nagar Naraini Water Supply
3
3
1428
2022
2037
2052
09-Feb-2024
09-Dec-2023
07-Jun-2024
08-Jun-2024
Approved
Every thing completed.
Approved
Everything Completed
View
1257
Bijnor
LC INFRA
8388726
SHERGARH, BAHADAR NAGAR, TAIMOORABAD SAHALIPUR VILLAGE WATER SUPPLY SCHEME
4
4
3574
2022
2037
2052
30-Sep-2024
11-Dec-2023
09-Jun-2024
10-Jun-2024
Approved
Every thing complete.
Approved
All document checked
View
1258
Ghaziabad
LC INFRA
8360448
SHERPUR
1
1
4120
2022
2037
2052
01-Mar-2023
30-Nov-2021
31-Mar-2025
01-Apr-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
Approvd
View
1259
Bijnor
LC INFRA
20017183
SHERPUR BALLA WATER SUPPLY SCHEME
1
1
2890
2022
2037
2052
10-Feb-2024
10-Dec-2023
08-Jun-2024
09-Jun-2024
Approved
Every thing complete.
Approved
All document checked.
View
1260
Sultanpur
Vindhya-GAJA (JV)
20073749
SHERPUR PARS RAMPUR WATER SUPPLY SCHEME
2
2
1651
2023
2038
2053
05-Feb-2024
20-Dec-2024
25-Mar-2025
01-Aug-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
1261
Farrukhabad
Vindhya-GAJA (JV)
20091728
SHERPUR SARAI MVS
2
4
2212
2023
2038
2053
31-Mar-2025
17-Dec-2024
30-Mar-2025
01-Apr-2025
Approved
All the parameters of scheme verified can take in O&M
Approved
ok
View
1262
Auraiya
GVPR
20041743
Sherpur saraiya PWS
3
2
2796
2023
2038
2053
06-Jan-2022
28-Apr-2023
01-Feb-2024
19-Mar-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1263
Ghaziabad
LC INFRA
20021553
SHIKHAIDA HAJARI PWS SCHEME
1
1
2402
2022
2037
2052
09-Feb-2022
30-Sep-2024
31-Jan-2025
01-Feb-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
All work checked and recommended for O&M
View
1264
Hardoi
NCC Ltd.
8388423
SHIVRI
1
1
1930
2022
2037
2052
05-Mar-2023
20-Apr-2023
19-Jul-2023
25-Dec-2024
Approved
ok
Approved
OK
View
1265
Meerut
Power Mech Projects Ltd
20098532
SHODUTT-SHIVPURI
2
2
10245
2023
2038
2053
31-Jan-2025
24-Feb-2024
12-Jul-2024
10-Oct-2024
Approved
Recommended for further Approvals.
Approved
approved
View
1266
Muzaffarnagar
Gayatri Projects LTD
20098064
SHOROM GP RO WSS
1
2
9276
2023
2038
2053
16-Sep-2022
02-Dec-2024
21-Jun-2025
22-Jun-2025
Approved
The details given by the contractor are correct at the time of approval.
Pending
View
1267
Muzaffarnagar
Gayatri Projects LTD
20098066
SHUKRATAL GP RO WSS
2
2
24542
2023
2038
2053
16-Sep-2022
01-Oct-2024
31-Dec-2024
01-Jan-2025
Approved
The details given by the contractor are correct at the time of approval.
Approved
OK
View
1268
Amethi
Vindhya-GAJA (JV)
20098341
SHUKUL PUR Water Supply Scheme
1
2
1224
2023
2038
2053
20-Apr-2024
19-Jun-2024
19-Sep-2024
25-Dec-2024
Approved
Hardcopy submiited and all documents found okay..
Pending
View
1269
Bahraich
PNC-SPML-JV
20014678
SHYAMPUR NADAUNA CHITTAURA MVS PWS
2
6
6260
2022
2037
2052
30-Jun-2025
30-Apr-2025
30-Apr-2025
01-May-2025
Approved
Approved the as per TKC Contract Agreement.
Approved
Scheme Completed
View
1270
Gautam Buddha Nagar
LC INFRA
8361578
SIDIPUR VILLAGE WATER SUPPLY SCHEME
1
1
4770
2022
2037
2052
20-Mar-2023
31-Mar-2024
31-Oct-2024
01-Nov-2024
Approved
Project certificate is verified
Approved
verified
View
1271
Fatehpur
Power Mech Projects Ltd
20095919
SIHARI PATTI
2
3
2330
2023
2038
2053
13-Aug-2023
30-Jun-2025
07-Dec-2024
08-Dec-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of September (08.09.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
1272
Auraiya
GVPR
20091128
Sihauli PWS
1
3
1182
2023
2038
2053
06-Jan-2022
05-Mar-2024
30-Jan-2024
31-Jan-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1273
Hardoi
NCC Ltd.
20013193
SIKANDAR PUR
3
6
2160
2022
2037
2052
14-Jun-2023
25-Mar-2023
24-Jun-2023
25-Dec-2024
Approved
forwarded for O&M
Approved
OK
View
1274
Meerut
Power Mech Projects Ltd
20098180
SIKANDARPUR
1
1
745
2023
2038
2053
31-Dec-2024
24-Sep-2024
10-Feb-2025
11-Feb-2025
Approved
Recommended for Further Approval
Approved
Approved
View
1275
Hardoi
NCC Ltd.
20011167
SIKANDARPUR BAZAR
1
2
3780
2022
2037
2052
26-Jul-2023
20-Sep-2023
23-Dec-2023
13-Dec-2024
Approved
ok
Approved
OK
View
1276
Kanpur Dehat
GVPR
20077295
Sikandrapur Bilhaur & Gadaipur
3
6
2565
2023
2038
2053
17-Feb-2024
25-Nov-2023
09-Apr-2024
10-Apr-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
1277
Azamgarh
LC INFRA
8359685
SIKRAURA GRAM PANCHAYAT RURAL WATER SUPPLY SCHEME
1
3
5623
2022
2037
2052
24-Feb-2023
15-Nov-2023
18-Feb-2024
19-Feb-2024
Approved
OK
Approved
OK
View
1278
Kannauj
GVPR
20099301
SIKRORI GRAMM PANCHAYAT WATER SUPPLY SCHEME
1
1
1127
2023
2038
2053
14-Nov-2024
22-Apr-2024
26-Jul-2024
27-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1279
Kanpur Dehat
Indian Hume Pipe
20031465
Silhaula Buzurg
3
3
2550
2022
2037
2052
23-Sep-2022
31-Dec-2024
19-Aug-2023
20-Aug-2023
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
1280
Kanpur Dehat
Indian Hume Pipe
20050767
Simtamau
3
3
1880
2022
2037
2052
24-Nov-2022
31-Dec-2024
30-Jun-2023
01-Jul-2023
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
1281
Kannauj
GVPR
20090107
SINGARI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
1369
2023
2038
2053
08-Sep-2024
10-Nov-2024
14-Feb-2025
15-Feb-2025
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1282
Bahraich
PNC-SPML-JV
20099234
SINGARO PHAKARPUR RF PWS
1
5
2400
2022
2037
2052
31-Dec-2025
04-Oct-2025
04-Oct-2025
05-Oct-2025
Approved
Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/10/0460, kindly complete it.
Pending
View
1283
Mau
LC INFRA
20080877
SINGHASAN VILLAGE WATER SUPPLY SCHEME
2
4
2394
2022
2037
2052
26-Jan-2025
15-Jan-2025
14-Jan-2025
15-Jan-2025
Approved
Approved
Approved
Approved.
View
1284
Kannauj
GVPR
20090105
SINGHPUR & HARI NAGAR GRAM PANCHAYAT WATER SUPPLY SCHEME
3
3
3955
2023
2038
2053
08-Sep-2024
07-Apr-2024
11-Jul-2024
12-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1285
Amethi
Vindhya-GAJA (JV)
20101943
SINGTHEE WATER SUPPLY SCHEME
1
4
1290
2023
2038
2053
04-Jul-2024
16-Jun-2024
16-Sep-2024
17-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents.
Approved
Hardcopy submitted and found okay as per the submitted documents..
View
1286
Bijnor
LC INFRA
8360412
SINKRI BUZURG VILLAGE WATER SCHEME
1
1
2215
2022
2037
2052
14-Nov-2022
15-Jan-2025
15-Jan-2025
16-Jan-2025
Approved
Every thing complete
Approved
Every thing is completed.
View
1287
Azamgarh
LC INFRA
20101017
sirwan water supply scheme
1
7
3263
2023
2038
2053
22-Nov-2024
25-Aug-2024
28-Aug-2024
29-Aug-2024
Approved
OK
Approved
OK
View
1288
Kanpur Dehat
GVPR
20053382
Sisahi
1
2
2264
2023
2038
2053
18-Nov-2023
05-Oct-2023
21-Feb-2024
22-Feb-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
1289
Shahjahanpur
NCC Ltd.
20014899
Sisnai W/s
1
1
2340
2022
2037
2052
31-Aug-2023
31-Dec-2024
30-Nov-2023
16-Nov-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Sisnai scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Sisnai scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1290
Meerut
Power Mech Projects Ltd
20010942
SISOLA KHURD
1
1
2944
2022
2037
2052
31-Dec-2024
21-Apr-2023
05-Sep-2023
14-Dec-2024
Approved
Recommended for Further Approval
Approved
approved
View
1291
Meerut
Power Mech Projects Ltd
20019638
SISOLI
1
1
7240
2022
2037
2052
31-Dec-2024
23-May-2024
12-Oct-2024
13-Oct-2024
Approved
Recommended for further Approvals.........
Approved
Approved
View
1292
Shahjahanpur
NCC Ltd.
20077485
SISORI WSS
1
4
3080
2022
2037
2052
31-Dec-2024
10-Aug-2024
09-Nov-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Sisori scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Sisori scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1293
Kanpur Dehat
GVPR
20077293
Sithau Matana
2
6
3408
2023
2038
2053
17-Feb-2024
05-Jan-2024
09-Apr-2024
10-Apr-2024
Approved
TKC unable to submit the calibration certificate and other report for O&M, Our letter No.SWSM/BLG/TPI KD/O&M/2025-26/6655 dt.29/07/2028 & SWSM/BLG/TPI/KD/O&M/2025-26/6657 DT.30.07.2025. we can go to O&M through conditional, TKC submit the require document within 15 day's.
Approved
All work of scheme found satisfactory
View
1294
Ayodhya
UNIVERSAL MEP
20030603
SITHAULI GRAM PANCHAYAT WATER SUPPLY SCHEME
3
9
4880
2023
2038
2053
12-Oct-2023
22-Jan-2024
22-Jan-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
1295
Meerut
Power Mech Projects Ltd
20058321
SOHARKA & ANJAULI
2
2
2351
2023
2038
2053
31-Dec-2024
30-Mar-2024
17-Aug-2024
02-Mar-2025
Approved
Recommended for further Approval
Approved
approved
View
1296
Raebareli
NCC Ltd.
8360964
Soitha
3
3
2334
2022
2037
2052
06-Mar-2023
12-Jul-2023
12-Jul-2023
09-Dec-2024
Approved
Ok
Approved
Ok
View
1297
Amethi
Vindhya-GAJA (JV)
20065731
SONARI KALAN & AMTAHI WATER SUPPLY SCHEME
2
19
7074
2023
2038
2053
09-Jan-2024
07-Dec-2024
07-Mar-2025
08-Jun-2025
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
View
1298
Amethi
Vindhya-GAJA (JV)
20067972
SONARI KANOO WATER SUPPLY SCHEME
2
18
2474
2023
2038
2053
08-Feb-2024
18-Jun-2024
18-Sep-2024
19-Dec-2024
Approved
d All things found satisfactory in the Scheme and finalized for Operation And Maintenance
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance..
View
1299
Maharajganj
JMC - Lakshmi (JV)
20009558
Sonbarasa Gram Panchayat Water Supply Scheme
1
1
2075
2022
2037
2052
31-Dec-2024
26-Jul-2024
25-Oct-2024
01-Nov-2024
Approved
ok
Pending
correction required in amount
View
1300
Amethi
Welspun Kaveri Infraprojects JV
20012683
Songara Water Supply Scheme
2
6
2571
2022
2037
2052
10-Apr-2023
10-Jan-2024
13-Aug-2024
27-Jun-2025
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
Hardcopy submitted and found okay as per the submitted documents..
View
1301
Ambedkar Nagar
Vindhya-GAJA (JV)
20058306
SONGAWN WSS
1
6
3260
2023
2038
2053
26-Dec-2023
26-Dec-2024
26-Mar-2025
27-Mar-2025
Approved
checked and found ok
Approved
Scheme completed
View
1302
Ayodhya
VSA
20061625
SONWARSA MAFI W/S
3
5
6400
2023
2038
2053
20-Feb-2024
05-Feb-2025
05-Feb-2025
06-May-2025
Approved
FOUND OK
Pending
View
1303
Ambedkar Nagar
Vindhya-GAJA (JV)
20072514
SUBARPUR WSS
1
3
2180
2023
2038
2053
15-Mar-2024
30-Apr-2025
30-Apr-2025
01-May-2025
Approved
SCHEME COMPLETED AND READY FOR O&M
Approved
Scheme completed
View
1304
Farrukhabad
Vindhya-GAJA (JV)
20080826
SUBHAN PUR SVS
1
1
2492
2023
2038
2053
31-Mar-2025
03-Feb-2025
03-Feb-2025
04-Feb-2025
Approved
All the parameters ok
Approved
OK
View
1305
Fatehpur
Power Mech Projects Ltd
20100803
SUDANPUR
2
3
1640
2023
2038
2058
14-Aug-2023
30-Jun-2025
09-Sep-2024
12-Sep-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of September (09.09.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
1306
Kanpur Dehat
GVPR
20053434
SUDERPUR GAJEN
2
0
2623
2023
2038
2053
18-Nov-2023
01-Dec-2023
11-Mar-2024
12-Mar-2024
Approved
TKC unable to submit the calibration certificate and other report for O&M, Our letter No.SWSM/BLG/TPI/KD/O&M/2025-26/6655 dt.29/07/2028. we can go to O&M through conditional, TKC submit the require document within 15 day's.
Approved
All work of scheme found satisfactory
View
1307
Shahjahanpur
NCC Ltd.
20016435
Sujatpur
1
1
2440
2022
2037
2052
09-Aug-2023
31-Dec-2024
09-Nov-2023
16-Nov-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Sujatpur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Sujatpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1308
Mau
LC INFRA
20032906
SULTANIPUR GRAM PANCHAYAT RURAL WATER SUPPLY SCHEME
5
8
2880
2022
2037
2052
02-Nov-2023
25-Mar-2025
28-Aug-2024
25-Mar-2025
Approved
All Documents verified & Checked
Approved
Approved..
View
1309
Varanasi
Larsen & Toubro Ltd
20009677
SULTANPUR
1
4
2444
2022
2037
2052
09-May-2023
23-Jan-2024
30-Sep-2024
01-Oct-2024
Approved
Approve
Approved
Approved
View
1310
Bijnor
LC INFRA
8388812
SULTANPUR KHADAR VILLAGE WATER SCHEME
2
2
2237
2022
2037
2052
30-Sep-2024
12-Dec-2023
10-Jun-2024
11-Jun-2024
Approved
Every thing completed.
Approved
Everything Complete.
View
1311
Fatehpur
Power Mech Projects Ltd
20097537
SULTANPUR SATO
1
3
1850
2023
2038
2053
20-Sep-2024
11-Oct-2024
11-Oct-2024
12-Oct-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of July (12.07.2024) and Regular water supply is given to the consumers.
Approved
Verify
View
1312
Kannauj
GVPR
20050204
SULTAPUR & SHANKARPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
2
4
2960
2023
2038
2053
15-Jun-2024
10-Mar-2024
14-Jun-2024
15-Jun-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
1313
Farrukhabad
Vindhya-GAJA (JV)
20092998
SUNDERPUR MVS
1
9
1960
2023
2038
2053
30-May-2025
28-Feb-2024
12-Jun-2024
13-Jun-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
1314
Bijnor
LC INFRA
20018328
Sungarpur Water Supply Scheme
1
1
2083
2022
2037
2052
10-Feb-2022
26-Apr-2024
07-Nov-2024
08-Nov-2024
Approved
Every thing complete.
Approved
Every thing complete.
View
1315
Kanpur Dehat
Indian Hume Pipe
20064924
Surasi
3
4
3430
2022
2037
2052
11-Jan-2024
31-Dec-2024
31-Aug-2023
01-Sep-2023
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
1316
Ambedkar Nagar
Vindhya-GAJA (JV)
20035148
SURJUPUR WSS
4
4
2910
2023
2038
2053
21-Oct-2023
08-Sep-2024
19-Mar-2025
20-Mar-2025
Approved
Checked and Veryfied
Approved
Scheme completed
View
1317
Bahraich
PNC-SPML-JV
20014669
SUSRAULI CHITTAURA PWS
1
4
3509
2022
2037
2052
28-Feb-2025
28-Jan-2025
30-Oct-2023
28-Jan-2025
Approved
ok
Approved
Scheme completed ready for O&M
View
1318
Shahjahanpur
NCC Ltd.
20105023
SUTHA GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME
2
2
2745
2022
2037
2052
30-Sep-2023
31-Dec-2024
30-Dec-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Sutha scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Sutha scheme has been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1319
Mau
LC INFRA
20064779
Suwah Gram Panchayat Water Supply Scheme
2
3
1940
2022
2037
2052
29-Jun-2024
02-Apr-2025
01-Apr-2025
02-Apr-2025
Approved
Approved
Approved
Approved.
View
1320
Bijnor
LC INFRA
20075940
SUWAHERI KHURD WATER SUPPLY SCHEME
1
1
1890
2022
2037
2052
22-Dec-2023
23-Dec-2022
15-Nov-2024
16-Nov-2024
Approved
Every thing completed
Approved
ALL WORK COMPLETED
View
1321
Bijnor
LC INFRA
20011564
Taharpur Madad Imam Village Water Supply Scheme
1
3
1856
2022
2037
2052
10-Feb-2024
07-Dec-2023
10-Jun-2024
11-Jun-2024
Approved
All works completed
Approved
Everything Completed
View
1322
Farrukhabad
Vindhya-GAJA (JV)
20077864
TAJPUR & KUMHAULI MVS
2
4
3289
2023
2038
2053
30-May-2025
02-Mar-2024
15-Jun-2024
16-Jun-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
1323
Auraiya
GVPR
20089658
Tajpur Chhonk PWS
1
1
2550
2023
2033
2053
06-Jan-2022
30-Aug-2023
13-Jul-2024
30-Aug-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1324
Kanpur Dehat
GVPR
20025234
TAJPUR TARSOLI
2
4
4377
2023
2038
2053
26-Sep-2023
12-Oct-2023
12-Mar-2024
13-Mar-2024
Approved
Forward for further action pls
Approved
All work of scheme found satisfactory
View
1325
Ambedkar Nagar
Vindhya-GAJA (JV)
20067460
TAJPUR Water Supply Scheme
4
8
3460
2023
2038
2053
20-Feb-2024
25-Jan-2025
26-Apr-2025
27-Apr-2025
Approved
checked and verified and found OK
Approved
Scheme completed
View
1326
Sultanpur
UNIVERSAL MEP
20066724
TAKARIYA & NONARA GROUP OF GRAM PANCHAYAT WATER SUPPLY SCHEME
2
2
3310
2023
2038
2053
12-Jan-2024
31-Dec-2024
30-Jan-2025
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
1327
Meerut
Power Mech Projects Ltd
20020942
TAKHAWALI
2
2
2733
2022
2037
2052
31-Dec-2024
14-Jan-2024
03-Jun-2024
20-Jan-2025
Approved
Recommended for further Approval
Approved
approved
View
1328
Ayodhya
UNIVERSAL MEP
20030048
TALAGAON GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
3210
2023
2038
2053
12-Oct-2023
11-Sep-2023
11-Sep-2023
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
1329
Auraiya
GVPR
20041713
Talehpur
3
4
3075
2023
2038
2053
06-Jan-2022
29-May-2024
28-May-2024
29-May-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1330
Farrukhabad
Vindhya-GAJA (JV)
20091788
TANDA BAHRAMPUR MVS
3
3
2276
2023
2038
2053
30-May-2025
22-May-2024
22-May-2024
23-May-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
1331
Ayodhya
UNIVERSAL MEP
20030149
TANDA KHULASA GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
2700
2023
2038
2053
12-Oct-2023
15-Oct-2023
15-Oct-2023
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
1332
Ayodhya
UNIVERSAL MEP
20058287
Tandava WSS
2
5
2610
2023
2038
2053
22-Jan-2024
09-May-2024
09-May-2024
01-Feb-2025
Approved
FOUND OK
Pending
View
1333
Amethi
Vindhya-GAJA (JV)
20068083
TARA PUR WATER SUPPLY SCHEME
2
5
1719
2023
2038
2053
29-Apr-2024
07-Nov-2024
07-Feb-2025
09-May-2025
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
1334
Mau
LC INFRA
20011928
TARAI DIH GP WATER SUPPLY SCHEME
3
8
1957
2022
2037
2052
20-Mar-2024
22-Jan-2025
22-Jan-2025
25-Jan-2025
Approved
Approved.
Approved
Approved.
View
1335
Mau
LC INFRA
20098943
TARANPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
1360
2022
2037
2052
26-Sep-2024
01-Apr-2025
01-Apr-2025
02-Apr-2025
Approved
Ok
Approved
approve
View
1336
Meerut
Power Mech Projects Ltd
8362955
TARAPUR
3
3
4006
2022
2037
2052
31-Dec-2024
17-Jul-2023
03-Dec-2023
11-Apr-2025
Approved
Recommended for further Approval
Approved
approved
View
1337
Bahraich
PNC-SPML-JV
20100941
TARAPUR KHURD TEJWAPUR RF PWS
1
8
6490
2022
2037
2052
31-Dec-2025
15-Oct-2025
14-Nov-2023
16-Oct-2025
Approved
Scheme completed, minnor observation is identified, kindly complete it.
Pending
View
1338
Gautam Buddha Nagar
LC INFRA
20013497
TATARPUR W/S SCHEME
1
1
2222
2022
2037
2052
20-Sep-2023
30-Oct-2023
31-Oct-2024
01-Nov-2024
Approved
Project certificate is verified
Approved
Work completed. O&M Started
View
1339
Farrukhabad
Vindhya-GAJA (JV)
20097999
tatia nibal wss
2
3
1483
2023
2038
2053
31-Mar-2025
10-Feb-2025
25-May-2025
26-May-2025
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
1340
Meerut
Power Mech Projects Ltd
20066787
TATINA
1
1
2444
2022
2037
2052
31-Dec-2024
20-Jun-2024
06-Nov-2024
21-Jan-2025
Approved
Recommended for further Approval
Approved
approved
View
1341
Meerut
Power Mech Projects Ltd
20098116
TATINA SAINI
1
1
2101
2019
2038
2053
31-Dec-2024
28-Jun-2024
16-Nov-2024
01-Jan-2025
Approved
Recommended for further Approvals.
Approved
Approved
View
1342
Ayodhya
UNIVERSAL MEP
20030397
TEEKAR AND SHAH PUR GRAM PANCHAYAT WATER SUPPLY SCHEME
2
3
2100
2023
2038
2053
12-Oct-2023
10-Oct-2023
10-Oct-2023
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
1343
Azamgarh
LC INFRA
20066376
Tekmalpur water supply
2
4
2319
2023
2038
2053
03-Aug-2024
23-Jul-2024
26-Oct-2024
27-Oct-2024
Approved
OK
Approved
OK
View
1344
Amethi
Vindhya-GAJA (JV)
20066593
TENDUA WATER SUPPLY SCHEME
1
3
2836
2023
2038
2053
06-Jan-2024
12-Jun-2024
12-Sep-2024
15-Dec-2024
Approved
Hardcopy submiited and all documents found okay..
Pending
View
1345
Amethi
Vindhya-GAJA (JV)
20098333
TENWASI Water Supply Scheme
1
5
1731
2023
2038
2053
24-Apr-2024
27-Dec-2024
27-Mar-2025
28-Jun-2025
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance..
View
1346
Sultanpur
Gayatri Projects LTD
20015265
TERAAYEN WATER SUPPLY SCHEME
3
3
4050
2022
2037
2052
01-Sep-2024
12-Aug-2025
31-May-2024
13-Aug-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Pending
View
1347
Hardoi
NCC Ltd.
20011452
TERIA
1
1
2130
2022
2037
2052
26-Jul-2023
20-Mar-2023
20-Jul-2023
25-Nov-2024
Approved
OK
Approved
OK
View
1348
Fatehpur
Power Mech Projects Ltd
20097484
TEUJA
1
1
2690
2023
2038
2053
13-Aug-2024
30-Jun-2025
12-Jan-2025
13-Jan-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of October (13.10.2024)
Approved
Verified
View
1349
Auraiya
GVPR
20084727
Teurlal pur & babayan
1
9
3918
2023
2038
2053
06-Jan-2022
31-Dec-2024
31-Dec-2024
02-Jan-2025
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1350
Auraiya
Indian Hume Pipe
20014502
THAKUR GOAN
2
3
2950
2022
2037
2052
08-May-2023
25-Apr-2023
14-Aug-2023
01-Sep-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1351
Hardoi
NCC Ltd.
20012132
THATHIYA NARAINMAU
2
5
3020
2022
2037
2052
14-Jun-2023
06-Jun-2024
05-Sep-2024
24-Dec-2024
Approved
ok
Approved
OK
View
1352
Ambedkar Nagar
Vindhya-GAJA (JV)
20026062
THATTA WATER SUPPLY SCHEME
3
16
5040
2023
2038
2053
28-Sep-2023
23-Dec-2024
23-Mar-2025
24-Mar-2025
Approved
Scheme completed and ready for O&M
Approved
CHECKED AND FOUND OK
View
1353
Kanpur Dehat
GVPR
20099719
Thenamau
1
0
1069
2023
2038
2053
11-May-2024
01-Jan-2024
15-Apr-2024
16-Apr-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
1354
Amethi
Vindhya-GAJA (JV)
20085700
THENGHA WATER SUPPLY SCHEME
1
10
4948
2023
2038
2053
20-Mar-2024
17-Jun-2024
17-Sep-2024
18-Dec-2024
Approved
Hardcopy submiited and all documents found okay..
Pending
View
1355
Ayodhya
UNIVERSAL MEP
20092406
THEWGA WSS
2
3
2165
2023
2038
2053
21-Jun-2024
08-Dec-2024
08-Dec-2024
01-Feb-2025
Approved
FOUND OK
Pending
View
1356
Meerut
Power Mech Projects Ltd
20020261
THIROT
1
1
2185
2023
2037
2052
31-Dec-2024
05-Nov-2023
23-Mar-2024
20-Jan-2025
Approved
Recommended for further Approval
Approved
approved
View
1357
Bijnor
LC INFRA
8360404
THURELA VILLAGE WATER SCHEME
1
1
2201
2022
2037
2052
30-Sep-2023
12-Dec-2023
10-Jun-2024
11-Jun-2024
Approved
Every thing complete
Approved
Everything Completed.
View
1358
Shahjahanpur
NCC Ltd.
20016387
TIHAR AJANPUR
3
3
3155
2022
2037
2052
09-Aug-2023
31-Dec-2024
08-Nov-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Tihar Ajanpur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Tihar Ajanpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1359
Sultanpur
Gayatri Projects LTD
20011984
Tikar
1
1
2820
2022
2037
2052
01-Sep-2024
12-Aug-2025
31-May-2024
13-Aug-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Pending
View
1360
Amethi
Vindhya-GAJA (JV)
20098346
Tikariya Water Supply Scheme
1
13
2451
2023
2038
2053
16-May-2023
16-Dec-2024
16-Mar-2025
17-Jun-2025
Approved
Hardcopy submitted and found okay as per the submitted documents.
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance..
View
1361
Jhansi
NCC Ltd.
8009966
Tilaitha GOV
25
6468
45923
2023
2038
2053
30-Jun-2022
30-Aug-2023
19-Nov-2024
20-Nov-2024
Approved
Checked
Approved
Checked and Approved
View
1362
Auraiya
GVPR
20084719
Tilakpur Rajohapur PWS
1
2
2637
2023
2038
2053
06-Jan-2022
23-Jul-2024
07-Jun-2024
24-Jul-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1363
Auraiya
GVPR
20091142
Tilakpur Sahar PWS
1
2
1313
2023
2038
2053
01-Jun-2022
24-Mar-2024
23-Mar-2024
25-Mar-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1364
Bijnor
LC INFRA
8360413
TIRPURI VILLAGE WATER SCHEME
2
2
1447
2022
2037
2052
30-Sep-2023
11-Dec-2023
10-Jun-2024
11-Jun-2024
Approved
Every thing complete
Approved
Every thing is completed.
View
1365
Amethi
Gayatri Projects LTD
20085858
TRILOKPUR WATER SUPPLY SCHEME
2
7
3423
2023
2038
2053
13-Sep-2024
10-Apr-2024
20-Jul-2024
25-Nov-2024
Approved
Hardcopy submitted
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
View
1366
Farrukhabad
Vindhya-GAJA (JV)
20091718
TURKIPUR MVS
2
2
2719
2023
2038
2053
30-Nov-2024
05-Aug-2024
01-Dec-2024
02-Dec-2024
Approved
All the parameters of scheme verified can take in O&M
Approved
ok
View
1367
Jaunpur
AFCONS
20058702
TUSAURI VILLAGE WATER SUPPLY SCHEME
2
6
2687
2023
2038
2053
31-Dec-2024
16-Jan-2024
10-Mar-2025
10-Mar-2025
Approved
Checked and Found Ok.
Approved
ok
View
1368
Kanpur Dehat
VSA
20092630
Tutuapur
1
4
2370
2023
2038
2023
30-Apr-2023
02-Jan-2024
14-Apr-2024
15-Apr-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found atisfactory
View
1369
Kanpur Dehat
VSA
20094293
udaipur
2
2
1659
2023
2038
2023
01-Dec-2024
20-Dec-2024
01-Apr-2024
02-Apr-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
1370
Balrampur
Larsen & Toubro Ltd
20016395
Udaipur water supply scheme
2
5
1627
2022
2037
2052
30-Dec-2024
06-Feb-2024
06-May-2024
07-May-2024
Approved
OK
Approved
Ok......
View
1371
Kannauj
GVPR
20077115
UDAITAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
2
2
2241
2023
2038
2053
08-Sep-2024
13-Apr-2024
16-Jul-2024
17-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1372
Sultanpur
UNIVERSAL MEP
20064763
UGHARPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
4
3460
2023
2038
2053
12-Jan-2024
12-Jan-2024
20-Jan-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
1373
Farrukhabad
Vindhya-GAJA (JV)
20076888
UJARAMAU NAYAGAON SVS
1
3
2744
2023
2038
2053
30-May-2025
10-Jun-2024
10-Jun-2024
11-Jun-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
1374
Meerut
Power Mech Projects Ltd
20082984
UKASIA
1
1
1617
2022
2037
2052
31-Dec-2024
30-May-2024
20-Oct-2024
25-Jan-2025
Approved
Recommended for further Approval
Approved
approved
View
1375
Ambedkar Nagar
Vindhya-GAJA (JV)
20026103
UKRA WATER SUPPLY SCHEME
1
6
3152
2023
2038
2053
28-Sep-2023
01-Jan-2025
01-Jan-2025
02-Jan-2025
Approved
checked and verified
Approved
Scheme completed
View
1376
Ayodhya
UNIVERSAL MEP
20031485
UMAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
4580
2023
2038
2053
12-Oct-2023
20-Feb-2024
20-Feb-2024
01-Feb-2025
Approved
FOUND OK
Pending
View
1377
Fatehpur
Power Mech Projects Ltd
20097485
UMARA
1
3
2360
2023
2038
2058
15-May-2023
30-Jun-2025
08-Dec-2024
09-Dec-0004
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of September (09.09.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
1378
Bijnor
LC INFRA
20014092
UMARPUR WATER SUPPLY SCHEME
2
2
1941
2022
2037
2052
29-Sep-2023
11-Dec-2023
09-Jun-2024
10-Jun-2024
Approved
Every thing complete
Approved
Every thing complete
View
1379
Fatehpur
Power Mech Projects Ltd
20102041
UMRA
1
1
1670
2023
2038
2053
20-Sep-2024
23-Feb-2025
22-Feb-2025
23-Feb-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of November (23.11.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
1380
Shahjahanpur
NCC Ltd.
20015680
UMRAHA
1
1
2730
2022
2037
2052
09-Jan-2024
31-Dec-2024
09-Apr-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Umraha scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Umraha scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1381
Meerut
Power Mech Projects Ltd
20098109
UPLEHRA
1
1
1990
2023
2038
2053
31-Dec-2024
23-Jan-2024
10-Jun-2024
07-Nov-2024
Approved
Recommended for further Approvals.
Approved
approved
View
1382
Auraiya
GVPR
20087934
Urelalpur & Shahoopur PWS
2
5
3335
2023
2038
2053
06-Jan-2022
26-Mar-2024
25-Mar-2024
26-Mar-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1383
Kanpur Dehat
Indian Hume Pipe
8361986
URSAN
1
2
4095
2022
2037
2052
15-Sep-2021
31-Dec-2024
31-Dec-2023
01-Jan-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
1384
Mau
LC INFRA
20011546
USARI KHURD GP WATER SUPPLY SCHEME
2
7
4732
2022
2037
2052
26-Apr-2023
11-Dec-2024
11-Dec-2024
12-Dec-2024
Approved
Approved..
Approved
approve
View
1385
Amethi
Vindhya-GAJA (JV)
20066641
UTTARGAON WATER SUPPLY SCHEME
1
16
3726
2023
2038
2053
06-Jan-2024
15-Jun-2024
15-Sep-2024
16-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance
View
1386
Ayodhya
UNIVERSAL MEP
20030212
VAJIDPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
3170
2023
2038
2053
12-Oct-2023
15-Jul-2024
15-Jul-2024
01-Feb-2025
Approved
FOUND OK
Pending
View
1387
Amethi
Gayatri Projects LTD
20099387
VATIYA WATER SUPPLY SCHEME
1
1
2173
2022
2037
2052
27-Nov-2024
07-Jun-2024
11-Sep-2024
15-Jan-2025
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
1388
Farrukhabad
Vindhya-GAJA (JV)
20092026
VEERPUR MVS
2
5
3139
2023
2038
2023
30-Nov-2024
09-May-2024
02-Sep-2024
03-Sep-2024
Approved
All the parameters of scheme verified can take in O&M
Approved
ok
View
1389
Ayodhya
VSA
20051242
VIJAYPUR SHAJAHARA
2
14
3181
2023
2038
2053
24-Nov-2023
30-Mar-2025
20-Aug-2025
25-Aug-2025
Approved
FOUND OK
Pending
View
1390
Sultanpur
UNIVERSAL MEP
20066606
VIKANA & SOMNABHAR GROUP OF GRAM PANCHAYAT WATER SUPPLY SCHEME
2
8
6040
2023
2038
2053
12-Jan-2024
12-Jan-2024
19-Nov-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
1391
Ayodhya
VSA
20055757
VINAYAKPUR WSS
1
4
3380
2023
2038
2053
24-Nov-2023
31-Mar-2025
05-Aug-2025
18-Aug-2025
Approved
FOUND OK
Pending
View
1392
Sultanpur
UNIVERSAL MEP
20066453
VINAYKPUR & KOTA GRAM PANCHAYAT WATER SUPPLY SCHEME
2
13
4340
2023
2038
2053
12-Jan-2024
12-Jan-2024
11-May-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
1393
Meerut
Power Mech Projects Ltd
20066751
WALIDPUR
1
1
3352
2023
2038
2053
07-Mar-2023
06-Jun-2024
22-Oct-2024
01-Dec-2024
Approved
Recommended for further Approvals.
Approved
approved
View
1394
Fatehpur
Power Mech Projects Ltd
20100818
YOHAN
2
4
2100
2023
2038
2053
13-Aug-2024
30-Jun-2025
07-Feb-2025
08-Feb-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of November(08.11.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
1395
Ghaziabad
LC INFRA
20026210
YUSUFPUR ISHAPUR PWS SCHEME
1
1
3075
2022
2037
2052
08-Aug-2023
31-Oct-2024
28-Feb-2025
01-Mar-2025
Approved
Satisfactory on the work. All civil works and E&M works are completed.
Approved
All Work Completed
View
1396
Mau
LC INFRA
20023719
YUSUPH PUR WATER SUPPLY SCHEME
2
5
2387
2022
2037
2052
25-Feb-2024
22-Apr-2025
22-Apr-2025
23-Apr-2025
Approved
Approved
Approved
approve
View
1397
Meerut
Power Mech Projects Ltd
20011234
ZAFRABAD DURVESHPUR
1
1
2371
2022
2037
2052
31-Dec-2024
10-Dec-2022
20-Mar-2023
24-Nov-2024
Approved
recommended for Further approval
Approved
approved
View